Screen Reader Access Skip to Main Content Font Size   Increase Font size Normal Font Decrease Font size
Indian Railway main logo
Search :
View Content in Hindi
National Emblem of India

About Us

Hajipur H.Q.

Divisions

News Updates

Tenders

Contact Us

Supplier Information

Divisions
   Danapur
      Mechanical


 
Bookmark Mail this page Print this page
QUICK LINKS
Mechanical

MECHANICAL (C&W)


Major Work Station under

1.      Divisional Office at Danapur.

2.      Rajendra Nagar Coaching Complex.

3.       PNBE/H-Park Coaching Depot.

4.       Danapur Coaching Depot.

5        Rajgir Coaching Depot.

6        Train passing & enroute watering at PNBE.

7         ART & SPART at DNR

8         ART at JAJ.




GENERAL INFORMATION

Sl.No.

Name of Officer

Designation

01

Ravish Ranjan

Sr.DME(C&W)

02

Rajeev Kumar

Sr.CDO/RNCC

03

Randhir Kumar

DME/TS

04

Pankaj Kumar

DME/RNCC

05

Ritu Raj

DEnHM/DNR

06

Uday Kumar

AME(C&W)/DNR (looking after work of CDO/DNR too.

07

Jayant Raj Saurav

AME/RNCC



CHAPTER-2

ACTIVITIES

2.1     COACHING ACTIVITIES-

(i)       Primary Maintenance of trains

              02 No. Vande Bharat Exp started

1)( 22349/50) w.e.f. 28.06.2023 between PNBE - RNC.(PM - RNCC)

2)( 22347/48) w.e.f. 26.09.2023 between PNBE - HWH.(PM - RNCC)

There are four coaching depots located over Danapur Division, Harding Park/Patna Jn., Rajendra Nagar Coaching Complex, Danapur and Rajgir with a total coach holding of 1471 coaches. Primary maintenance of total 27 trains in 41 rakes ( Except Vande Bharat Exp ) is being given in these four depots. The details are listed below:

Depot

No. of Trains

No. of Rakes

No. of coach/day

LHB

ICF

RNCC

19

28

0

210

DNR

6

6

3

94

RGD

2

3

1

26

TOTAL

27

37

04

330

Holding


1471

Name of Depot

Coach Holding

Bare

Spare


Total

LHB

ICF

RNCC

862

738

124

595

59

DNR

422

132

290

182

17

RGD

187

81

106

79

8

Total

1471

951

520

856

84

Note: Excluding Secondary maintained trains

(ii)Secondary Maintenance of trains.

              Secondary maintenance of 06 long distance/Super fast trains is being done in coaching depot at PNBE & DNR. The details are as below

Depot

No. of Trains

No. of coach/day

PNBE

4

19

DNR

2

25

TOTAL

6

44

        (iii)Turn round attention.

             As per Railway Board’s Policy Circular No.4, item-3 total of 60 short distance Mail/Express and Passenger Trains are being given Turn Round attention. The details are as below:

Depot

No. of Trains

No. of coach/day

PNBE

25

301

RNCC

4

26

DNR

8

127

PPTA

6

78

MKA

1

12

JAJ

0

0

RGD

6

72

IPR

2

44

KEU

5

62

ARA

4

46

TOTAL

61

768

(iv)Enroute watering of trains.

After Rationalisation, Patna Jn. Is the only station where watering in all the 80 nominated through trains are being done.

Depot

No. of Trains

Average No. of coach/day

PNBE

80

650

TOTAL

80

650

(b)Rolling – in Examination.

After Rationalization, Patna Jn. Is the only En-route examination point, where all the through and terminating trains are given Rolling-in examination. At DNR, RJPB,PPTA, KEU MKA, JAJ, IPR, and RGD only terminating trains are given Rolling-in examination.

Patna Jn. is the en-route examination point in Danapur where all the through and terminating trains are given Rolling-in examination. At DNR, RJPB,PPTA, KEU MKA, JAJ, IPR, and RGD only terminating trains are given Rolling-in examination.

Depot

No. of Trains

PNBE

Enroute train passing/ Through passing trains (As per Rake link)

86

Terminating/Originating//Passing

38

RJPB

22

DNR

05

PPTA

25

MKA

1

ARA

4

RGD

6

IPR

2

KEU

7

TOTAL

196

Depot: RNCC: MEGA

DNR: Medium

RGD: Minor

Holding of DNR Div. as on 01.09.2023

Bare Requirement

Holding

Total AC/NAC

RNCC

DNR

RGD

TOTAL

RNCC

DNR

RGD

TOTAL

Total

TEJAS Rajdhani

LWFAC

4

0

0

4

5

0

0

5

LHB AC

500

LWACCW

10

0

0

10

12

0

0

12

LWACCN

22

0

0

22

27

0

0

27

LWCBAC

2

0

0

2

3

0

0

3

LWLRRM

4

0

0

4

5

0

0

5

TOTAL

42

0

0

42

52

0

0

52

Sampoorna Kranti + CSTM Suvidha + Archana + Ziyarat + Jansadharan + HUMSFR

LWFAC

20

2

3

25

32

4

4

40

LHB NAC

451

LWFCWAC

0

0

0

0

2

0

0

2

LWACCW

42

4

6

52

80

12

10

102

LWACCN

148

12

18

178

166

16

20

202

LWACCNE

18

2

0

20

12

2

0

14

LWACCNAA

0

0

0

0

8

0

0

8

LWCBAC

14

2

3

19

17

3

4

24

LWLRRM

28

4

3

35

35

5

4

44

LWSCN

136

12

18

166

180

15

21

216

LS

73

62

12

147

75

59

14

148

LSLRD

18

4

3

25

22

5

4

31

TOTAL

497

104

66

667

629

121

81

831

Jansatabdi& Intercity (LHB)

LWSCZAC

7

2

0

9

6

0

0

6

LWSCZ

43

6

0

49

47

9

0

56

LWLRRM

3

2

0

5

4

2

0

6

LSLRD

3

2

0

5

0

0

0

0

TOTAL

56

12

0

68

57

11

0

68

ICF AC

105

Jansatabdi

WGSCZACJ

0

0

0

0

2

0

0

2

WGSCZJ

0

0

0

0

3

0

0

3

WGSCZRJ

0

0

0

0

0

0

0

0

TOTAL

0

0

0

0

5

0

0

5

M/EXP

WGFAC

0

0

0

0

2

0

0

2

WGFACCW

0

0

0

0

3

0

4

7

WGACCW

0

0

0

0

2

16

7

25

WGCWNAC

0

0

0

0

18

0

0

18

WGACCN

0

0

0

0

6

26

14

46

ICF NAC

416

WGACCN/C

0

0

1

1

0

0

0

0

WGSCZAC

0

2

0

2

3

2

0

5

GS/GSCZ

0

58

0

58

50

116

22

188

GS/C

0

0

7

7

0

4

0

4

WGSCN

0

0

0

0

22

95

45

162

WGSCN/C

0

0

3

3

2

2

0

4

WGCB

0

0

0

0

3

0

4

7

SLR

0

6

0

6

9

29

10

48

SLR/C

0

0

2

2

0

0

0

0

TOTAL

0

66

13

79

120

290

106

516

Grand Total

595

182

79

856

863

422

187

1472

1472

2.3 FREIGHT ACTIVITIES

Flying gangs cum break down gangs have been stationed at JAJ, PNBE, MKA, ARA and DNR for attending to brake binding and minor defects at road side stations.

2.4 Staff:

Depot

Sanction

MOR

Shortfall w.r.t Sanction

On Roll

Supervisor

Staff

Ministerial staff

Group C

Group D

Group C

RNCC

530

497

33

66

335

86

10

DNR

301

312

-11

42

194

70

6

RGD

82

71

11

7

41

22

1

PNBE

217

186

31

22

105

55

4

MKA

35

24

11

2

9

13

0

KEU

31

28

3

3

17

8

0

JAJ

42

32

10

3

20

8

1

BXR

21

4

17

0

3

1

0

IPR

14

10

4

1

5

4

0

PPTA

38

44

-6

5

25

13

1

ARA

29

20

9

1

13

6

0

Div. office

27

30

-3

9

2

5

14

EnHM

45

33

12

24 ( SSE/JE-06, CHI/HI – 18)

0

1

8

Total

1412

1291

121

185(SSE/JE-167, CHI/HI – 18)

769

292

45

PERFORMANCE WITH RESPECT TO TARGETS

Parameter

Target 23 - 24

21-22

22-23   


23-24 ( Aug’23)   


Remarks

Coach

Ineffective % AC Coaches (including Workshop)

6

4.5

3.3

2.2


Ineffective % NAC Coaches (including Workshop)

5

2.7

3.0

1.9


IOH/Month

50

53

33

37


Punctuality loss Direct cases per year

38

110

286

196

-

Punctuality loss Total cases per year

-

126

414

330

-

Enroute detachment per year (Territorial basis)

Nil

1

1

4

ER LWACCN 052105  & NF LWACCN 131643 ( Less Cooling), ER WGACCN 22109 ( Both Side Inverter defective), NF LWFAC 125001 ( Less Cooling)

Enroute detachment per year (Ownership basis)

Nil

02

1

3

EC WGACCN 101406 ( Coach Vibration), EC LWCBAC 183339 ( Air Bellow Burst), EC LWLRRM 151590 ( DG Set))

Secondary detachment (Territorial basis) Other railway coaches in our division.

20

69

110

35

Primary Outer Spg- 20, Wheel Shelled – 01 , FIBA- 01, Branch Pipe AR- 01, OMRS - 02, Roof leakage - 01, V- Belt-01, AC System – 03, Blower- 04, Transformer- 01,

Secondary detachment (Ownership basis)

16

20

19

13

Prim Spg- 07 & Sec . Outer Spg – 01, Wheel - 01, Hot axle- 02, Unusual sound- 01, OMRS-01

Condemnation of coaches

68

4

57

05

Ferrous scrap to stores

50MT

147.79 MT

132.26 MT

25.21 MT

Freight

Enroute Detachment (Excluding Hot Axle )

1

02

12

02


Poor Brake Power

NIL

00

00

00


Train Parting

2

01

01

00


Spring Breakage

0

00

01

00


Hot Axle

1

10

08

01

Other Rly Wagons

Wagon ineffective %

0

00

00

00

No Holding

Condemnation of Coaches & wagon under process:

Summary

Sl No