Screen Reader Access Skip to Main Content Font Size   Increase Font size Normal Font Decrease Font size
Indian Railway main logo
Search :
View Content in Hindi
National Emblem of India

About Us

Hajipur H.Q.

Divisions

News Updates

Tenders

Contact Us

Supplier Information

Divisions
   Danapur
      Mechanical


 
Bookmark Mail this page Print this page
QUICK LINKS
Mechanical

MECHANICAL (C&W)


Major Work Station under

1.      Divisional Office at Danapur.

2.      Rajendra Nagar Coaching Complex.

3.       PNBE/H-Park Coaching Depot.

4.       Danapur Coaching Depot.

5        Rajgir Coaching Depot.

6        Train passing & enroute watering at PNBE.

7         ART & SPART at DNR

8         ART at JAJ.

GENERAL INFORMATION.

Sl.No.

Name of Officer

Designation

01

Mukesh Kumar

Sr.DME(C&W)

02

Ashok Kumar

Sr.CDO/RNCC

03

Pankaj Kumar

DME/TS

04

Ritu Raj

DME/RNCC

05

S. P Srivastava

DEnHM/DNR

06

Damodar Prasad

AME(C&W)/DNR

07

Uday Kumar

CDO/DNR

08

Alok Kumar Arya

AME/RNCC


 

CHAPTER-2

ACTIVITIES

2.1     COACHING ACTIVITIES-

(i)       Primary Maintenance of trains

There are four coaching depots located over Danapur Division, Harding Park/Patna Jn., Rajendra Nagar Coaching Complex, Danapur and Rajgir with a total coach holding of 1394 coaches. Primary maintenance of total 25 trains in 42 rakes is being given in these four depots. The details are listed below:

Depot

No. of Trains

No. of Rakes

No. of coach/day

LHB

ICF

RNCC

18

27

2

205

DNR

6

5

5

70

RGD

1

0

3

24

TOTAL

25

32

10

296

Holding

1394

Name of Depot

Coach Holding

Bare

Spare


Total

LHB

ICF

RNCC

1023

644

379

594

62

DNR

269

148

121

198

17

RGD

102

-

102

72

7

Total

1394

792

602

864

86

Note: Excluding Secondary maintained trains

(ii)Secondary Maintenance of trains.

              Secondary maintenance of 07 long distance/Super fast trains is being done in coaching depot at PNBE & DNR. The details are as below

Depot

No. of Trains

No. of coach/day

PNBE

4

19

DNR

3

49

TOTAL

7

68

        (iii)Turn round attention.

             As per Railway Board’s Policy Circular No.4, item-3 total of 53 short distance Mail/Express and Passenger Trains are being given Turn Round attention. The details are as below:

Depot

No. of Trains

No. of coach/day

PNBE

25

318

RNCC

3

16

DNR

5

86

PPTA

5

56

MKA

1

09

JAJ

0

0

RGD

4

55

IPR

2

44

KEU

5

60

ARA

3

16




TOTAL

53

660

     (iv)Enroute watering of trains.

After Rationalisation, Patna Jn. Is the only station where watering in all the 80 nominated through trains are being done.

Depot

No. of Trains

Average No. of coach/day

PNBE

80

650

TOTAL

80

650

(b)Rolling – in Examination.

After Rationalization, Patna Jn. Is the only En-route examination point, where all the through and terminating trains are given Rolling-in examination. At DNR, RJPB,PPTA, KEU MKA, JAJ, IPR, and RGD only terminating trains are given Rolling-in examination.

Patna Jn. is the en-route examination point in Danapur where all the through and terminating trains are given Rolling-in examination. At DNR, RJPB,PPTA, KEU MKA, JAJ, IPR, and RGD only terminating trains are given Rolling-in examination.

Depot

No. of Trains

Av. No. of coach/day

PNBE

Enroute train passing/ Through passing trains (As per Rake link)

86

730

Terminating/Originating//Passing

38

345

RJPB

21

200

DNR

05

195

PPTA

25

259

MKA

1

11

JAJ

1

3

RGD

6

149

IPR

2

48

KEU

7

75

TOTAL


192

2015

Depot: RNCC: MEGA

DNR: Medium

PNBE: Minor

RGD: Medium

Holding of DNR Div. as on 01.01.2022

Holding

Total AC/NAC

RNCC

DNR

RGD

TOTAL

Total

TEJAS Rajdhani

LWFAC

5

0

0

5

LHB AC

400

LWACCW

12

0

0

12

LWACCN

27

0

0

27

LWCBAC

3

0

0

3

LWLRRM

5

0

0

5

TOTAL

52

0

0

52

Sampoorna Kranti + CSTM Suvidha + Archana + Ziyarat + Jansadharan + HUMSFR

LWFAC

19

4

0

23

LHB NAC

392

LWFCWAC

2

0

0

2

LWACCW

62

12

0

74

LWACCN

146

20

0

166

LWCBAC

17

3

0

20

LWLRRM

39

12

0

51

LWSCN

185

15

0

200

LS

65

80

0

145

LSLRD

4

2

0

6

TOTAL

539

148

0

687

Jansatabdi (LHB)

LWSCZAC

6

0

0

6

LWLRRM

6

0

0

6

LWSCZ

41

0

0

41

TOTAL

53

0

0

53

ICF AC

117

Jansatabdi

WGSCZACJ

3

0

0

3

WGSCZJ

4

0

0

4

WGSCZRJ

0

0

0

0

TOTAL

7

0

0

7

M/EXP

WGFAC

3

0

0

3

WGFACCW

3

0

4

7

WGACCW

14

8

5

27

WGCWNAC

18

0

0

18

WGACCN

41

1

12

54

ICF NAC

485

WGSCZAC

3

2

0

5

GS/GSCZ

109

80

22

211

GS/C

0

5

0

5

WGSCN

134

10

45

189

WGSCN/C

5

2

0

7

WGCB

8

0

4

12

SLR

34

13

10

57

TOTAL

372

121

102

595

Grand Total

1023

269

102

1394

1394

2.2INFRASTUCTURE AVAILABILE.

 RNCC

Pit-1

Length- 514.5 m with catwalk.Present Capacity- ICF - 23 coach, LHB- 21 coach

Pit-2

Length- 550 m with catwalk.Capacity - ICF - 24 coach, LHB- 23 coach

Pit-3

Length- 550 m with catwalk.Capacity - ICF -24 coach, LHB- 23 coach

Pit-4

Length- 535 m with catwalk.Capacity - ICF - 24 coach, LHB- 22 coach

Pit-5 (LHB PIT covered shed)

Length- 490 m with catwalk.Capacity - ICF - 21 coach-, LHB- 20 coach

Sick line

2 lines under covered shed of 4 coach berthing in each line

DNR

Pit-1

24 coach length catwalk (Only South Side).

Pit-2

24 coach length without catwalk (Only North Side).

Pit-3

24 coach length with catwalk.

Stabling

One of 24 coach length without any maintenance facilities.

Sick line

One line under covered shed for 3 coach berthing (Wheel changing facility in process).

PNBE

Pit-1

24 coach length (Partial catwalk on only North side) .

Pit-2

15 Coach lengths without cat walk.

Sick Line

Nil

MKA

Pit

Nil

Stabling

One of 18 coach length without maintenance facilities.

JAJ

Pit

One Pit of 18 coach length with catwalk. (One round trip train 15941/42)

RGD

Pit

One Pit of 24 coach length with catwalk.

Sick line

Nil

2.3 FREIGHT ACTIVITIES

Flying gangs cum break down gangs have been stationed at JAJ, PNBE, MKA, BXR and DNR for attending to brake binding and minor defects at road side stations.

2.4 Staff:

Depot

Sanction

MOR

Shortfall w.r.t Sanction

On Roll

Supervisor

Staff

Ministerial staff

Group C

Group D

Group C

RNCC

546

483

63

56

315

101

11

DNR

292

290

2

42

170

70

8

RGD

82

81

1

8

48

23

2

PNBE

223

203

20

26

107

65

5

MKA

32

35

-3

2

15

17

1

KEU

32

27

5

4

16

7

0

JAJ

45

38

7

5

18

14

1

BXR

18

22

-4

2

14

6

0

IPR

14

11

3

1

5

5

0

PPTA

70

66

4

5

36

25

0

ARA

30

6

24

0

6

0

0

Div. office

22

28

-6

7

1

6

14

EnHM

44

47

-3

39 ( SSE/JE-20, CHI/HI – 19)

0

1

7

Total

1450

1337

113

197 SSE/JE-178, CHI/HI – 19)

751

340

49

Contract position of DANAPUR division

S.N

Name of work

Allocation

Value (in Rs.)

Contractor’s Name

Contract validity

Remark

Start of work

Date of completion

1.

Mech. Clg. of coaches of trains of DNR depot

08-590-32

24,34,68,312

Rakshak Securitas Pvt. Ltd.

17.06.19

16.06.23

Running

2.

Mechanized clg. of trains of RNCC

44,34,07,190

Urmila International Pvt. Ltd.

21.09.19

20.09.23

Running

3.

Mechanized clg. of Rgd depot

5,27,00,000

Aftab Infotech Pvt. Ltd.

01.06.19

31.05.23

Running

4.

Comprehensive contract of OBHS +ACCA of trains of DNR division

44,99,52,197

Urmila International Pvt. Ltd.

17.04.19

16.04.23

Running

5.

AMOC of DRDE type of Bio-toilet

12,83,94,525

Hughes & Hughes Chem. Ltd.

17.03.19

16.02.22

Running

6.

Pest and Rodent control of coaches of trains and yards of DNR Division

4,26,79,334

Hughes & Hughes Chem. Ltd.

24.03.19

23.03.23

Running

7.

Mech. Cleaning of coaches of PNBE

11,56,79,350/

BIPS Associate,Lucknow

18.01.22

17.01.26

Running

8.

Dry cleaning of coaches of turn round trains of DNR division

2,36,00,000

Navyouvak Sangh Swablambi Sahkari samitee

02.05.18

28.02.22

Running

9

Periodic schedule maintenance of axle mounted disc brake system installed in LHB coaches (FTRTIL make)

06-211-32

13,05,42,956.87

Faiveley Transport Rail Technologies India Limited, Tamilnadu, India

16.01.19

15.04.22

Running

10

Periodic Schedule Maintenance of AMDBS installed in LHB coaches (knorr-Bremse)

10,73,35,582

Knorr-Bremse India (P) Ltd., Haryana (India)

01.09.18

28.02.22

Running

11

Road transportation of BG ICF trolleycomplete including loading & unloading at RNCC Depots of Danapur div.

3,91,51,814.70

Gudia construction, Begusrai

01.12.20

30.11.22

Running

12

Hiring of 09 Ton capacity , heavy and robust underframe truck for Mechanical (C&W) deptt. of Danapur division on regular basis for 02 years

22,79,976.00

Pankaj Rai,Buxar

11.03.21

10.03.23

Running

13

CAMC of HYT pit wheel lathe machine at RNCC

1,31,83,577.00

HYT Engg Ltd,PUNE

03.01.20

08.11.22

Running

14

Watering in trains at Patna Jn.

5,88,87,609.44

Prabhakar Enterprises,Bahruch,Gujrat

01.02.20

31.01.23

Running

15

Retrofitment of Toilet Window in ICF+LHB Coaches

2,61,62,400.00

Hindustan fibre-Vadodra

18.03.20

30.06.22

Running

16

Road Transportation of component like bogie, wheel set etc. by trailer truck from /to Danapur coaching depot to/from Liluah, Gorakhpur, Harnaut, RCF/Kapurthala, RCF/Raibareliand other workshop/depots/Production units for 01 years.

1,59,76,952.40

Ameet kumar,gaya

03.12.20

02.05.22

Running

17

AMC of EOT Crane capacity 3Tonat RNCC depot.

07-330-32

10,99,848.5

Plicare Crane-Kolkata

01.06.21

31.05.24

Running

18

AMC of EOT Crane capacity 5Tonat DNR depot.

13,85,084

Plicare Crane-Kolkata

01.12.21

30.11.24

Running

19

Vehicle Hiring for ADRM & CMS

03-130-32

40,03,200

Ameet Kumar

01.11.20

31.10.22

Running

20

Vehicle hiring for officer of Mechanical department

71,13,600

Pankaj Rai-Buxar

01.12.21

30.11.23

Running

Contract Status of TL &AC

Sl.No.

Name of Work

Location

Contractor's Name

Value

-Start of Work

Date of Completion

1

CAMC for Cummins make Doiesel Engine Modelk KTA19G5/KTA19G10 for power car in Danapur Division for three years

RNCC & DNR

M/s Cummins India Ltd

162584573.8

16.01.2020

16.01.2023

2

AMCfor 25 KVA invertor manufactured by M/s Autometers Alliance Ltd. Fitted in SGAC coaches of DNR divn. for3 YRS.

RNCC, DNR & RGD

M/s Autometers Alliance

4386060

26.11.2021

25.11.2024

3

Comprehensive Annual Maintenance Contract of various
RMPU Installed in LHB Coaches for the period of three years over
Danapur Division.

RNCC, DNR & RGD

M/s AIR PERFECTION-JABALPUR

101226345

18.10.2021

17.10.2024

4

AMCfor 25 KVA invertor of MEDHA Servo Drivesmake fitted in SGAC coaches of DNR divn. For three years.

RNCC, DNR & RGD

M/s Medha Servo Pvt Ltd

3185759.81

21.08.2019

20.08.2022

5

Escorting of Greaves make Power Car (with one skilled staff in one power car)

RNCC, & DNR

M/s Deev Genset sales and Services

19195690.32

08.2.2021

07.02.2023

6

AMCfor 25 KVAinvertors manufactured by M/s Siemens Ltd. fitted in SGAC coaches of DNR divn.of3 yrs.

RNCC, DNR & RGD

M/s Siemens India Ltd

14988726

30.09.2021

30.09.2024

7

AMCfor 25 KVA invertor manufactured by M/s Hitachi Hi-Rel Power Electronics Pvt. Ltd. Make fitted inSGAC coaches of DNR divn. For 3 years.

RNCC, DNR & RGD

M/s Hitachi-Hi Rel

6793193.88

30.11.2018

29.11.2021

(extendedupto30.03.2022)

8

AMCfor 25 KVA inverters of M/s Hind Rectifiers Ltd. Make fitted in SGAC coaches of DNR,divn. Of E.C. Railway.

RNCC, DNR & RGD

M/s Hind Rectifiers

8377056

18.05.2021

17.05.2024

9

AMCfor 25 KVA inverter of Waves make fitted in SGAC coaches of DNR divn. For three years.

RNCC, DNR & RGD

M/s Waves

2287310.4

20.8.2019

20.08.2022

10

Comprehensive AMC of Grieves cotton make generator car for scheduled maintenance including A,B& C check of Diesel Engine, their operation to stand Power supplyduring maintenance of Rajdhani, SampurnaKranti, Suvidha, Archana, Jiyarat, Tinsukia, Vaishali Exp. Under DNR, DHN, SEE & MGS division and escorting of Power Cars of DNR, DHN & MGS division for Three years.

DNR DIVISION, DHN , SEE & MGS DIVISION

M/sDeev Genset Sales & Services

58191563.2

27.05.2019

27.05.2022

11

AMC for RMPUAC coaches Excluding LHB AC coaches of DNR & DHN division for the period of three yrs.

DNR & DHN Division

M/s SidwalReferigeration

58676106

23.10.17

23.01.2022

(extendedupto 22.05.2022)

12

Escorting of any make power car/lslrd attached to primary maintained trains of Danapur Division for three years & A check of Power Car.

DNR Div

M/s Deev Genset Sales & Services

141197749.30

19.01.2022

18.01.2025

PERFORMANCE WITH RESPECT TO TARGETS

Parameter

Target 21 - 22

19-20

20-21

21-22

( Dec’ 21)

Remarks

Coach

Ineffective % AC Coaches (including Workshop)

6

5.7

4.2

4.6


Ineffective % Non-AC Coaches (including Workshop)

5

4.5

3.3

3.0


IOH/Month

50

45

59

61


Punctuality loss Direct cases per year

54

77

8

61

-

Punctuality loss Total cases per year

120

141

10

109

-

Enroute detachment per year (Territorial basis)

1

1

2

1

SER GSLRD 098444 (HE SS Lower plank with assembly deficient)

Enroute detachment per year (Ownership basis)

1

1

0

02



EC GSLRD 13712 ,  Brake Binding (Release time - 25 Sec), EC LWLRRM 193319, DV releasing time -23 sec.

Secondary detachment (Territorial basis) Other railway coaches in our division.

20

39

21

36

ABC – 01, Less cooling – 01, Wheel shelling – 01, Control Arm- 03, Primary Spg - 16, Luggage door-01, Branch pipe- 01, Air Spg-02, Bolster Spg- 02, Anti Roll bar – 02, Elec (Misc.)-06

Secondary detachment (Ownership basis)

10

27

18

22

Motor Blower- 01, Anti Roll Bar - 01, Prim Spg-07, Roof leakage-01, OHT-01, Wheel Shelling 02, cooling -01, damper bracket-02, ferrule-01,, Buffer- 01, DG Set- 01 & OMRS – 02, Misc - 01

Condemnation of coaches

68

28

100

4


Ferrous scrap to stores

50MT

236.79 MT

2316.1MT

128.8 MT


Freight

Enroute Detachment (Excluding Hot Axle )

1

0

1

01


Poor Brake Power

NIL

0

0

00