Screen Reader Access Skip to Main Content Font Size   Increase Font size Normal Font Decrease Font size
Indian Railway main logo
Search :
View Content in Hindi
National Emblem of India

About Us

Hajipur H.Q.

Divisions

News Updates

Tenders

Contact Us

Supplier Information

Divisions
   Sonpur
      Operating


 
Bookmark Mail this page Print this page
QUICK LINKS
Operating

                                   OPERATING DEPARTMENT

  1.0  ORGANISATION CHART

                       Sachin Kumar Mishra

                                                               Sr. DOM

                                         

   Manoj Kumar Ranjan                    Manoj Kumar                                                  DOM                                       SD/MFP

                                                                                                                                                                                                                      

                                                                                                                                                             

            Paras Kumar Singh                    Vinod Kumar                            Arvind Kumar

                AOM (Plg)                                   AOM/Chg                                     AO/BJU

                                

         INTRODUCTION:

2.1     Route KMs                                :         525.01

                                              (D spl - 451.0, E route– 74.01).

2.2     Crossing Stations                     :       68 (Excl. SPJ)

2.3     Special Class Station               :       01(One train only system – VSHI)

2.4     Halt/Flag                                  :        27

2.5     Special Halt                             :        02 (One train only system – GTH, LLJP)

2.6     Signaling & Interlocking           :        Standard Interlocking II®

2.7     IBH in division                         :         Bet. BJU-TGA, DGA-BAGL & PSR- NNR.

2.8     No. of Goods Shed                 :         13

2.9     Industrial/Private Siding          :         05


3.0    GENERAL INFORMATION :-

Type of Station

No. of Stations

Crossing Station :

68 (Excluding Samastipur)

Flag/Halt :

27

Total  :

95 (Excluding Samastipur)

                3.1  Classification of Station in Sonpur Division:

Category of stations

Name of stations

NSG 1 - 00

---

NSG 2 - 01

MFP

NSG 3 - 04

SEE, HJP, BJU, KGG

NSG 4 - 03

BGS, MNE, NNA

NSG 5 - 19

DGA, DES, MNO, SPP, MOG, GRL, DOL, KRBP, DSS, BCA, LKN, SKJ, MSK, PSR, NNR, THB, KUE, CRR, SMO

NSG 6 - 45

GJH, BAGL, ATNR, STLR, NYO, PMU, PHLG, CKRD, AYRN, CSR, BDUA, SDG, NNNL, VPDA, GWH, VSHI, LLJP, HUFP, SAI, BTHL, BNR, KHI, TUR, RD, NRPA, SLT, SSO, DUBH, KPGM, UJP, NAZJ, STJT, TGA, BUJ, NBJU, DKGS, TIL, DPL, LAK, UMNR, SBDP, GAI, KHQ, KTRH, BKHR

The division caters the need of NF region and North Bihar. There are 13 nos. Rake handling siding and 05 nos Private sidings. The details are as under :-

3.2    Goods Shed over division :-


Name of Station & Handling Capacity

Capacity of Wagons

Traffic dealt with

Inward

Outward

Narayanpur Anant

L/15 & 19  – Half rake, L/18 & 21 - Full rake

Stone Chips, Salt, fertilizer, Coal,Food Grain, Clinker & Sand

--

Karpurigram

L/5 – Full rake ,

L/6 & 07 -  Half rake

Cement,Salt Fertilizer & Stone chips

--

Barauni

L/ 27 & 28 – Half rake

Cement, S/Chips, Food Grain & Fertilizer

C. P. Coke Maize

Khagaria

L/6 – Full Rake

Stone Chips, Cement, Salt, & Fertilizer

Maize

Naugachhia

L/4 – Full Rake

Cement, Salt, & Fertilizer

Maize

Sarai

L/4 – Full Rake

Cement, Fertilizer, Stone chips, Salt, Food Grain & Tractor

-----

Harauli Fatehpur

L/3 – Full Rake

Stone chips

---

Semapur

L/6 – Full Rake

--

Maize

Kursela

L/4 – Half rake

--

Maize

Mansi

L/7 – Full Rake

All commodities except POL

Maize

Nayagaon

L/5 – Full rake

Boulder, Stone Chips and Ballast.

----

Garhara

Sorting 6 – Full rake        (BOXN -58)

RPC (Raw petroleum coke)

---

Tilrath

L/6- Full Rake

Cement, Fertilizer, Food Grain & Bitumen

Maize



3.3    Private Sidings:-

Name of Station & Handling Capacity

Line no and its

Capacity of Wagons

Traffic dealt with

Inward

Outward

Bihar Thermal Power Station, Simaria.

L/1, 2 &  3

Full rake

Coal, Furnace oil

----

Indian Oil Corporation,

Barauni.

L/1, L/2,

L/3, L/4.

Half  Rake

POL

POL &RP Coke

PSC sleeper siding, Sarai.

L/5 & L-6.

Half rake

---

Sleepers

BPCL Private Siding, NarayanpurAnant.

L/1

Full rake

POL

----

FCI siding at NarayanpurAnant

L/1 to 

L/5

(Full rake placement including all lines

Food Grain

-----

3.4     Line capacity utilization of various sections (2021-22) :


Section

Double line or Single line

Charted

Capacity each way

Average Train services each way daily (In peak period)

%age Utilization of charted capacity

Without MB

With MB 

Without MB

With MB

Chapra Gramin – Sonpur

DL

50

42

49.73

99.46

118.40

Parmanandpur -Pahleja Ghat

SL

36

32

06.00

16.67

18.75

Pahleja Ghat - Sonpur

SL

36

32

21.17

58.81

66.16

Sonpur – Hajipur

DL

50

42

69.19

138.38

164.74

Hajipur - Muzaffarpur

DL

50

42

36.43

72.86

86.74

Muzaffarpur – Samastipur

DL

50

42

44.43

88.86

105.79

Samastipur – Bachhwara

DL

50

42

44.29

88.58

105.45

Bachhwara – Barauni

DL

50

42

76.93

153.86

183.17

Barauni – Dinkar Gram Semaria

T/SL

50

42

43.00

86.00

102.38

Sahebpur Kamal-Sabdalpur

SL

36

32

17.10

47.50

53.44

Sabdalpur – Umeshnagar

SL

36

32

09.30

25.83

29.06

Barauni – Khagaria

DL

50

42

45.57

91.14

108.50

Khagaria – Mansi

DL

50

42

59.56

119.12

141.81

Mansi – Koshi Block Hut

DL

50

42

40.21

80.42

95.74

Koshi Block Hut – Kursela

TSL

45

42

40.21

89.36

95.74

Kursela – Katihar

DL

45

40

40.21

89.36

100.53

Bachhwara– Sahdeibuzurg

DL

45

38

32.64

72.53

85.89

Sahdeibuzurg - Akshayvatrai Nagar

SL

22

18

32.64

148.36

181.33

                                                 

                                            OPERATING PERFORMANCE:

4.0  Coaching performance:-

4.1     Nos. of Coaching Trains running in Sonpur Division (In pairs)

Trains

Total Trains

Daily

Non-Daily

Mail/Exp.

123

32

91

Pass.

31

31

00

Total :

154

63

91



Type of Trains

Number (in pairs)

Garib Rath

03

Rajdhani Express

04

Super Fast Express

21

Mail/Express Trains

95

Passenger Trains

31

                            Total

154

                                                                                  
                         Number of Trains Originate/Terminate :

To/From Station

Number (in pairs)

Mail/Express

Passenger

Barauni

08

06

Muzaffarpur

13

07

Sonpur

0

05

Total

21

18

             

4.2      Comparative Punctuality Performance (M/Exp trains) :-


Month

2021-22

2022-23

% age variation

April

94.3

83.7

-10.6

May

96.3

    87.1

      -9.2      

June

96.0

    92.7   

      -3.3  

July

95.2

    96.1

       0.9

August

96.7

    

      

September

93.2

    

       

October

94.4

    

       

November

87.3

    

      

December

88.9

    

      

January

86.2

    

      

February

84.5

    

      

March

81.7

    

      

Overall

90.3

    

       

   

    Running of special trains :

    During 2022-23 (upto July'22), 7870 special trains run in comparison to 7566 special trains of last year.

 

Up to July

% Variation

 

2021-22

2022-23

 

No. of Special Trains

7566

7870

        4.01

 

   6.0     Goods performance:-

6.1     Goods performance in comparison to corresponding period of  last    

           financial year.


Items

2021-22

(up to July)

2022-23

(up to July)

    % VARIATION

Achieve-ment

Target

Achieve-ment

With

Target

with

L.Y.

Loading (MT)

0.871

0.84

1.088

29.5

24.9

POL (MT)

0.357

0.48

0.590

22.9

65.3

General Goods Incl. Maize (MT)

0.514

0.36

0.498

     38.3

-3.1

Wagon Interchange

965153

--

949572

--

-1.6

Freight Train Interchange

20710

--

20533

--

-0.8

WTR

1.10

--

1.01

--

-8.2

Wagon Holding

3056

--

2982

--

-2.4

Diesel Utilization

261

--

412

--

57.8

Diesel outage

28.4

--

22.8

--

-19.7

Electric utilization

219

--

390

--

78.1

Electric outage

41.0

--

47.6

--

16.1


6.2   Inward rakes comparative figures :-


Terminals

Nos. of rake in

2021-22

(up to July)

Nos. of rake in

2022-23

(up to July)

%age

 variation

Naugachhia

126

102

-19.0

Khagaria

88

69

-21.6

Barauni

46

48

4.3

Garhara

146

104

-28.8

Karpurigram

188

200

6.4

NarayanpurAnant

377

404

7.2

Sarai

146

151

3.4

Nayagaon

34

59

73.5

IORG

32

27

-15.6

BTSS

107

197

84.1

TIL

154

120

-22.1

MNE

06

-100.0

HUFP

00

58

100.0

Total

1450

1539

6.1

















6.3   Outward rakes comparative figures :-


Terminal

Nos. of rake in 2021-22

Nos. of rake in 2022-23 

%age

(up to July)

(up to July)

variation

Semapur

39

29

-25.6

Kursela

33

29

-12.1

Naugachhia

17

14

-17.6

Mansi

42

32

-23.8

Khagaria

42

27

-35.7

Barauni

9

13

44.4

IORG

137

224

63.5

NRPA

2

1

-50.0

GHZ

1

5

400.0

KPGM

0

6

100.0

TIL

0

1

100.0

Total

322

381

18.3


7.0   Staff position of Safety category as on 01.08.2022:-


Category

BOS

On roll

Vac.

Remarks

SM/ASM/YM/TI

477

442

35

Guard

544

521

23

Shunting Master

30

07

23

Shuntman

72

80

+8

Pointsman

318

261

57

Gateman

375

212

163

Traffic Porter

118

342

+224



8.0 Status of Sanctioned works (As on 01.07.2022)  :-

Name of work

PH

Sanction year

Cost

(in thou.)

Status

Hajipur-Sagauli via Vaishali (148.3 km)

11

2003-04

20667800

Hajipur-Ghoswar section commissioned on 04.12.16. Ghoswar – Vaishali (30 Km)- Commissiomed on 10.04.2020. Vaishali- Deoria(30.0km) Targeted 2022 -23

Hajipur-Ramdaualu Nagar (47.72 km)

15

2013-14

5182723

Doubling between HJP-RD completed. Yard remodelling work of SAI station completed on 29.04.22.

Katreah-Kursela - Patch doubling incl. bridge on river Koshi (7.24 km)

15

2012-13

2512973

Katereah-Kursela (7.24 km) commissioned on 28.12.2021

Hajipur-Bachwara (72 km)

15

2015-16

9438625

Doubling between BCA-SDG completed. Doubling between HJP- AYRN commissioned on 24.03.22 & Final Phase from AYRN to SDG expected in Aug’22.

Barauni - Improvement of traffic facilities at bye pass station

16

2015-16

571865

Indoor - 80% completed (wiring in East outer OC Hut completed. Wiring in East cabin in progress. Outdoor works 60% completed (cable laying 205 Km completed out of 350 Km)

TDC : 30/09/2022

MNE: Provision of Shunt signal at both end in line no. 01, 02 & 03 and at KGG end in line no. 04.

16

2015-16

9189

Outdoor cabling & new relay room work completed. Indoor patching work restarted.

TDC : 15/09/2022

Katreah - New freight terminal

16

2016-2017

132951

Engg.- Earth & blanketing work completed of embankment portion. Track fit given on 19.07.22. Blanketing work of wharf portion & sleeper laying work in progress. Fabricated super structure to be completed by 30/9/22.  

S&T- SIP, ST, PFD, SWRD, SWR approved. CRS app. applied on 09/03/22. CRS observations received on 29.04.22. ESP & GAD under preparation in compliance of CRS observations. Outdoor works progress-30%. Indoor work- 10%.

TDC : 30/09/2022

Dubaha - Addl. loop

16

2016-2017

74000

Engg-  Earth work, retaining wall 100% completed. Blanketing  and P way material under transportation. 70% work completed. TDC- 31.10.2022

S&T-LOA issued on 19.08.2020. ESP, SIP, ST approved. Revised ESP with LC closure under approval. SIP, ST to be revised after approval of revised ESP. Outdoor works in progress - 40% completed.

Elect(G):- LOA issued on 09.11.2020. Work to start after completion of Engg. work.

TDC : 31/10/2022

MFP - Remodeling of MFP station.

16

2018-2019

412000

Engg work - Earth work completed. Track linking work in progress. 

S&T work - Indoor works - 20% completed (Relay rack grouting done. Tag block fixed). Outdoor works - 40% completed (Cable laying of 50 km out of 125 Km completed)

TDC : 31/08/2022

Provision of IBH in MNE-MSK section.

16

2019-20

46859

S&T-LOA issued on 17.11.2020.Revised IBH ESP & LC GAD approved on 15.06.22 in compliance of CRS observations. MSK & MNE SIP approved in compliance of CRS observations. Outdoor & Indoor works completed at IBH. MSDAC installation pending.

Engg.-LOA issued on 22.09.2020. Work completed.

Elect.(G): Wiring work completed. Supply will start after installation of AT by TRD.

TDC : 15.08.2022

Provision of x-over instead of Derailing switch at 18 nos location.

16

2019-20

75938

Engg - ESP of 08 feasible stations (TIL, UJP, RD, TUR, KHI, BNR, SAI & DGA) approved. Tender to be opened 18/08/22.

S&T - Tender opened on 25/5/22. LOA issued on 5/7/22. SIP under preparation.

TDC : 31/03/2023

Provision of IBH between SMO- KIR.

16

2019-20

49734

S&T : SIP of SMO approved. SIP of KIR is required to be altered & approved from NF Railway. Sr DSTE/KIR has been requested  for alteration and approval of SIP of KIR. TDC: Oct-22. Trenching & cable laying work in progress. 10% completed.

Engg: Building ready. 

Elect: (a) Electrical wiring completed. (b) UP AT & DN AT of 10KVA rating each is yet to be provided.

TDC : 31/10/2022

Provision of IBH in SPJ-UJP section.

16

2019-20

45434

S&T : Approval of SIP is under process. Trenching, cable laying, Equipment installation work is under progress. MSDAC (20 DP) supplied.

Engg: Building is ready at UJP and at IBH. But building at SPJ is under construction.

Elect: (a) Electrical wiring at UJP & at IBH is completed.(b) Electrical wiring will be required at SPJ after building is ready (c) Presently 5KVA UP AT & DN AT provided is yet to be provided.

TDC : 31/08/2022

DGA-BAGL :- Provision of IBH at Avtarnagar Halt between DGA-BAGL

16

2019-20

47737

IBH commissioned on 10-Dec-21. Completion diagram under process.

Provision of IBH in BCA-TGA section.

16

2019-20

45618

S&T : ESP of Majnupur Nawada and SIP of BCA-TGA section approved. SWR of BCA & TGA regarding IBH Majnupur Nawada is approved. CRS sanction obtained. Outdoor work completed. Indoor work is almost completed. MSDAC (20 DP) supplied and is under process of installation. 90% completed.

Engg & Elec work completed.

TDC : 20/08/2022

Nazirganj -  Provision of directional loop line

16

2019-20

134356

Engg.: LOA issued on Dt.24.03.2022. Earth work 80% completed.

S&T: LOA issued on 14.03.2022. ESP & SIP approved. ST under approval, store items under procurement. 

TDC : 31/01/2023

Muzaffarpur- Construction of 40 Bedded (2x20 bed) new Running Room

16

2019-20

16875

All civil work completed as per approved drawing. Further additional kitchen has been requested by Sr. DEE/OP on 02.07.2022. Alteration in drawing under process. Physical work of additional kitchen not started. TDC - 30.09.22.

Elect.(G): Wiring to be completed by 20.07.22, AC installation : 30.07.22

TDC : 30/09/2022

Samastipur Jn.~~Barauni Jn~~Provision of automatic block signalling with centralised traffic control system

16

2021-22

1224000

Detailed estimate under vetting.

TDC : 30.06.2024

Provision of IBH in SEE-HJP section.

16

2021-22

44993

Detailed estimate under preparation.

Provision of IBH in BCA-VPDA section.

16

2021-22

45004

Detailed estimate under preparation.

Provision of IBH in MFP-RD section.

16

2021-22

44904

Detailed estimate under preparation.

Provision of shunt signal at SMO connecting to good shed line.

16

2021-22

10676

Engg - Tender to open on 01.08.22.

S&T - Re-tender uploaded, opening date - 17.08.22.

TDC : 31.12.2022

Provision of shunt signal at KGG in line no.03 & T/W shed.

16

2021-22

6159

Engg - Tender to open on 01.08.22.

S&T - Re-tender uploaded, opening date - 17.08.22.

TDC : 30.11.2022

Provision of shunt signal at NNA Goods shed.

16

2021-22

4352

Engg - Tender to open on 01.08.22.

S&T - Re-tender uploaded, opening date - 17.08.22.

TDC : 31.01.2023

Construction of 20 Bedded new Running Room at MNE

16

2021-22

15480

Detailed estimate sanctioned. Tender opened on 27/07/22.

TDC : 31.01.2023





Source : East Central Railways / Indian Railways Portal CMS Team Last Reviewed : 05-08-2022  


  Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.