|
ECR/S&T/Tech Circular/185
|
28.01.2009
|
Tech.Circular No. 14
|
Provision for Earthling for Signalling Equipments
|
| ECR/S&T/Tech Circular/185 |
03.03.2009 |
Tech.Circular No. 15 |
Disconnection of Interlocked Signalling Gear for inspection /Maintenance/Repairing/Testing of Interloceked Interlocked Signalling Gear |
| ECR/S&T/Tech Circular/185 |
30.9.2009 |
Tech.Circular No. 16 |
Installation &Maintenance practice of LED lit Signals |
| ECR/S&T/Tech Circular/185 |
13.10.209 |
Tech.Circular No. 17 |
Reliability of Plug in Type Relays |
|
ECR/S&T/Tech Circular/185
|
06.03.2009
|
Tech.Circular No. 18
|
Use of Screwless & Solderless Terminals for Location Boxes, Relay Room & Control cum Indication Panel Terminations in place of ARA Terminals
|
|
ECR/S&T/Tech Circular/185
|
01.04.2009
|
Tech.Circular No.19
|
Provision of Data Logger their functional requirements & Exception Report
|
|
ECR/S&T/Tech Circular/185
|
|
Tech.Circular No. 20
|
Signal Interlocking Plan & Numbering System
|
|
ECR/S&T/Tech Circular/185
|
10.10.2009
|
Tech.Circular No. 21
|
Provision of RDSO approved fuses in different Signalling Cicuits
|
|
ECR/S&T/Tech Circular/185
|
25.03.2013
|
Tech.Circular No. 22
|
Pre monsoon precaution to be taken by S&T & Engg. Department in connection with efficient functioning of S&T equipments
|
|
ECR/S&T/SIG/Policy/200/Pt-1
|
07.09.2007
|
Policy Circular No.1
|
Rationlisation of No. of cable core for various Signallig Cable
|
|
|
|
|
|
|
ECR/S&T/SIG/Policy/200/Pt-1
|
10.01.2008
|
Policy Circular No. 3
|
Policy regarding provision of Shunt Signal and Clearance of Loop Line Starter
|
|
ECR/S&T/SIG/Policy Circular
|
31.03.2008
|
Policy Circular No. 4
|
AMR/AMRR of modern Signalling Equipments (IPS, Data Logger,EI & SSDAC/BPAC)
|
|
ECR/S&T/SIG/Policy Circular
|
16.04.2008
|
Policy Circular No.5
|
Modification of minimum eligibility criteria for Works Tender
|
|
ECR/S&T/Tele Policy/135
|
01.04.2008
|
Policy Circular No. 6
|
Monsoon precaution to be taken before hand for various Telecom Equipment
|
|
ECR/S&T/Tele Policy/135
|
08.05.2008
|
Policy Circular No.7
|
AMC/AMRR of Modern Telecom Equipment
|
|
ECR/S&T/SIG/Policy Circular
|
05.06.2008
|
Policy Circular No. 8
|
Policy for laying Signal & Power cable through RCC duct , Solar based Power supply for stations and LC in non RE area and Ring main arrangement at major stations & Auto section
|
|
ECR/S&T/SIG/Policy Circular
|
13.02.13
|
Policy Circular No. 9
|
Procurement of Sliding Boom through Works Contract
|
| ECR/S&T/SIG/Policy Circular |
12/26.08.2013 |
Policy Circular No. 10 |
Policy for laying of Power cable, Cables crossing from culverts & from J.B" (Main) to basement (Cable duct room) of Relay Room and Alarm for failure of track chargers using potential free contacts. |
| ECR/S& T/Sig/Policy/200 Pt.1I |
26/6/14 |
|
Cable protection arrangement |
| ECR/S&T/Sig/Maintenance/Pt-III |
21.08.2014 |
|
Checklist of IPS and Data Logger for Joint Signature
during AMC visit |
| ECR/S&T/Sig/Policy/200/Pt.III |
24.07.2014 |
|
Irregularities in the works of trenching, laying of
cables-System improveinent. |
| ECR/S& T/Sig / Maintenance/Pt.III |
02/7/2014 |
|
Safety drive for level crossing gate.
|
| ECR/S&T /SIG / Maintenance/Pt-II |
03.11.2014 |
|
Winter precautions for Signalling System. |
| ECR/S&T/SIG/Maintenance/Pt-III |
28.01.2015 |
|
Summer Precaution |
| Format for Installation Check List |
|
|
Format for Installation Check List |
| ECR/S&T/SIG/Policy/200/Pt.III |
01.04.2016 |
Policy Circular No.-11 |
Rationlisation of No. of cable core for various Signallig Cable |
| 2015/Sig/Air- Conditioning |
07.12.2015 |
|
Provisioning of Air Conditioning for Signalling Installation. |
| ECR/S&T/SIG/FAILURE/182/Pt.VII |
01.05.2015 |
|
Facility available in Panel for efficient operation of Signalling System |
| |
|
|
|
| ECR/S&T/SIG/POLICY/200/Pt-III/522 |
23/24.06.15 |
|
provision of porta cabins in ST installation |
| ECR/S&T/STY/184/Pt-II |
16.06.2015 |
|
Safety measures of prevention of Fire Hazard in S&T Installation |
| ECR/S&T/SIG/POLICY/200/Pt-III/1176 |
07.10.2015 |
|
Submission of precommissioning checklist |
|
|
|
|
Maintenance of Signalling equipments at Divisional Level |
|
|
|
|
|
|
|
|
|
| Policy for type of interlocking |
|
| 2015/SIG/Non Gaz./I |
|
|
| Guide lines for Uniform for S&T maintenance employee |
|
| ECR/S&T/SIG/Policy/200/Pt-IV/972 |
30.09.2019 |
|
To execute any alteration at Site to ensure safety |
| Technical Circular No. 01/2020 |
07.08.2020 |
Technical Circular No. 01/2020 |
Use of RDSO approved fuses in different Signalling Circuits |
| ECR/S&T/SIG/POLICY/200/PT-IV |
06.10.2020 |
|
Provision of Safety Point Alarm/ Point reversal alert based on data loggere |
| ECR/S&T/Sig/Policy/200/Pt.-IV |
06.10.2020 |
|
Permissible length of reliable working of Block Instruments/DACs |
| ECR/S&T/Sig/Policy/200/Pt.-IV |
21.09.20 |
|
Technical Specifications of Automatic media changeover |
| ECR/S&T/Sig/Tech/185/Pt. VIII/974 |
30.09.19 |
|
Functioning of BPAC and Associated Axle Counter. |
| ECR/S&T/Sig/Policy/200/Pt.-IV/523 |
27.06.19 |
|
Air Conditioning of Relay Room provided with electronic interlocking system. |
| ECR/S&T/Sig/Policy/Pt-IV/2100 |
27.02.19 |
|
Safety Alarm generation by dataloggers. |
| ECR/S&T/Sig/Policy/Pt-IV/245 |
08.05.2019 |
|
Site Protection measures during Signal Maintenance Works. |
| ECR/S&T/Sig/Policy/Pt-IV/1961 |
05.02.2019 |
|
Direction given by Hon'ble MR during presentation on 07.12.2018. |
| ECR/S&T/Sig/Policy/Pt-IV/1056 |
04.11.2019 |
|
Picking up of arival departure time at stations by datalogger. |
| ECR/S&T/Sig/Policy/Pt-IV/694 |
01.08.2019 |
|
Lighting & Surge protection for Signalling Equipment. |
| ECR/S&T/Sig/Policy/Pt-IV/209 |
01.05.2019 |
|
Deputation of Officer for SAT |
| ECR/S&T/PCDO/Corresp/192/Pt-II/225 |
01.05.2019 |
|
Uniform & Protective gears for maintainers & helpers of S&T Department. |
| ECR/S&T/Sig/Policy/Pt-IV/1029 |
29.05.2018 |
|
Damage of Signal Post Ladder & Signal Unit fallen down by open door of wagons at Mahwal Station in SPJ Division on 17.05.2018 |
| ECR/S&T/Sig/Policy/Pt-IV/1489 |
29.10.2018 |
|
Shifting of Cables passing through bridges. |
| ECR/S&T/Sig/Policy/Pt-IV/142 |
27.06.2018 |
|
Providing Point Machines for operation of Non interlocked Points |
| ECR/S&T/Sig/Policy/200/Pt-IV |
27.11.2018 |
|
Monthly Limit for the opening of Relay Room |
| ECR/S&T/Sig/Policy/200/Pt-IV/1472 |
23.10.2018 |
|
Implementation of Draft JPO for handing of stores and maintenance of records thereof by field units for system improvement. |
| ECR/S&T/Sig/Policy/200/Pt.-IV/1441 |
23.10.2018 |
|
Development of grievance redressal system at divisions level |
| ECR/S&T/Sig/Policy/200/Pt.-IV/1674 |
12.12.2018 |
|
To provide scaling and locking arrangement in Signal Unit |
| ECR/S&T/Sig/Policy/200/Pt.-IV/1151 |
12.06.2018 |
|
Replacement of ordinary curve switches by thick web switches. |
| ECR/S&T/Sig/Policy/200/Pt-IV |
10.05.2018 |
|
Minimum standards for Track, Signalling, OHE etc for construction of new lines under NGR & JV model of Indian Railways Participative policy. |
| ECR/S&T/Sig/Policy/200/Pt.-IV |
09.10.2018 |
|
Provision of Axle Counter on bridges along with track circuit. |
| |
|
|
|
| |
|
|
|
| ECR/S&T/Sig/Policy/Pt-IV/1087 |
04.11.2019 |
|
Reliability Improvement measures |