MECHANICAL (C&W)
Major Work Station under
1. Divisional Office at Danapur.
2. Rajendra Nagar Coaching Complex.
3. PNBE/H-Park Coaching Depot.
4. Danapur Coaching Depot.
5 Rajgir Coaching Depot.
6 Train passing & enroute watering at PNBE.
7 ART & SPART at DNR
8 ART at JAJ.
GENERAL INFORMATION.
Sl.No. | Name of Officer | Designation |
01 | Ravish Ranjan
| Sr.DME(C&W) |
02 | Rajeev Kumar | Sr.CDO/RNCC |
03 | Pankaj Kumar | DME/TS |
04 | Ritu Raj | DME/RNCC |
05 | S. P Srivastava | DEnHM/DNR |
06 | Rajiv Ranjan
| AME(C&W)/DNR |
07 | Uday Kumar | CDO/DNR |
08 | Jayant Raj Saurav
| AME/RNCC |
CHAPTER-2
ACTIVITIES
2.1 COACHING ACTIVITIES-
(i) Primary Maintenance of trains
There are four coaching depots located over Danapur Division, Harding Park/Patna Jn., Rajendra Nagar Coaching Complex, Danapur and Rajgir with a total coach holding of 1530 coaches. Primary maintenance of total 26 trains in 40 rakes is being given in these four depots. The details are listed below:
Depot | No. of Trains | No. of Rakes | No. of coach/day |
LHB | ICF |
RNCC | 19 | 28
| 0 | 200
|
DNR | 6
| 6 | 3 | 67
|
RGD | 1
| 3 | 0 | 22 |
TOTAL | 26 | 37 | 03 | 289 |
Holding |
| 1530 |
Name of Depot | Coach Holding | Bare | Spare |
| Total | LHB | ICF |
RNCC | 1090 | 731 | 359 | 583 | 59 |
DNR | 253 | 132 | 121 | 178 | 17 |
RGD | 187 | 81 | 106 | 66 | 7 |
Total | 1530 | 944
| 586 | 827 | 83 |
Note: Excluding Secondary maintained trains |
(ii)Secondary Maintenance of trains.
Secondary maintenance of 06 long distance/Super fast trains is being done in coaching depot at PNBE & DNR. The details are as below
Depot | No. of Trains | No. of coach/day |
PNBE | 4 | 19 |
DNR | 2 | 25 |
TOTAL | 6 | 44 |
(iii)Turn round attention.
As per Railway Board’s Policy Circular No.4, item-3 total of 60 short distance Mail/Express and Passenger Trains are being given Turn Round attention. The details are as below:
Depot | No. of Trains | No. of coach/day |
PNBE | 25 | 299 |
RNCC | 4 | 25 |
DNR | 8 | 125 |
PPTA | 6 | 78 |
MKA | 1 | 12 |
JAJ | 0 | 0 |
RGD | 6 | 72 |
IPR | 2 | 44 |
KEU | 5 | 62 |
ARA | 3 | 24 |
TOTAL | 60 | 741 |
(iv)Enroute watering of trains.
After Rationalisation, Patna Jn. Is the only station where watering in all the 80 nominated through trains are being done.
Depot | No. of Trains | Average No. of coach/day |
PNBE | 80 | 650 |
TOTAL | 80 | 650 |
(b)Rolling – in Examination.
After Rationalization, Patna Jn. Is the only En-route examination point, where all the through and terminating trains are given Rolling-in examination. At DNR, RJPB,PPTA, KEU MKA, JAJ, IPR, and RGD only terminating trains are given Rolling-in examination.
Patna Jn. is the en-route examination point in Danapur where all the through and terminating trains are given Rolling-in examination. At DNR, RJPB,PPTA, KEU MKA, JAJ, IPR, and RGD only terminating trains are given Rolling-in examination.
Depot | No. of Trains | Av. No. of coach/day |
PNBE | Enroute train passing/ Through passing trains (As per Rake link) | 86 | 730 |
Terminating/Originating//Passing | 38 | 345 |
RJPB | 22 | 222 |
DNR | 05 | 195 |
PPTA | 25 | 259 |
MKA | 1 | 12 |
JAJ | 1 | 3 |
RGD | 6 | 149 |
IPR | 2 | 48 |
KEU | 7 | 75 |
TOTAL |
| 193 | 2038 |
Depot: RNCC: MEGA
DNR: Medium
RGD: Minor
DNR Holding as on 01.01.2023 |
BARE REQUIREMENT | Holding | Total AC/NAC |
|
| RNCC | DNR | RGD | TOTAL | RNCC | DNR | RGD | TOTAL | Total |
TEJAS Rajdhani | LWFAC | 4 | 0 | 0 | 4 | 5 | 0 | 0 | 5 | LHB AC | 493 |
LWACCW | 10 | 0 | 0 | 10 | 12 | 0 | 0 | 12 |
LWACCN | 22 | 0 | 0 | 22 | 27 | 0 | 0 | 27 |
LWCBAC | 2 | 0 | 0 | 2 | 3 | 0 | 0 | 3 |
LWLRRM | 4 | 0 | 0 | 4 | 5 | 0 | 0 | 5 |
| TOTAL | 42 | 0 | 0 | 42 | 52 | 0 | 0 | 52 |
Sampoorna Kranti + CSTM Suvidha + Archana + Ziyarat +Jansadharan + HUMSFR + kurla + Mathura + Capital | LWFAC | 20 | 2 | 3 | 25 | 31 | 4 | 4 | 39 | LHB NAC | 451 |
LWFCWAC | 0 | 0 | 0 | 0 | 2 | 0 | 0 | 2 |
LWACCW | 42 | 4 | 6 | 52 | 80 | 12 | 10 | 102 |
LWACCN | 144 | 12 | 18 | 174 | 165 | 16 | 20 | 201 |
LWACCNE | 18 | 2 | 0 | 20 | 7 | 2 | 0 | 9 |
LWACCNAA | 0 | 0 | 0 | 0 | 8 | 0 | 0 | 8 |
LWCBAC | 13 | 2 | 3 | 18 | 17 | 3 | 4 | 24 |
LWLRRM | 28
| 4 | 3 | 35 | 35 | 5 | 4 | 44 |
LWSCN | 136 | 12 | 18 | 166 | 180 | 15 | 21 | 216 |
LS | 68
| 58 | 12 | 138 | 75 | 59 | 14 | 148 |
LSLRD | 18
| 4 | 3 | 25 | 22 | 5 | 4 | 31 |
| TOTAL | 487
| 100 | 66 | 653
| 621 | 121 | 81 | 824 |
Jansatabdi& Intercity (LHB) | LWSCZAC | 7 | 2 | 0 | 9 | 6 | 0 | 0 | 6 |
LWSCZ | 41 | 6 | 0 | 47 | 47 | 9 | 0 | 56 |
LWLRRM | 3 | 2 | 0 | 5 | 4 | 2 | 0 | 6 |
LSLRD | 3 | 2 | 0 | 5 | 0 | 0 | 0 | 0 |
| TOTAL | 54 | 12 | 0 | 66 | 57 | 11 | 0 | 68 | ICF AC | 113 |
Jansatabdi | WGSCZACJ | 0 | 0 | 0 | 0 | 2 | 0 | 0 | 2 |
WGSCZJ | 0 | 0 | 0 | 0 | 4 | 0 | 0 | 4 |
WGSCZRJ | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| TOTAL | 0 | 0 | 0 | 0 | 6 | 0 | 0 | 6 |
M/EXP | WGFAC | 0 | 0 | 0 | 0 | 3 | 0 | 0 | 3 |
WGFACCW | 0 | 0 | 0 | 0 | 3 | 0 | 4 | 7 |
WGACCW | 0 | 0 | 0 | 0 | 10 | 8 | 7 | 25 |
WGCWNAC | 0 | 0 | 0 | 0 | 18 | 0 | 0 | 18 |
WGACCN | 0 | 0 | 0 | 0 | 38 | 1 | 14 | 53 | ICF NAC | 473 |
WGSCZAC | 0 | 2 | 0 | 2 | 3 | 2 | 0 | 5 |
GS/GSCZ | 0 | 58 | 0 | 58 | 109 | 80 | 22 | 211 |
GS/GSCZ/C | 0 | 0 | 0 | 0 | 0 | 5 | 0 | 5 |
WGSCN | 0 | 0 | 0 | 0 | 124 | 10 | 45 | 179 |
WGSCN/C | 0 | 0 | 0 | 0 | 5 | 2 | 0 | 7 |
WGCB | 0 | 0 | 0 | 0 | 8 | 0 | 4 | 12 |
SLR | 0 | 6 | 0 | 6 | 32 | 13 | 10 | 55 |
| TOTAL | 0 | 66 | 0 | 66 | 353 | 121 | 106 | 580 |
| Grand Total | 583
| 178 | 66 | 827 | 1089 | 253 | 187 | 1530 |
| 1530 |
Infrastructure:
RNCC
| Pit-1 | Length- 514.5 m with catwalk.Present Capacity- ICF - 23 coach, LHB- 21 coach |
Pit-2 | Length- 550 m with catwalk.Capacity - ICF - 24 coach, LHB- 23 coach |
Pit-3 | Length- 550 m with catwalk.Capacity - ICF -24 coach, LHB- 23 coach |
Pit-4 | Length- 535 m with catwalk.Capacity - ICF - 24 coach, LHB- 22 coach |
Pit-5 (LHB PIT covered shed) | Length- 490 m with catwalk.Capacity - ICF - 21 coach-, LHB- 20 coach |
Sick line | 2 lines under covered shed of 4 coach berthing in each line |
DNR | Pit-1 | 24 coach length catwalk (Only South Side). |
Pit-2 | 24 coach length without catwalk (Only North Side). |
Pit-3 | 24 coach length with catwalk. |
Stabling | One of 24 coach length without any maintenance facilities. |
Sick line | One line under covered shed for 3 coach berthing (Wheel changing facility in process). |
PNBE | Pit-1 | 24 coach length (Partial catwalk on only North side) . |
Pit-2 | 15 Coach lengths without cat walk. |
Sick Line | Nil |
MKA | Pit | Nil |
Stabling | One of 18 coach length without maintenance facilities. |
JAJ | Pit | One Pit of 18 coach length with catwalk. (One round trip train 15941/42) |
RGD | Pit | One Pit of 24 coach length with catwalk. |
Sick line | Nil |
2.3 FREIGHT ACTIVITIES –
Flying gangs cum break down gangs have been stationed at JAJ, PNBE, MKA, BXR and DNR for attending to brake binding and minor defects at road side stations.
2.4 Staff:
Depot | Sanction | MOR | Shortfall w.r.t Sanction | On Roll |
Supervisor | Staff | Ministerial staff |
Group C | Group D | Group C |
RNCC | 549 | 494 | 55 | 65 | 332 | 86 | 11 |
DNR | 286 | 291 | -5 | 42 | 185 | 56 | 8 |
RGD | 82 | 76 | 6 | 7 | 46 | 22 | 1 |
PNBE | 225 | 195 | 30 | 25 | 109 | 56 | 5 |
MKA | 32 | 32 | 0 | 2 | 14 | 15 | 1 |
KEU | 31 | 28 | 3 | 4 | 17 | 7 | 0 |
JAJ | 43 | 36 | 7 | 4 | 21 | 10 | 1 |
BXR | 19 | 19 | 0 | 1 | 14 | 4 | 0 |
IPR | 14 | 11 | 3 | 1 | 6 | 4 | 0 |
PPTA | 71 | 69 | 2 | 6 | 37 | 25 | 1 |
ARA | 29 | 0 | 29 | 0 | 0 | 0 | 0 |
Div. office | 25 | 30 | -5 | 9 | 1 | 6 | 14 |
EnHM | 44 | 34 | 10 | 26 ( SSE/JE-08, CHI/HI – 18) | 0 | 1 | 7 |
Total | 1450 | 1315 | 135 | 192 (SSE/JE-174, CHI/HI – 18) | 782 | 292 | 49 |
PERFORMANCE WITH RESPECT TO TARGETS
Parameter | Target 22 - 23 | 20-21 | 21-22 | 22-23 ( Dec'22) | Remarks |
Coach |
Ineffective % AC Coaches (including Workshop) | 6 | 4.2 | 4.5 | 3.7 |
|
Ineffective % AC Coaches (including Workshop) | 5 | 3.3 | 2.7 | 3.0 |
|
IOH/Month | 50 | 59 | 53 | 31 |
|
Punctuality loss Direct cases per year | 38 | 8 | 110 | 218 | - |
Punctuality loss Total cases per year | - | 10 | 126 | 318 | - |
Enroute detachment per year (Territorial basis) | Nil | 2 | 1 | 1 | EC LWS 184269 ( Lower Control Arm fresh Broken) |
Enroute detachment per year (Ownership basis) | Nil | 0 | 02 | 1 | EC LWSCN 184474 ( Hot Axle) |
Secondary detachment (Territorial basis) Other railway coaches in our division. | 20 | 21 | 69 | 72 | Primary Outer Spg- 46, bolster spg-01, Air Bellow: 01, Sharp Flange-01, Traction centre - 01, ABC-01, Wheel Shelled - 01, Bio- Vaccum- 01, Water Tank- 01, Car Body Bolt-01, Transformer -01, less cooling-04, V- Belt-01, Blower- 02, Water dropping on electrical panel-02 |
Secondary detachment (Ownership basis) | 22 | 18 | 20 | 15 | Prim Spg- 07, BP Joint leakage-02, Buffer - 01, Compressor leakage-02, Alternator-01, Traction centre-01 & Bush Broken-01 |
Condemnation of coaches | 68 | 100 | 4 | 52 |
|
Ferrous scrap to stores | 50MT | 2316.1MT | 147.79 MT | 76.27 MT |
|
Freight |
Enroute Detachment (Excluding Hot Axle ) | 1 | 1 | 02 | 10 |
|
Poor Brake Power | NIL | 0 | 00 | 00 |
|
Train Parting | 2 | 4 | 01 | 01 |
|
Spring Breakage | 0 | 1 | 00 | 01 |
|
Hot Axle | 1 | 5 | 10 | 07 | Other Rly Wagons |
Wagon ineffective % | 0 | 0 | 00 | 00 | No Holding |
Condemnation of Coaches & wagon under process: Summary |
Sl No | Status | No. | Location |
Coach | Wagon |
1 | Disposed till Date | 18 | - |
|
2 | Offered to Stores For auction | 18
| 12 | JAJ- 18 , EKR- 12 |
3 | Sold awaiting handing over | - | - |
|
4 | Handed over awaiting removed | - | - |
|
5 | Condemnation approval at H/Q | - | - |
|
6 | Awaiting CR/Survey | 03 | 03 | JAJ - 02, DNR -01
BXR- 02, SDE-01, |