Screen Reader Access Skip to Main Content Font Size   Increase Font size Normal Font Decrease Font size
Indian Railway main logo
Search :
View Content in Hindi
National Emblem of India

About Us

Hajipur H.Q.

Divisions

News Updates

Tenders

Contact Us

Supplier Information

Divisions
   Danapur
      Mechanical


 
Bookmark Mail this page Print this page
QUICK LINKS
Mechanical

MECHANICAL (C&W)


Major Work Station under


1.      Divisional Office at Danapur.

2.      Rajendra Nagar Coaching Complex.

3.       PNBE/H-Park Coaching Depot.

4.       Danapur Coaching Depot.

5        Rajgir Coaching Depot.

6        Train passing & enroute watering at PNBE.

7         ART & SPART at DNR

8         ART at JAJ.

GENERAL INFORMATION.

 


Sl.No.

Name of Officer

Designation

01

Mukesh Kumar

Sr.DME(C&W)

02

Ashok Kumar

Sr.CDO/RNCC

03

Pankaj Kumar

DME/TS

04

Ritu Raj

DME/RNCC

05

S. P Srivastava

DEnHM/DNR

06

Damodar Prasad

AME(C&W)/DNR

07

Uday Kumar

CDO/DNR

08

Alok Kumar Arya

AME/RNCC


 

CHAPTER-2

ACTIVITIES

2.1     COACHING ACTIVITIES-

(i)       Primary Maintenance of trains

There are four coaching depots located over Danapur Division, Harding Park/Patna Jn., Rajendra Nagar Coaching Complex, Danapur and Rajgir with a total coach holding of 1362 coaches. Primary maintenance of total 25 trains in 42 rakes is being given in these four depots. The details are listed below:

Depot

No. of Trains

No. of Rakes

No. of coach/day

LHB

ICF

RNCC

19

23

8

207

DNR

5

5

3

63

RGD

1

0

3

24

TOTAL

25

28

14

294

Holding

 

1362

Name of Depot

Coach Holding

Bare

Spare


Total

LHB

ICF

RNCC

1002

600

402

624

62

DNR

258

140

118

174

17

RGD

102

-

102

72

7

Total

1362

740

622

870

86

Note: Excluding Secondary maintained trains

(ii)Secondary Maintenance of trains.

              Secondary maintenance of 08 long distance/Super fast trains is being done in coaching depot at PNBE & DNR. The details are as below

Depot

No. of Trains

No. of coach/day

PNBE

4

19

DNR

3

68

TOTAL

7

87

        (iii)Turn round attention.

             As per Railway Board’s Policy Circular No.4, item-3 total of 68 short distance Mail/Express and Passenger Trains are being given Turn Round attention. The details are as below:

Depot

No. of Trains

No. of coach/day

PNBE

24

311

RNCC

5

40

DNR

5

75

PPTA

7

90

MKA

1

09

JAJ

1

2.7

RGD

6

91

IPR

2

48

KEU

7

68

ARA

5

34

DLN

5

25

TOTAL

68

861.7

     (iv)Enroute watering of trains.

After Rationalisation, Patna Jn. Is the only station where watering in all the 96 nominated through trains are being done.

Depot

No. of Trains

Average No. of coach/day

PNBE

96

742

TOTAL

96

742

(b)Rolling – in Examination.

After Rationalization, Patna Jn. Is the only En-route examination point, where all the through and terminating trains are given Rolling-in examination. At DNR, RJPB,PPTA, KEU MKA, JAJ, IPR, and RGD only terminating trains are given Rolling-in examination.

Patna Jn. is the en-route examination point in Danapur where all the through and terminating trains are given Rolling-in examination. At DNR, RJPB,PPTA, KEU MKA, JAJ, IPR, and RGD only terminating trains are given Rolling-in examination.

Depot

No. of Trains

Av. No. of coach/day

PNBE

Enroute train passing/ Through passing trains (As per Rake link)

88

748

Terminating/Originating//Passing

38

345

RJPB

21

200

DNR

05

195

PPTA

25

259

MKA

1

11

JAJ

1

3

RGD

6

149

IPR

2

48

KEU

7

75

TOTAL


194

2033

Depot: RNCC: MEGA

DNR: Medium

PNBE: Minor

RGD: Medium

Holding of DNR Div. as on 01.04.2021
    Holding AC/NAC
    RNCC DNR RGD TOTAL Total
Rajdhani LWFAC 6 0 0 6 LHB AC 358
LWACCW 18 0 0 18
LWACCN 25 0 0 25
LWCBAC 4 0 0 4
LWLRRM 6 0 0 6
  TOTAL 59 0 0 59
Sampoorna Kranti + CSTM Suvidha + Archana + Ziyarat + Jansadharan + HUMSFR LWFAC 12 4 0 16
LWFCWAC 2 0 0 2
LWACCW 47 9 0 56
LWACCN 128 12 0 140
LWCBAC 16 0 0 16
LWLRRM 44 13 0 57
LWSCN 181 15 0 196 LHB NAC 382
LS 56 87 0 143
LSLRD 2 0 0 2    
  TOTAL 488 140 0 628    
Jansatabdi (LHB) LWSCZAC 6 0 0 6    
LWSCZ 41 0 0 41    
LWLRRM 6 0 0 6
  TOTAL 53 0 0 53    
Jansatabdi WGSCZACJ 3 0 0 3    
WGSCZJ 4 0 0 4    
WGSCZRJ 0 0 0 0
  TOTAL 7 0 0 7    
M/EXP WGFAC 4 0 0 4 ICF AC 122
WGFACCW 3 0 4 7
WGACCW 16 8 5 29
WGCWNAC 18 0 0 18
WGACCN 43 1 12 56
WGSCZAC 3 2 0 5
GS/GSCZ 122 80 22 224 ICF NAC 500
GS/C 0 5 0 5
WGSCN 137 7 45 189
WGSCN/C 5 2 0 7
WGCB 8 0 4 12
SLR 36 13 10 59
  TOTAL 395 118 102 615    
  Grand Total 1002 258 102 1362   1362

2.2INFRASTUCTURE AVAILABILE.

 RNCC

Pit-1

Length- 514.5 m with catwalk.Present Capacity- ICF - 23 coach, LHB- 21 coach

Pit-2

Length- 550 m with catwalk.Capacity - ICF - 24 coach, LHB- 23 coach

Pit-3

Length- 550 m with catwalk.Capacity - ICF -24 coach, LHB- 23 coach

Pit-4

Length- 535 m with catwalk.Capacity - ICF - 24 coach, LHB- 22 coach

Pit-5(LHB PIT covered shed)

Length- 490 m with catwalk.Capacity - ICF - 21 coach-, LHB- 20 coach

Sick line

2 lines under covered shed of 4 coach berthing in each line

DNR

Pit-1

24 coach length catwalk (Only South Side).

Pit-2

24 coach length without catwalk (Only North Side).

Pit-3

24 coach length with catwalk.

Stabling

One of 24 coach length without any maintenance facilities.

Sick line

One line under covered shed for 3 coach berthing (Wheel changing facility in process).

PNBE

Pit-1

24 coach length (Partial catwalk on only North side) .

Pit-2

15 Coach lengths without cat walk.

Sick Line

Nil

MKA

Pit

Nil

Stabling

One of 18 coach length without maintenance facilities.

JAJ

Pit

One Pit of 18 coach length with catwalk. (One round trip train 15941/42)

RGD

Pit

One Pit of 24 coach length with catwalk.

Sick line

Nil

2.3 FREIGHT ACTIVITIES

Flying gangs cum break down gangs have been stationed at JAJ, PNBE, MKA, BXR and DNR for attending to brake binding and minor defects at road side stations.

2.4Staff:

Depot

Sanction

MOR

Shortfall w.r.t Sanction

On Roll

Supervisor

Staff

Ministerial staff

Group C

Group D

Group C

RNCC

539

489

50

54

310

114

11

DNR

290

295

-5

34

178

74

9

RGD

58

78

-20

6

44

26

02

PNBE

224

210

14

24

108

73

05

MKA

33

32

1

1

14

16

01

KEU

28

31

-3

3

15

13

00

JAJ

48

39

9

3

19

16

01

BXR

17

23

-6

2

16

05

00

IPR

14

11

03

1

5

5

0

PPTA

111

68

43

6

35

27

0

ARA

34

0

34

0

0

0

0

Div. office

35

32

3

9

0

7

16

Total

1431

1308

123

143

744

376

45

                                              Contract position of DANAPUR division 

 
S.N. Work Description Allocation Validity period Total Contract Amount (in Rs.) Name of Firm/contractor Current status
1 OBHS+ACCA of trains of Danapur division for 04 years and Linen destribution (ACCA) in 12351/52,12401/02 for 04 Years. 08-593-32 07.04.19 to 06.04.23 Rs.44,99,52,197.20/- Urmila International Services Private Ltd.,First floor,Banke Bihari sadan,S.K Puri,Boring Road Patna Running
2 Mechanized Cleaning of trainsat DNR Depot, 08-593-32 17.06.19 to 16.06.23 Rs.24,34,68,312.37/- M/S RAKSHAK SECURITAS PVT. LTD., T-5, PLOT NO.12, MANISH PLAZA-III, SECTOR-10, DWARKA, Running
3 Mechanized coach cleaning (Exterior, Interior & Toilets) of primary/ Secondary maintenance rakes at PNBE 08-593-32 05.10.17 to 04.10.20(Extended upto 04.06.21) Rs.4,85,79,675/- Prime Cleaning Services
25, Newal Kishore Road
Hazratganj, Lucknow – 226001
Running
4 Mechanized Cleaning of Trains at RNCC depot. 08-593-32 21.09.19-20.09.23 Rs.44,34,07,190/- Urmila International Services Private Ltd.,First floor,Banke Bihari sadan,S.K Puri,Boring Road Patna Running
5 Mechanized Cleaning of Trains at RGD Depot. 08-593-32 01.06.19 to 31.05.23 Rs.5,27,37,205.66/- Aftab Infocom Private Limited, At PO- Lakho, Ward No.04,Begusarai, Bihar Running
6 Pest & Rodent control of coaches of danapur division along with rodent control of yard & Rodent,fly,mosquito control at RJPB,PNBE & RGD Railway stations. 08-593-32 24.03.19-23.03.23 Rs. 4,26,89,334.45/- Hughes & Hughes Chem. Limited, Flat No.5, R-10, Nehru Enclave, New Delhi-110019 Running
7 AMOC of Bio-Toilet 08-590-32 17.03.19-16.03.21 Rs.12,83,94,525.60/- Hughes & Hughes Chem. Limited, Flat No.5, R-10, Nehru Enclave, New Delhi-110019 Running
8 Dry cleaning of coaches of Turn Round trains of RGD, JAJ, KEU, FUT, BKP, MKA & PPTA depot including watering & padlocking for 02 years 08-593-32 03.05.18-02.05.20(Extended up to 30.04.2021) Rs.2,06,93,076.25/- Navyouvak Sangh Sramik, Swablambi Sahkari Samiti,Begusrai Running
9 Periodic Schedule Maintenance of AMDBS installed in LHB coaches (knorr-Bremse) 06-211-32 01.09.18 to 30.08.20(Extended upto 28.02.2021) Rs.10,73,35,582/- Knorr-Bremse India (P) Ltd., 51/4, KM Stone, Vill.+ P.O-Baghola , Delhi Mathura Road (NH-2), Palwal-121102, Haryana (India) Running
10 Periodic schedule maintenance of axle mounted disc brake system installed in LHB coaches (FTRTIL make) 06-211-32 16.01.19-15.01.21 Rs.13,05,42,956.87/- Faiveley Transport Rail Technologies India Limited, Post Box No.39, Harita, Hosur – 635109, Tamilnadu, India Running
11 Road transportation of BG ICF trolleycomplete including loading & unloading at RNCC Depots of Danapur div. 06-211-32 01.12.20-30.11.22 Rs. 3,91,51,814.70/- M/s Gudia Construction-Begusrai Running
12 Road Transportation of component like bogie, wheel set etc. by trailer truck from /to Danapur coaching depot to/from Liluah, Gorakhpur, Harnaut, RCF/Kapurthala, RCF/Raibareliand other workshop/depots/Production units for 01 years. 06-211-32 01.12.20-30.11.21 Rs.1,59,76,952.40/ Ameet kumar,gaya Running
12 AMC of Wheel lathe machine at RNCC 06-211-32 09.08.19 to 08.11.22 Rs. 13382171.58/- HYT Engineering Company Pvt. Ltd. 17-18, Ground Floor, Hans Bhawan, Bahadur Shah Zafar Marg, New Delhi -110002. Running
13 Watering in trains at Patna Jn. 06-211-32 (01.02.2020 - 31.01.2023) Rs.5,88,87,609.44/- Prabhakar Enterprises,Bharuch Running
14 Hiring of 09 Ton capacity , heavy and robust underframe truck for Mechanical (C&W) deptt. of Danapur division on regular basis for 02 years 06-211-32 04.07.18-04.03.21 Rs. 25,29,450/- Ameet kumar,gaya Running
15 AMC of EOT of cranes of capacity 03 Ton (Plicare make) situated at RNCC depot through OEM 07-330-32 07.02.18-06.02.21 Rs.9,72,674/- Plicare cranes,Kolkata Running
16 AMC of EOT of cranes of capacity 05 Ton (Plicare make) situated at DNR depot through OEM 07-330-32 24.07.18-23.07.21 Rs.13,85,084/- Plicare cranes,Kolkata Running
17 Vehicle hiring for ADRM & CMS of DNR Division. 03-122-32 01.11.20-31.11.22 Rs. 40,03,200/- Ameet kumar,gaya Running
18 Vehicle hiring for Mechanical department officer of DNR Division. 03-122-32 01.12.20-30.11.21 Rs.39,47,916/- Rudra Tour and Travels,Patna Running


Contract Status of TL &AC

Name of work

Name of the firm

LOA dt

End Date

Agreemental Value

AMCfor 25 KVA invertor manufactured by M/s Hitachi Hi-Rel Power Electronics Pvt. Ltd. Make fitted inSGAC coaches of DNR divn. For 3 years.

M/s Hitachi Hi-Rel Power Electronics Pvt. Ltd

30.11.2018

30.11.2021

6793193.88

AMCfor 25 KVA inverters of M/s Hind Rectifiers Ltd. Make fitted in SGAC coaches of DNR, SPJ, SEE & DHNdivn. Of E.C. Railway.

M/s Hind Rectifiers Ltd.

30.6.17

29.6.2020 (extension till 28.10.2020)

26104800

AMCfor 25 KVA invertor of MEDHA Servo Drivesmake fitted in SGAC coaches of DNR divn. For three years.

M/s MEDHA Servo Drives

21.8.2019

3 yrs.

3185759.81

AMCfor 25 KVA inverter of Waves make fitted in SGAC coaches of DNR divn. For three years.

M/s Electro Waves

20.8.2019

3 yrs.

2287310.4

AMCfor 25 KVAinvertors manufactured by M/s Siemens Ltd. fitted in SGAC coaches of DNR divn.of3 yrs.

M/s Siemens India Pvt. Ltd

13.11.17

12.11.2020

23722956

AMC for RMPU of LHB type AC coaches over Danapur. (Amit Engineers)

M/s Amit Engineers

18.9.17

17.9.2020 (extension till 16.01.2021)

66315914

AMC for RMPUAC coaches Excluding LHB AC coaches of DNR & DHN division for the period of three yrs.

M/s Sidwal Referigeration

23.10.17

22.10.2020 (extended till 22.02.2021)

58676106

Corrective maintenance contract of pantry electrical equipments of LHB coaches of Patna Rajdani Ex., Sampurna Kranti Exp. other LHB coaches Exp. trains and Pantry equipments of AC chair car of Jan Shatabdi Ex. for three years over Danapur Division.

M/s Kalika Cooling Sytems

28.8.2018

27.8.21

2757722

Modification of EOG LHB coaches for operation through HOG system as per RDSO/PE/MS/AC/0051-2011 (Rev.-2) dated 21.2.2016

M/s MEDHA Servo Drives

31.1.2018

30.1.2019 (Extension up to 31.12.2020)

32408787

AMCfor 25 KVA invertor manufactured by M/s Autometers Alliance Ltd. Fitted in SGAC coaches of DNR divn. for3 YRS.

M/s Autometers Alliance Ltd.

4.6.2018

3.6.2021

7650000

AMCfor 25 KVA invertor in AC coaches manufactured by M/s Signotron make fitted in AC coaches of DNR,SEE & DHNdivn. for3 YRS.

M/s Signotron

30.8.2018

29.8.2021

3921450

Comprehensive AMC of Grieves cotton make generator car for scheduled maintenance including A,B & C check of Diesel Engine, their operation to stand Power supplyduring maintenance of Rajdhani, SampurnaKranti, Suvidha, Archana, Jiyarat, Tinsukia, Vaishali Exp. Under DNR, DHN, SEE & MGS division and escorting of Power Cars of DNR, DHN & MGS division for Three years.

M/s Deev Genset Sales and Services

27.5.2019

3 years

58191563.23

Comprehensive Annual Maintainance Contract for Cummins make Diesel Engine Model No. KTA19G5/KTA19G-10 for Power Car in Danapur division for three years.

M/s Cummins India Pvt Ltd.

16.01.2020

3 yrs.

162584573.8





PERFORMANCE WITH RESPECT TO TARGETS


Parameter

Target 20 - 21

18-19

19-20


20-21


Remarks

Coach

Ineffective % AC Coaches (including Workshop)

6

8.3

5.7

4.2

52% Improved

Ineffective % Non-AC Coaches (including Workshop)

5

7.7

4.5

3.3

52 % improved

IOH/Month

50

57

45

59

IOH started at DNR depot also

Punctuality loss Direct cases per year

54

137

77

8

-

Punctuality loss Total cases per year

120

202

141

10

-

Enroute detachment per year (Territorial basis)

1

0

1

2

NF WGSCN 14222 & 06217, ( Hytral pad Worn out)

Enroute detachment per year (Ownership basis)

1

2

1

0


Secondary detachment (Territorial basis) Other railway coaches in our division.

20

20

39

21

Electrical- 01, Silent bush cut -01, Car body nut broken - 01, Spring Broken - 09, BP Angle cock -01, WSP - 01 & flexible pipe of Air spring - 01

Secondary detachment (Ownership basis)

10

24

27

18

Spg. Broken ( LHB)- 05, Brach pipe Broken- 01, Compressor - 02, Air spring leakage - 05, WRA -01, Inverter-01, Less Cooling-01 & Control Arm - 01

Condemnation of coaches

68

32

28

100


Ferrous scrap to stores

50MT

262.11MT

236.797 MT

2316.1MT


Freight

Enroute Detachment(Excluding Hot Axle )

1

2

0

1


Poor Brake Power

NIL

0

0

0


Train Parting

2

2

5

4


Spring Breakage

0

0

0

1


Hot Axle

1

8

3

5

Other Rly Wagons

Wagon ineffective %

0

0

0

0

No Holding



Secondary Detachment (Other end):

Sl

No.

Depot

Train

No

Detachment Coach no

Left on

Det. On

Det.

At

Vice attached Coach no

Cause

Rly

Type

No

Rly

Type

No

1

RNCC

02393

EC

LS-5

193223

05.06.20

06.06.20

NDLS

NR

LS

163446

BRANCH PIPE BROKEN

2

RNCC

03201

EC

LWSCN

195833

13.06.20

15.06.20

LTT

EC

LWSCN

193008

Primary outer spring broken

3

DNR

03251

EC

LWSCN

196845

30.10.20

02.11.20

YPR

SW

LWSCN

202955

Primary inner spring broken

4

RNCC

02393

EC

LWACCN

14140

04.11.20

05.11.20

NDLS

NR

LWACCN

10948

Both compressor tripping

5

DNR

03209

EC

LWACCN

194695

14.11.20

17.11.20

YPR

SW

LWACCN

11114

Primary inner spring broken

6

DNR

03209

EC

LWSCN

196837

14.11.20

17.11.20

YPR

EC

LWSCN

196845

Primary inner spring broken

7

DNR

03209

EC

LWSCN

196845

28.11.20

01.12.20

YPR

SW

LWSCN

191712

Primary inner spring broken

8

RNCC

02352

SE

LWSCN

193157

07.12.20

08.12.20

HWH

EC

LWSCN

17210

Air spring leakage

9

RNCC

03202

EC

LWACCN

195866

21.12.20

23.12.20

LTT

CR

LWACCN

16104

Air spring leakage

10

DNR

03252

SR

LWACCN

199493

01.01.21

04.01.21

YPR

SW

LWACCN

17120

WRA defective

11

RGD

02392

EC

WGACCN

08103

05.01.21

06.01.21

NDLS

NR

WGACCN

01130

Inverter fail

12

RNCC

02352

EC

LWSCN

17210

08.01.21

09.01.21

HWH

ER

LWSCN

194567

No.-01 control arm holding supporting block crack

13

DNR

03252

EC

LWACCN

09104

08.01.21

11.01.21

YPR

SW

LWACCN

192849

Less cooling

14

DNR

03252

EC

LWACCN

196046

12.02.21

14.02.21

YPR

SW

LWACCN

11114

Primary spring broken

15

RNCC

03391

EC

LWACCN

11102

08.03.21

09.03.21

NDLS

ECo

LWACCN

196540

C.P. 2.1 Leakage

16

RNCC

03237

EC

LWS

195834

09.03.21

10.03.21

KOTA

NR

LWS

205084

DH SS primary outer spring broken

17

RNCC

03239

EC

LWSCN

196839

18.03.21

19.03.21

KOTA

WC

LWSCN

196269

Primary outer spring broken

18

RNCC

03201

EC

LWSCN

197330

20.03.21

22.03.21

LTT

NE

LWSCN

191360

Primary outer spring broken


Condemnation of COACHES & wagon under process:

Summary

Sl No

Status

No.

Location

Coach

Wagon

1

Offered to Stores For auction        16
         0


    2

Sold awaiting handing over

0

0

 

3

Handed over awaiting removed

00

0

4

Condemnation approval at H/Q

00

0


5

Awaiting CR/Survey

0

0


6

Awaiting Survey Fin con (burnt/accidental)

0

0


7

Awaiting Survey Fin con (Over aged)

0

0



TOTAL

16

0


 


Staff Position  ( Electrical  TL & AC):



ECR

AC & TL

SENIOR SECTION ENGINEER (AC +TL)

16