Screen Reader Access Skip to Main Content Font Size   Increase Font size Normal Font Decrease Font size
Indian Railway main logo
खोज :
View Content in English
National Emblem of India

हमारे बारे में

हाजीपुर मुख्यालय

मंडल

समाचार अपडेट

निविदाओं और अधिसूचनाएं

हमसे संपर्क करें

प्रदायक सूचना



 
Bookmark Mail this page Print this page
QUICK LINKS
जे पी ओ


  • ECR/S&T/JPO/185-A/Part-II Dt 19.10.2023 JPO for Disconnection/Reconnection of S&T gears during regular maintenance and during rectification of failures.
  • ECR-HQ/S&T/Sig/JPO/185-A/Pt-IIDt.19.102023 JPO for Disconnection/Reconnection of S&T gears during regular maintenance and during rectification of failures
  • ECR/S&T/DRG/Policy Dt.11.10.2023 Joint Procedure Order for finalization of SIP
  • ECR-HQ/S&T/Sig/JPO/185-A/Pt-II Dt.30.08.2023 JPO for carrying out circuit alteration works existingfunctioner relay room
  • ECR-HQ/S&T/Sig/JPO/185-A/Pt-II Dt.24.08.2023 JPO for carrying out circuit alteration works in existing functional Relay room. For Ref. click here Rly Bd. Letter No. 2012/Sig/SF/2(Policy) Dt.20.07.2023.
  • To Executive Director / Signal Railway Bd. Dt. 26.07.2023 Joint Procedure Order- Disconnection/ Reconnection for S&T Gears.
  • ईसीआर/परि.संरक्षा/जे.पी./46/505 Dt. 19.06.2023 Dt.19.06.2023 रेलवे बोर्ड के संयुक्त कार्यविधि आदेश दिनांक - 10.06.2023 में सुधार किया गया है जिसका हिंदी संस्करण (एस और टी गियर्स के लिए डिस्कनेक्शन / रीकनेक्शन प्रोटोकॉल)for Ref: click here Rly.Bd. LetterNo. (1) 2023/TT-IV/9/2 Dt. 16.06.2023 (2) No. 2021/Sig/21/Safety Performance Dt. 10.06.2023                                                                                                                                                                                       
  • ECR-HQ0SnT(GENL)/31/2020 Dt.05.06.2023 विशेष परिस्थिती (जैसे आग लगना आदि) में रिले रूम / बैटरी रूम / आईपीएस रूम / ओएफसी हट जहां पर लगे डबल लॉक (जहां लगे है) को खोलने के संबंध में                               
  • ECR-HQ0SnT(GENL)/31/2020-O/o Dy.CSTE/HQ/ECR Dt.25.01.2023 Joint Procedure Order (JPO) regarding the joint inspection of Points & Crossings and Track Circuits and compliances of deficiencies noticed.                                                             
  • ECR/S&T/JPO/185-A/PT-1/1490 Dt. 24.01.2020 Joint Procedure order No. 1/2020 for removing obstruction from Point. Joint Procedure Order No. 04/2009 Train Operation in case of failure of Point                                                                 
  • South Central Railway Letter No. Engg/TC-1/GJ Fracture/Vol-II/31 Dt. 04.04.2012 Corrigendum to Revised Joint procedure order for Installation and Maintenance of Glued Joints.




Source : CMS Team Last Reviewed : 22-02-2024  


  प्रशासनिक लॉगिन | साईट मैप | हमसे संपर्क करें | आरटीआई | अस्वीकरण | नियम एवं शर्तें | गोपनीयता नीति Valid CSS! Valid XHTML 1.0 Strict

© 2010  सभी अधिकार सुरक्षित

यह भारतीय रेल के पोर्टल, एक के लिए एक एकल खिड़की सूचना और सेवाओं के लिए उपयोग की जा रही विभिन्न भारतीय रेल संस्थाओं द्वारा प्रदान के उद्देश्य से विकसित की है. इस पोर्टल में सामग्री विभिन्न भारतीय रेल संस्थाओं और विभागों क्रिस, रेल मंत्रालय, भारत सरकार द्वारा बनाए रखा का एक सहयोगात्मक प्रयास का परिणाम है.