                                   OPERATING DEPARTMENT


 1.0  ORGANISATION CHART


                            Md. Imteyaz Alam

                                                                   Sr. DOM

                                         

   Manoj Kumar Ranjan                    Manoj Kumar                                                  DOM                                       SD/MFP

                                                                                                                                                                                                            

                                                                                                                                                             

            Paras Kumar Singh                    Vinod Kumar                            Arvind Kumar

                AOM (Plg)                                   AOM/Chg                                     AO/BJU

                                

  2.0    INTRODUCTION:

2.1     Route KMs                                :         525.01

                                              (D spl - 451.0, E route– 74.01).

2.2     Crossing Stations                     :       68 (Excl. SPJ)

2.3     Special Class Station               :       01(One train only system – VSHI)

2.4     Halt/Flag                                  :        27

2.5     Special Halt                             :        02 (One train only system – GTH, LLJP)

2.6     Signaling & Interlocking           :        Standard Interlocking II®

2.7     IBH in division                         :         Bet. BJU-TGA, BCA-TGA, MNE-MSK,                                                                                      DGA-BAGL & PSR- NNR.

2.8     No. of Goods Shed                 :         13

2.9     Industrial/Private Siding          :         06


3.0    GENERAL INFORMATION :-

Type of Station

No. of Stations

Crossing Station :

68 (Excluding Samastipur)

Flag/Halt :

27

Total  :

95 (Excluding Samastipur)

                3.1  Classification of Station in Sonpur Division:

Category of stations

Name of stations

NSG 1 - 00

---

NSG 2 - 01

MFP

NSG 3 - 04

SEE, HJP, BJU, KGG

NSG 4 - 03

BGS, MNE, NNA

NSG 5 - 19

DGA, DES, MNO, SPP, MOG, GRL, DOL, KRBP, DSS, BCA, LKN, SKJ, MSK, PSR, NNR, THB, KUE, CRR, SMO

NSG 6 - 45

GJH, BAGL, ATNR, STLR, NYO, PMU, PHLG, CKRD, AYRN, CSR, BDUA, SDG, NNNL, VPDA, GWH, VSHI, LLJP, HUFP, SAI, BTHL, BNR, KHI, TUR, RD, NRPA, SLT, SSO, DUBH, KPGM, UJP, NAZJ, STJT, TGA, BUJ, NBJU, DKGS, TIL, DPL, LAK, UMNR, SBDP, GAI, KHQ, KTRH, BKHR

The division caters the need of NF region and North Bihar. There are 13 nos. Rake handling siding and 06 nos Private sidings. The details are as under :-

3.2    Goods Shed over division :-


Name of Station & Handling Capacity

Capacity of Wagons

Traffic dealt with

Inward

Outward

Narayanpur Anant

L/15 & 19  – Half rake, L/18 & 21 - Full rake

Stone Chips, Salt, fertilizer, Coal,Food Grain, Clinker & Sand

--

Karpurigram

L/5 – Full rake ,

L/6 & 07 -  Half rake

Cement,Salt Fertilizer & Stone chips

--

Barauni

L/ 27 & 28 – Half rake

Cement, S/Chips, Food Grain & Fertilizer

C. P. Coke Maize

Khagaria

L/6 – Full Rake

Stone Chips, Cement, Salt, & Fertilizer

Maize

Naugachhia

L/4 – Full Rake

Cement, Salt, & Fertilizer

Maize

Sarai

L/4 – Full Rake

Cement, Fertilizer, Stone chips, Salt, Food Grain & Tractor

-----

Harauli Fatehpur

L/3 – Full Rake

Stone chips

---

Semapur

L/6 – Full Rake

--

Maize

Kursela

L/4 – Half rake

--

Maize

Mansi

L/7 – Full Rake

All commodities except POL

Maize

Nayagaon

L/5 – Full rake

Boulder, Stone Chips and Ballast.

----

Garhara

Sorting 6 – Full rake        (BOXN -58)

RPC (Raw petroleum coke)

---

Tilrath

L/6- Full Rake

Cement, Fertilizer, Food Grain & Bitumen

Maize



3.3    Private Sidings:-

Name of siding

Line no and its

Holding capacity

Commodities dealt with

Inward

Outward

Bihar Thermal Power Station, Simaria.

L/1, 2 &  3

Full rake

Coal, Furnace oil

----

Indian Oil Corporation,

Barauni.

L/1, L/2,

L/3, L/4.

Half  Rake

POL

POL & RP Coke

PSC sleeper siding, Sarai.

L/5 & L-6.

Half rake

---

Sleepers

BPCL Private Siding, NarayanpurAnant.

L/1

Full rake

POL

---

FCI siding at NarayanpurAnant

L/1 to 

L/5

(Full rake placement including all lines

Food Grain

---

HURL siding at Garhara

L/1 & 2

Full rake

--

Fertilizer


3.4     Line capacity utilization of various sections (2021-22) :


Section

Double line or Single line

Charted

Capacity each way

Average Train services each way daily (In peak period)

%age Utilization of charted capacity

Without MB

With MB 

Without MB

With MB

Chapra Gramin – Sonpur

DL

50

42

49.73

99.46

118.40

Parmanandpur -Pahleja Ghat

SL

36

32

06.00

16.67

18.75

Pahleja Ghat - Sonpur

SL

36

32

21.17

58.81

66.16

Sonpur – Hajipur

DL

50

42

69.19

138.38

164.74

Hajipur - Muzaffarpur

DL

50

42

36.43

72.86

86.74

Muzaffarpur – Samastipur

DL

50

42

44.43

88.86

105.79

Samastipur – Bachhwara

DL

50

42

44.29

88.58

105.45

Bachhwara – Barauni

DL

50

42

76.93

153.86

183.17

Barauni – Dinkar Gram Semaria

T/SL

50

42

43.00

86.00

102.38

Sahebpur Kamal-Sabdalpur

SL

36

32

17.10

47.50

53.44

Sabdalpur – Umeshnagar

SL

36

32

09.30

25.83

29.06

Barauni – Khagaria

DL

50

42

45.57

91.14

108.50

Khagaria – Mansi

DL

50

42

59.56

119.12

141.81

Mansi – Koshi Block Hut

DL

50

42

40.21

80.42

95.74

Koshi Block Hut – Kursela

TSL

45

42

40.21

89.36

95.74

Kursela – Katihar

DL

45

40

40.21

89.36

100.53

Bachhwara– Sahdeibuzurg

DL

45

38

32.64

72.53

85.89

Sahdeibuzurg - Akshayvatrai Nagar

SL

22

18

32.64

148.36

181.33

                                                 

                                            OPERATING PERFORMANCE:

4.0  Coaching performance:-

4.1     Nos. of Coaching Trains running in Sonpur Division (In pairs)

Trains

Total Trains

Daily

Non-Daily

Mail/Exp.

123

32

91

Pass.

31

31

00

Total :

154

63

91



Type of Trains

Number (in pairs)

Garib Rath

03

Rajdhani Express

04

Super Fast Express

21

Mail/Express Trains

95

Passenger Trains

31

                            Total

154

                                                                                  
                         Number of Trains Originate/Terminate :

To/From Station

Number (in pairs)

Mail/Express

Passenger

Barauni

08

06

Muzaffarpur

13

07

Sonpur

0

05

Total

21

18

             

4.2      Comparative Punctuality Performance (M/Exp trains) :-


Month

2021-22

2022-23

% age variation

April

94.3

83.7

-10.6

May

96.3

    87.1

      -9.2      

June

96.0

    92.7   

      -3.3  

July

95.2

    96.1

       0.9

August

96.7

    93.7   

      -3.0   

September

93.2

    89.5

      -3.7

October

94.4

    88.2

      -6.2 

November

87.3

    85.4

      -1.9

December

88.9

    86.7

      -2.2

January

86.2

    81.9

      -4.3

February

84.5

    

      

March

81.7

    

      

Overall

90.3

    

       

   

    Running of special trains :

    During 2022-23 (upto Jan'23), 22086 special trains run in comparison to 21488 special trains of last year.

 

Up to January

% variation

 

2021-22

2022-23

 

No. of Special Trains

21488

22086

        2.78

 

   5.0     Goods performance:-

5.1     Goods performance in comparison to corresponding period of  last    

           financial year.


Items

2021-22

(up to Jan)

2022-23

(up to Jan)

       % VARIATION

Achieve-ment

Target

Achieve-ment

With

Target

with

L.Y.

Loading (MT)

1.934

2.132.3058.2219.18

POL (MT)

1.13

1.221.4821.3130.97

General Goods Incl. Maize (MT)

0.804

0.910.825-9.342.61

Wagon Interchange

2332232

---2373074---1.75

Freight Train Interchange

50243

---51620---2.74

WTR

1.10

---1.02----7.27

Wagon Holding

2924

---2854----2.39

Diesel Utilization

397

--3850.0-3.02

Diesel outage

24.67

---20.0----18.93

Electric utilization

339

--353-6.774.13

Electric outage

43.4

---50.0---15.14


5.2   Inward rakes comparative figures :-


Terminals

Nos. of rake in

2021-22

(up to Jan)

Nos. of rake in

2022-23

(up to Jan)

%age

 variation

Naugachhia

318

289-9.1

Khagaria

211

209

-0.9

Barauni

106

121

14.2

Garhara

329

255

-22.5

Karpurigram

475

475

0.0

NarayanpurAnant

894

1000

11.9

Sarai

375

397

5.9

Nayagaon

75

94

25.3

IORG

170

60

-64.7

BTSS

332

531

59.9

TIL

324

288

-11.1

MNE

11

01 

-90.9

HUFP

00

141

100.0

Total

3620

3861

6.7
















5.3   Outward rakes comparative figures :-


Terminal

Nos. of rake in 2021-22

Nos. of rake in 2022-23 

%age

(up to Jan)

(up to Jan)

variation

Semapur

47

31

-34.0

Kursela

52

38

-26.9

Naugachhia

19

14

-26.3

Mansi

60

43

-28.3

Khagaria

52

32

-38.5

Barauni

14

18

28.6

IORG

429

562

31.0

NRPA

29

04

-86.2

GHZ

01

12

1100.0

KPGM

00

07

100.0

TIL

01

01

0.0

HUFP

00

01

100.0

HUBG

00

45

100.0

BTSS

00

08

100.0

Total

704

816

15.9


6.0   Staff position of Safety category as on 01.02.2023:-


Category

BOS

On roll

Vac.

Remarks

SM/ASM/YM/TI

477

447

30

Guard

544

516

28

Shunting Master

30

07

23

Shuntman

64

32

32

Pointsman

444

601

+157

Gateman

375

136

239

CTNL/TNL

     56      35     21



7.0 Status of Sanctioned works (As on 01.01.2023)  :-

Name of work

PH

Sanction year

Cost

(in thou.)

Status

Hajipur-Sagauli via Vaishali (148.3 km)

11

2003-04

20667800

Hajipur-Ghoswar section commissioned on 04.12.16. Ghoswar – Vaishali (30 Km)- Commissiomed on 10.04.2020. Vaishali- Deoria (30.0km) targeted in 2023 -24.

Hajipur-Ramdaualu Nagar (47.72 km)

15

2013-14

5182723

Doubling between HJP-RD completed. Yard remodelling work of SAI station completed on 29.04.22.

Katreah-Kursela - Patch doubling incl. bridge on river Koshi (7.24 km)

15

2012-13

2512973

Katereah-Kursela (7.24 km) commissioned on 28.12.2021

Hajipur-Bachwara (72 km)

15

2015-16

9438625

Doubling between BCA-SDG completed. Doubling between HJP- AYRN commissioned on 24.03.22 & Final Phase from AYRN to SDG commissioned on 28.09.22.

Barauni - Improvement of traffic facilities at bye pass station

16

2015-16

571865

Work completed on 07.12.2022.


MNE: Provision of Shunt signal at both end in line no. 01, 02 & 03 and at KGG end in line no. 04.

16

2015-16

9189

Outdoor cabling and new relay room work completed. CRS sanction and approved diagrams available. patching from existing to new relay room involving is required.

TDC : 31/03/2023

Katreah - New freight terminal

16

2016-2017

132951

Track linking and Goods wharf completed. Commercial notification with diesel loco processed. Completion of TRD works & interlocking work to be completed by March'23.

TDC : 31/03/2023

Dubaha - Addl. loop

16

2016-2017

74000

Engg-  Earth work, retaining wall 100% completed. Blanketing work in progress. 

S&T- Revised ESP & SIP approved. Outdoor works in progress (40% completed).

TRD - Foundation work completed. Supply of some portals etc. erection, wiring & commissioning are balance.

TDC : 31/03/2023

MFP - Remodeling of MFP station.

16

2018-2019

412000

Commissioned on 12.11.2022.

Provision of IBH in MNE-MSK section.

16

2019-20

46859

IBH commissioned on 24.09.2022. Final variation under process.

Provision of x-over instead of Derailing switch at 18 nos location.

16

2019-20

75938

Engg - ESP of 07 feasible stations (TIL, UJP, RD, TUR, KHI, BNR, SAI & DGA) approved. 

TDC : 31/12/2023

Provision of IBH between SMO- KIR.

16

2019-20

49734

S&T : SIP of SMO approved. SIP of KIR is required to be altered & approved from NF Railway. Outdoor works in progress (25% completed).

Engg : Building ready. 

Elect : (a) Electrical wiring completed. (b) UP AT & DN AT of 10KVA rating each is yet to be provided.

TDC : 31/03/2023

Provision of IBH in SPJ-UJP section.

16

2019-20

45434

S&T : SIP approved. CRS sanction awaited. Outdoor works completed & indoor works 60% completed.

Engg & Elect(G) work completed.

TDC : 15/02/2023

DGA-BAGL :- Provision of IBH at Avtarnagar Halt between DGA-BAGL

16

2019-20

47737

IBH commissioned on 10-Dec-21. Completion diagram under process.

Provision of IBH in BCA-TGA section.

16

2019-20

45618

IBH commissioned on 02-Sep-2022. Completion diagram under preparation.

Nazirganj -  Provision of directional loop line

16

2019-20

134356

Engg.: Earth work completed.Gate lodge was in progress.

S&T: LOA issued on 14.03.2022. ESP, SIP & ST approved. CRS application submitted on 21/07/2022. CRS observation received on 16.08.2022. ESP under alteration in compliance of CRS observation

TDC : 31/05/2023

Muzaffarpur- Construction of 40 Bedded (2x20 bed) new Running Room

16

2019-20

16875

Work completed.

Samastipur Jn.~~Barauni Jn~~Provision of automatic block signalling with centralised traffic control system

16

2021-22

1224000

Detailed estimate vetted. Tender opened on 20.12.2022.

Provision of IBH in SEE-HJP section.

16

2021-22

44993

Detailed estimate under preparation.

Provision of IBH in BCA-VPDA section.

16

2021-22

45004

Detailed estimate under preparation.

Provision of IBH in MFP-RD section.

16

2021-22

44904

Detailed estimate under preparation.

Provision of shunt signal at SMO connecting to good shed line.

16

2021-22

10676

Engg.: LOA issued on 20.09.22. Work to start.

S&T : SIP under preparation. 

TDC ; 31.05.2023

Provision of shunt signal at KGG in line no.03 & T/W shed.

16

2021-22

6159

Work to be done alongwith NI work.

TDC : 28.02.2023

Provision of shunt signal at NNA Goods shed.

16

2021-22

4352

Engg.: LOA issued on 20.09.22. Work to start.

S & T : SIP approved. ST & PFD under preparation.

TDC : 31.03.2023

Construction of 20 Bedded new Running Room at MNE

16

2021-22

15480

LOA issued on 24.08.2022. Drawing under approval.

TDC : 31.03.2023





Source : East Central Railways / Indian Railways Portal CMS Team Last Reviewed : 10-02-2023  


  Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.