Screen Reader Access Skip to Main Content Font Size   Increase Font size Normal Font Decrease Font size
Indian Railway main logo
Search :
View Content in Hindi
National Emblem of India

About Us

Hajipur H.Q.

Divisions

News Updates

Tenders

Contact Us

Supplier Information

Divisions
   Danapur
      Operating


 
Bookmark Mail this page Print this page
QUICK LINKS
Operating

OPERATING BRANCH






Organisation set up

INTRODUCTION


NUMBER OF STATIONS: 258.

Block Station

104

Flags

14

IBH

11

Halt

129

Total

258

INTERLOCKING SYSTEM AT STATIONS:

RRI

3 (JAJ, PNBE, DNR)

CPI

58

EI

43

IBH

11

Total

115

           

CONTROL BOARD :

SECTIONAL CONTROL BOARD

JURISDICTION

JAJ BOARD

·BKP - JAJ

·RDUM – BJU

·TAL - BJU

AREA BOARD

·BKP -BTA

·DNR to PHLG

·PWS to PHLG

DDU BOARD

·BTA to DDU

PG & KG BOARD

·GAYA – PNBE

·GAYA – KIUL

RGD BOARD

·FUT-NES

·BKP - TIA

EXISTING ROOT KM:

Category

Rout Km.

Remarks

Electrified

860.05

Non Electrified

69.971

Non operative section :

BEHS-ASTHWANA

SHK-SARSA JAMALPUR

TIA-KRUH

JTDM-DHWN

Single Line

323.533

Double Line

554.25

Triple Line

17.52

BKPL-BARH

COACHING TRAIN DETAILS:

M/EXP GROUP

Type of trains

No. of Trains

VNDB

4

RAJ

8

DRNT

4

GBR

6

JSH

6

SUVD

2

SUF

94

M/EXP

204

TOTAL

328

PASSENGER GROUP

PSPC

138

TOD

45

TOTAL

183

TOTAL CHG TRAINS

511

Type of Passenger Trains : 138.

Type of trains

Number

MEMU

98

DEMU

6

Conventional

34

Total

138

Number of Originating/Terminating Trains : (in terms of pair)

S.N.

Station

Mail/Express

DEMU

MEMU

Conventional

1

PNBE

39

NIL

24

3

2

DNR

10

NIL

3

1

3

RJPB

10

NIL

NIL

NIL

4

RGD

3

NIL

4

NIL

5

IPR

2

NIL

2

NIL

6

JAJ

NIL

NIL

4

1

7

PPTA

9

NIL

4

NIL

8

KIUL

1

3

5

4

9

ARA

3

NIL

4

2

10

MKA

1

NIL

3

1

11

RPR

NIL

NIL

1

NIL

12

BXR

NIL

NIL

5

NIL

13

FUT

NIL

NIL

3

NIL

14

BKP

NIL

NIL

3

NIL

15

DLN

NIL

NIL

NIL

4

16

TIA

NIL

NIL

NIL

1

17

TRG

NIL

NIL

NIL

3

18

NES

NIL

NIL

1

NIL

19

HIL

NIL

NIL

1

NIL

Commuter Trains: 10.

Train no.

Section

Type

03217/03218

MKA - DNR

MEMU

03261/03262

FUT - BXR

MEMU

03231/03232

RGD - DNR

MEMU

03264/03211

PNBE - GAYA

MEMU

03284/03283

PNBE - BJU

MEMU

INTERCHANGE POINTS: 10.

Inter Railway

03-JAJ, KIUL & TRG (Eastern Railway & NER)

Inter Divisional

07-EOCM, ARA, MPO, PMI, DKGS (SEE), PHLG (SEE) & BNF (DHN)

FREIGHT TRAFFIC:

·Division is having Stone chips/ballast traffic with Sheikhpura Goods shed, Shiekhpura Public Siding (SPES) & Sirari (SRY) as a major source of outward Goods Traffic. Besides, Sand is loaded from Kiul, Jhajha, Wazirganj & Sirari, Cement is loaded by Ultratech from UCPD, and a few food grains loading from Jehanabad, Warisaleganj, Wena, Fatuha, MPIB/Bihta&Kheraundh.

·However, there is regular inward Goods traffic at few Goods shed over the division. The major commodities are Coal from BSPB/Barh, CLKR & SLAG at UCPD and food grains, cement, fertilizer, salt, Clkr etc. with Steel at Fatuha& Danapur Goods shed.

Railway Goods Shed : 21

Terminal

Rake Capacity

Timing

INWARD(Avg. Rake/Month)

OUTWARD(Avg. Rake/Month)

Outward Commodity

BXR

FULL RAKE

06.00-22.00

13

2

Food Grain

ARA

FULL RAKE

06.00-22.00

19

3

Food Grain

DNR

FULL RAKE

Round the clock

26

NIL

-

FUT

FULL RAKE

Round the clock

75

NIL

-

KIUL

FULL RAKE

06.00-22.00

9

0.5

Food Grain & Sand

JMU

FULL RAKE

06.00-22.00

18

NIL

-

SHK

FULL RAKE

Round the clock

NIL

2

Stone Chips

WRS

FULL RAKE

06.00-22.00

22

NIL

-

JHD

HALF RAKE

06.00-22.00

10

2

Food Grain

WENA

FULL RAKE

06.00-22.00

15

1

Food Grain

MKA

HALF RAKE

06.00-22.00

NIL

NIL

Food Grain

CKH

FULL RAKE

06.00-22.00

NIL

NIL

Food Grain

ANAH

FULL RAKE

06.00-22.00

NIL

NIL

Fly Ash

LKR

HALF RAKE

06.00-22.00

NIL

NIL

Sand

WZJ

HALF RAKE

06.00-22.00

NIL

NIL

Sand

KRUH

FULL RAKE

06.00-22.00

NIL

NIL

Food Grain

DHA

FULL RAKE

06.00-22.00

NIL

3

RMC (Ballast)

JAJ

FULL RAKE

06.00-22.00

NIL

10

Sand

SRY

FULL RAKE

06.00-22.00

NIL

NIL

Sand & Stone

DURE

FULL RAKE

06.00-22.00

NIL

NIL

I/WSand & Stone

KUA

FULL RAKE

06.00-22.00

NIL

NIL

Sand

Private Siding : 08

Sidings

Timing

INWARD (Avg. Rake/ Month)

OUTWARD (Avg. Rake/Month)

Outward Commodity

FCPD (FCI/PWS)

06.00-22.00

8

NIL

-

FCMI (FCI/MKA)

06.00-22.00

7

NIL

-

FFSB (FCI/BXR)

06.00-22.00

4

NIL

-

BSPB (NTPC/BARH)

Round the clock

250

NIL

-

HPSB (HPCL/BTA)

06.00-22.00

18

NIL

-

MPIB (PFT/BTA)

Round the clock

26

9

Food Grain, container

UCPD (UCPD/DHWN)

06.00-22.00

65

70

Cement

FCON (CONCOR/FUT)

06.00-22.00

12

9

Container, Food Grain

Public Siding : 01

Terminal

Rake Capacity

Timing

INWARD (Avg. Rake/ Month)

OUTWARD (Avg. Rake/ Month)

Outward Commodity

SPES (Shiekhpura Public Siding Extension)

FULL RAKE

06.00-22.00

Nil

Nil

Stone Chips

 

OPERATING STATISTICS  (JUN 2024)

S.N.

INDICES

MONTHLY

CUMMULATIVE

JUN-2023

JUN-2024

% VAR.

2023-24 (APR-JUN)

2024-25 (APR-JUN)

% VAR.

FREIGHT PERFORMANCE

1

Freight Loading :

 

 

 

 

 

 

 

Weight (MT)

0.236

0.309

30.9

0.766

0.831

8.5

 

Rakes (Total)

91

123

35.2

301

343

14

 

Rake/Day

3

4

35.2

3

4

14.0

 

Wagons (Total)

3989

5322

33.4

13329

15031

12.8

 

Wagon/day

133

177

33.4

146

165

12.8

 

CEMENT

0.161

0.224

39.1

0.463

0.593

28.1

 

SAND

0.035

0.048

37.1

0.151

0.094

-37.7

 

FOOD GRAIN

0.024

0.019

-20.8

0.073

0.053

-27.4

 

CONTAINER

0.008

0.012

50.0

0.033

0.043

30.3

 

STONE CHIPS

0.008

0.000

-100

0.008

0.016

100.0

2

Interchange :

 

 

 

 

 

 

 

Wagon/Day

5896

6192

5.0

6253

6357

1.7

 

Total Train Interchange

3515

3678

4.6

11360

11374

0.1

 

Trains/Day

117

123

4.6

125

125

0.1

3

Wagon Bal. & T/Round

 

 

 

 

 

 

 

Wagon Balance (W/D)

3286

3453

5.1

3202

3372

5.3

 

Wagon turn round (Day)

1.41

1.32

-6.4

1.30

1.25

-3.8

4

Unloading :

 

 

 

 

 

 

 

No. of Rakes (Total)

475

555

16.8

1552

1744

12.4

 

Rake/Day

16

19

16.8

17

19

12.4

5

Terminal Detention :

 

 

 

 

 

 

 

Terminal Detn. (UNLDG)

14:37

16:21

11.9

13:42

16:54

23.4

 

Terminal Detn. (LDG)

18:32

15:47

-14.8

17:46

15:54

-10.5

4

Engine Utilization :

 

 

 

 

 

 

 

Diesel Engine Utlz (Kms)

124

375

202.4

128

378

195.3

 

Elect. Engine utilz (Kms)

322

371

15.2

328

385

17.4

5

Avg. Speed of F/Trains

 

 

 

 

 

 

 

Excluding Stabling & Yard

43.64

27.58

-36.8

42.40

27.93

-34.1

 

Including Stabling & Yard

16.13

11.50

-28.7

16.76

12.09

-27.9

6

NTKM (Goods)

 

 

 

 

 

 

 

NTKM (Org. Goods) in mill.

49.69

74.15

49.2

156.03

214.15

37.2

 

NTKM (Assorted) in mill.KM

571

678

18.7

1905

2167

13.8

 

GTKM (in Mill KM)

949

 

-100.0

3107

 

-100.0

 

Avg. Leed (in KM)

 

 

#DIV/0!

 

 

#DIV/0!

 

NTKM/W-D (Avg.)

5788

6566

13.4

6566

7082

7.9

 

WKM/W-D (Avg. )

169

175

3.6

188

185

-1.6

9

CRACK TRAINS & LONG HAUL

 

 

 

 

 

 

 

JAJ-MFP

0

63

 -

31

203

555

 

TIA-HZB

0

99

 -

1

341

34000

 

DNR-PRYJ

0

0

 -

0

3

 -

 

KIUL-KIR

0

48

 -

0

178

 -

 

TOTAL

0

210

 -

32

725

2166

 

LONG HAUL

0

13

 -

0

38

 -

7

TOTAL TRAFFIC (COACHING+ FREIGHT)

 

COACHING TRAINS

9309

10236

10.0

27739

31150

12.3

 

FREIGHT TRAINS

3515

3678

4.6

11360

11374

0.1

 

TOTAL TRAFFIC

12824

13914

8.5

39099

42524

8.8

 

TOTAL TRAINS PER DAY

427

464

8.5

430

467

8.8

COACHING PERFORMANCE

1

Coaching Trains (Nos.):

 

 

 

 

 

 

 

M/Exp Group

4976

5326

7.0

15028

16223

8.0

 

Passenger Group

4333

4910

13.3

12711

14927

17.4

 

Total Chg. Trains run

9309

10236

10.0

27739

31150

12.3

 

Chg. Trains/Day

310

341

10.0

305

342

12.3

 

TOD (Org+Term+Through)

380

873

129.7

908

2996

230.0

2

Punctuality (in %) :

 

 

 

 

 

 

 

Mail Express Punctuality

79.66

78.90

-1.0

83.05

79.73

-4.0

 

Passenger Punctuality

71.38

58.02

-18.7

77.84

58.03

-25.4

 

Overall Punctuality

75.81

68.88

-9.1

80.66

69.33

-14.0

BLOCK GRANTED (in Hrs.)

 

ENGG.

1694

1718

1.4

5155

5659

9.8

 

S&T

647

702

8.5

2014

2028

0.7

 

TRD

356

499

40.2

1201

1474

22.7

 

TOTAL

2697

2919

8.2

8370

9161

9.5




Source : East Central Railways / Indian Railways Portal CMS Team Last Reviewed : 10-07-2024  


  Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.