|
|
|


DIVISION AT A GLANCE (as on 31.03.2020)
# DHANBAD division has 1213.195 route Km out of which 458.702 is double line and 754.493 is single line, covering 4 states i.e. Jharkhand,U.P.,bihar & M.P. # It has 2666 bridges out of which 181 are major bridges , 2320 minor bridges ,108 ROB & 57 are RUB.# There are 140 stations out of which 137 are block stations (incl. B.H.) & 03 no. of IBPS.# It has < 2 degree 278 nos. , 2 degree to 3 degree turn is 347 nos ,3 degre to 4 degree turn is 120 nos. Total curve is 565 nos.# The existence of tunnel at 3 places adds a feather in the cap of division.1st Tunnels lies in block section DLW – NGY, Location 415/21-35, degree of curvature is 3.62 degree, length is 239.3 m, 2nd Tunnel lies in block section NGY-BSCP, location 414/33-45 degree of curvature is 3.08 degree, length is 190.0 m, 3rdTunnel lies in block section NGY-BSCP . Location 410/27-35, degree of curvature is 3.78 degree, length is 107.62 m. #The Parasnath Jain temple which finds its mention in the world tourists Pilgrim destination is situated in this division. Parasnath, the 23rdthirthankara, attained ‘NIRVANA’ here.
*Some commercial positives of this division are undermentioned... Average no. of passengers during year 2019-20:- Reserved (in Lakhs) | Unreserved (in Lakhs) | Total (in Lakhs) | 31.27 | 262.30 | 293.57 |
Average Passenger earnings during year 2019-20:- Reserved (in Crores) | Unreserved (in Crores) | Total (in Crores) | 164.20 | 142.78 | 306.98 |
Average Ticket Checking during year 2019-20:- No. of Cases | Total Earning (in Lakhs) | 239.58 Thousand | 985.4 |
Average loading during year 2019-20:- Coal | Goods | 10.32 million tons | 0.66 million tons |
Parcel earning during year 2019-20:- Weight (in Quintal) | Earnings (in Crores) | 1.15 | 3.11 |
Source : East Central Railways / Indian Railways Portal CMS Team Last Reviewed on: 24-11-2020
|
|
|