Salient features of Danapur Division.doc system Map 08.07.20-Model.pdf
East Central Railway | CivilEngineering Deptt.Danapur Division. | Details of contracts concluded during the month of Rs. Above 01 Crore (from 01/01/2021 to 31/01/2021). | | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | Tender No. | Item Nature of work | Mode of tender Inquty | Date of publication of NIT | Types of bidding (single two-Bid system) | Last date of receipt of tender | Nos. of tender received | Nos.& names of parties qualified after technial evaluation | Nos.& names of parties not qualified after technial evaluation | Whether contract awrded to lowest tenderer Evaluated of | Contract No. & date | Name of Contractor | Value of Contract | Scheduled date of completion of supplies | W-7/E-Tender./12 /Open/ DNR /2020-21 dt.13.11.20. | Provision of IBH at Nadaon between BUE-BXR under Sr.DEN(3)/DNR section. | Open | 13.11.20 | Single | 08.12.20 | | 1.M/s Subhash Kumar Yadav 2. Shailendra Chaubey 3. Manoj Kr.Sinha
| Nil | Yes | DNR DIVN Engg/ W-7Etender12Open dnr 20-21-01/ 00973500031223 dt. 21.01.21. | M/s Subhash Kumar Yadav | 1,14,11,366.74 | 20.07.21 | | | | | | | | | | | | | | | | | | | | | | | | sd/- Sr.Divnl.Engineer(Co-ordn.), E.C.Railway,Danapur. | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
East Central Railway | CivilEngineering Deptt.Danapur Division. | Details of contracts concluded during the month of Rs. Above 01 Crore (from 01/12/2020 to 31/12/2020). | | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | Tender No. | Item Nature of work | Mode of tender Inquty | Date of publication of NIT | Types of bidding (single two-Bid system) | Last date of receipt of tender | Nos. of tender received | Nos.& names of parties qualified after technial evaluation | Nos.& names of parties not qualified after technial evaluation | Whether contract awrded to lowest tenderer Evaluated of | Contract No. & date | Name of Contractor | Value of Contract | Scheduled date of completion of supplies | W-7/E-Tender./07 /Open/ DNR /2020-21 dt.09.09.20. | RGD-Provision of water recycling plant at RGD Coaching Depot. | Open | 10.09.20 | Single | 02.10.20 | 3 | 1.MECO Technologies Pvt.Ltd. 2. M/s Mercury International Pvt.Ltd. 3.Bluediamond Techno Engineers.
| Nil | No L-2 | DNR DIVN Engg/ W-7Etender07 Open dnr 20-21-6/00968610029899dt. 21.12.20. | 1.M/s Mercury International Pvt.Ltd.
| 1,14,11,366.74 | 20.10.21 | W-7/E-Tender./10 /Open/ DNR /2020-21 dt. 19.10.20 | Improvement of Road surface and gate lodge of level crossing under Sr.DEN(3)/ Danapur. | Open | 19.10.20 | Single | 11.11.20 | 3 | 1.M/s Rajiv Ranjan Singh 2.R.K.Engineering 3.Deo Kumar | Nil | Yes | DNR DIVN Engg/ W-7Etender10Open dnr 20-21-01/ 00954010030006 dt. 23.12.20. | M/s Rajiv Ranjan Singh | 1,37,35,155.79 | 22.06.21 | | | | | | | | | | | | | | | | | | | | | | | | sd/- Sr.Divnl.Engineer(Co-ordn.), E.C.Railway,Danapur. | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
East Central Railway | CivilEngineering Deptt.Danapur Division. | Details of contracts concluded during the month of Rs. Above 01 Crore (from 01/11/2020 to 30/11/2020). | | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | Tender No. | Item Nature of work | Mode of tender Inquty | Date of publication of NIT | Types of bidding (single two-Bid system) | Last date of receipt of tender | Nos. of tender received | Nos.& names of parties qualified after technial evaluation | Nos.& names of parties not qualified after technial evaluation | Whether contract awrded to lowest tenderer Evaluated of | Contract No. & date | Name of Contractor | Value of Contract | Scheduled date of completion of supplies | W-7/E-Tender./07 /Open/ DNR /2020-21 dt.09.09.20. | IProvision of IBH at Kunder between JMU-BFR, Mekra Momrakhabad between BDE-PHK & Achura between RH-ATL. | Open | 10.09.20 | Single | 02.10.20 | 3 | 1.M/s P.S. Construction 2.Sunil Kumar 3. Rama Shri Sai Constn.Pvt. Ltd.
| Nil | Yes | DNR DIVN Engg/ W-7Etender06 Open dnr 20-21-3/01499330028229dt. 11.11.20. | M/s P.S. Construction. | 3,37,79,177.48 | 11.05.21 | W-7/E-Tender./08 /Open/ DNR /2019-20 dt.15.09.20. | RCC jacketing of Piers No.1,2,3 & Abutment No.1 of Bridge No.371(3x11.86 m Girder + 13x12.19m Arch) at Km.675/1-11 with grade M-20 on main line under Sr.DEN/3/DNR. | Open | 16.09.20 | Single | 08.10.20 | 4 | 1.M/s Subhadra Constn. 2.Kumar Constn. 3.Sarp Enterprises 4.Deo Kumar | Nil | Yes | DNR DIVN Engg/ W-7Etender08Open dnr 20-21-01/ 00919400028386 dt. 14.11.20. | M/s Subhadra Construction. | 2,83,,91,709.14 | 13.10.21 | W-7/E-Tender./06 /Open/ DNR /2020-21 dt.07.07.20. | Setting of quick watering arrangement at Patna Jn. under ADEN/W/PNBE. | Open | 08.07.20 | Single | 30.07.20 | 3 | 1.A.S.Builders 2.CRG Nirmala Enterprises 3.Constn. & Constn. | Nil | Yes | DNR DIVN Engg/ W-7Etender06 Open dnr 20-21-5/ 01076650028518 dt. 18.11.20. | A.S.Builders | 4,26,55,225.65 | 17.04.21 | | | | | | | | | | | | | | | | | | | | | | | | sd/- Sr.Divnl.Engineer(Co-ordn.), E.C.Railway,Danapur. | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
East Central Railway | CivilEngineering Deptt.Danapur Division. | Details of contracts concluded during the month of Rs. Above 01 Crore (from 01/10/2020 to 31/10/2020). | | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | Tender No. | Item Nature of work | Mode of tender Inquty | Date of publication of NIT | Types of bidding (single two-Bid system) | Last date of receipt of tender | Nos. of tender received | Nos.& names of parties qualified after technial evaluation | Nos.& names of parties not qualified after technial evaluation | Whether contract awrded to lowest tenderer Evaluated of | Contract No. & date | Name of Contractor | Value of Contract | Scheduled date of completion of supplies | W-7/E-Tender./06 /Open/ DNR /2020-21 dt.07.07.20. | Improvement of road surface with provision of gate lodge of L.C of Baktiyarpur-Rajgir & Fatuha-Islampur section of Danapur Division. | Open | 08.07.20 | Single | 30.07.20 | 6 | 1.M/s P.S. Construction 2.Rai Bahadur 3. Balajee Developers 4.Rama Shri Sai Constn.Pvt. Ltd. 5. Sar[ Enterprises 6. Manoj Kr.Sinha | Nil | Yes | DNR DIVN Engg/ W-7Etender06 Open dnr 20-21-10/01499330026483 dt. 01.10.20. | M/s P.S. Construction. | 2,03,83,774.27 | 31.09.21 | W-7/E-Tender./23 /Open/ DNR /2019-20 dt.11.03.20. | Supplying and stacking of 78000 cum of machine crushed track ballast 50mm size from recognized quarry conforming to RDSO’s specification for track ballast in stack measurement and loading the same into any type of Railway Wagon at Dheena Ballast siding and ancillary work of development of Dheena Ballast siding under Danapur Division. | Open | 12.03.20 | Two bid system. | 27.05.20 | 2 | 1.M/s Vijay Kumar Singh 2. M/S R.J.Trader | M/s R.J. Trader
| Yes | DNR DIVN Engg/ W-7Etender23Open dnr 19-20-01/ 01533710027648 dt. 29.10.20. | M/s Vijay Kumar Singh | 20,05,24,617.53 | 28.10.22 | | | | | | | | | | sd/- Sr.Divnl.Engineer(Co-ordn.), E.C.Railway,Danapur. | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
CivilEngineering Deptt.Danapur Division. | Details of contracts concluded during the month of Rs. Above 01 Crore (from 01/09/2020 to 30/09/2020). | | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | Tender No. | Item Nature of work | Mode of tender Inquty | Date of publication of NIT | Types of bidding (single two-Bid system) | Last date of receipt of tender | Nos. of tender received | Nos.& names of parties qualified after technial evaluation | Nos.& names of parties not qualified after technial evaluation | Whether contract awrded to lowest tenderer Evaluated of | Contract No. & date | Name of Contractor | Value of Contract | Scheduled date of completion of supplies | W-7/E-Tender./04 /Open/ DNR /2020-21 dt.04.06.20 . | Patna-DDU section- CTR(P) of UP line from Km.672 to 675 (Total =3.0 Kms.)and DN Line from Km.672 to 675 & 689.41 Km. to 690.10 (Total 3.69 Kms.) Total 6.69 Kms. under ADEN/BXR. | Open | 05.06.20 | Single | 29.06.20 | 1 | Anadi Kishore Pranami | Nil | Yes | DNR DIVN Engg/ W-7Etender04Open dnr 20-21-11/00911920025042 dt. 02.09.20. | Anadi Kishore Pranami | 1,29,08,059.09 | 01.09.21 | W-7/E-Tender./06 /Open/ DNR /2020-21 dt.07.07.20 | Provision of Second class AC waiting hall at HWH end beside Mortuary at Danapur station & improvement of AC/GI sheet by profile sheet at major station under Sr.DEN/3/DNR. | Open | 08.07.20 | Single | 30.07.20 | 4 | 1.Bhola Prasad 2.M/s Vijay Constn. 3.Rajiv Ranjan 4. Nivilal Rohita Constn.Pvt.Ltd. | Nil | Yes | DNR DIVN Engg/ W-7Etender06Open dnr 20-21-09/00843910025050 dt. 02.09.20. | Bhola Prasad | 1.02,35,173.09 | 01.03.21 | W-7/E-Tender./04 /Open/ DNR /2020-21 dt. 04.06.20. | Balance work of Elemination of unmanned level crossing No.29,36,45, 55,60 & 62 on BKP-RGD section of DNR DIVN with limited height sub-way. | Open | 05.06.20 | Single | 29.06.20 | 2 | 1.Shree Tirupati Balaje Enterprises 2.Kumar Construction. | Nil | Yes | DNR DIVN Engg/ W-7Etender04Open dnr 20-21-01/01002540025212 dt. 04.09.20. | Shree Tirupati Balaje Enterprises | 6,06,22,736.80 | 03.09.21 | W-7/E-Tender./04 /Open/ DNR /2020-21 dt. 04.06.20. | Transporting , carting & stacking of P.Way materials from any store to works site or any place to PWI store under SSE/P.Way/TD/DNR of DNR DIVN. | Open | 05.06.20 | Single | 29.06.20 | 2 | 1.M/s Aditya Teleinfra and Agro Pvt.Ltd 2.M.Sreenivasa Rao | Nil | No L-2 | DNR DIVN Engg/ W-7Etender04Open dnr 20-21-13/01119660025232 dt. 05.09.20. | Aditya Teleinfra and Agro Pvt.Ltd | 2,54,63,406.89 | 04.09.21 | W-7/E-Tender./04 /Open/ DNR /2020-21 dt. 04.06.20. | Repairs of bridges by epoxy grouting /cement grouting, normal repair in Arch, Abutment, Pier, Wing wall , Return wall, Parapet wall, Ballast wall in BKP-RGD, FUT- IPR and DHWN-BEHS section under ADEN/RGD. | Open | 05.06.20 | Single | 29.06.20 | 2 | 1.M/s Sunil Kumar 2.Praphulla Kumar. | Nil | Yes | DNR DIVN Engg/ W-7Etender04Open dnr 20-21-06/00940660025486 dt. 11.09.20 | M/s Sunil Kumar | 1,06,36,291.83 | 10.07.21 | W-7/E-Tender./06 /Open/ DNR /2020-21 dt.07.07.20. | BKP:Improvement of façade, circulating area with provision of P.F surface with mastic flooring at PF No.1,2 & 3 at BKP. | Open | 07.07.20 | Single | 30.07.20 | 11 | 1.M/s A.S.Builders 2.Rama Shri Sai Contn.Pvt.Ltd. 3.Nandi Prasad Singh 4.Miku & Miky Entratech Pvt.Ltd. 5.M/s Harisharnam Constn. 6.Amit Kumar Singh 7.Shri Tirupati Balajee Enterprises. 8.Raushari Ray 9.CRG Nirmala Enterprises 10.Balajee Developers 11.TIYO Multi Constn. | Nil | Yes | DNR DIVN Engg/ W-7Etender06Open dnr 20-21-02/01076650025545 dt. 11.09.20. | M/s A.S.Builders | 1,67,07,106.59 | 10.07.21 | W-7/E-Tender./21 /Open/ DNR /2019-20 dt.14.02.20. | Providion for different equipment for automatic wste water recycling plant andconstruction of ground water tank, Machine rooms etc. for water Recycling plant including the maintenance of WRP for 3 years at PNBE under ADEN/Works/Patna. | Open | 17.02.20 | Single | 11.03.20 | 3 | 1.Murcury International Pvt.Ltd. 2. Blue Dimond Techno Engrs 3.Core 4 Engineers. | Nil | Yes | DNR DIVN Engg/ W-7Etender21Open dnr 19-20-09/ 00968610026389 dt. 30.09.20. | Murcury International Pvt.Ltd. | 4,01,30,100.16 | 29.09.23 | | | | | | | | | | sd/- Sr.Divnl.Engineer(Co-ordn.), E.C.Railway,Danapur. | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
East Central Railway | CivilEngineering Deptt.Danapur Division. | Details of contracts concluded during the month of Rs. Above 01 Crore (from 01/08/2020 to 31/08/2020). | | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | Tender No. | Item Nature of work | Mode of tender Inquty | Date of publication of NIT | Types of bidding (single two-Bid system) | Last date of receipt of tender | Nos. of tender received | Nos.& names of parties qualified after technial evaluation | Nos.& names of parties not qualified after technial evaluation | Whether contract awrded to lowest tenderer Evaluated of | Contract No. & date | Name of Contractor | Value of Contract | Scheduled date of completion of supplies | W-7/E-Tender./02 /Open/ DNR /2020-21 dt.22.04.20. | Provision of Cover shed & pumping arrangement at Newly constructed LHS in BKP-TIA, FUT- IPR & DHWN-BEHS section of Danapur Division. | Open | 22.04.20 | Single | 29.05.20 | 12 | 1-M/s Sunil Kumar 2.Tirupati Balajee Enterprises. 3.Nimbark Engg.Pvt.Ltd. 4.Raj Kumar Gupta 5.Shivani Infratech Pvt.Ltd. 6.M/s Ray Constn. 7.S.H. Associates 8.AS Builders. 9.Ram Babu Sharma 10.Amit Bharti 11.Vijay Venture 12-CRG Nirmala Enterprises
| Nil | Yes | DNR DIVN Engg W7etender02open dnr 20-21-6/ 00940660023413dt. 05.08.2020. | M/s Sunil Kumar | 1,24,74,503.68 | 05.02.21 | W-7/E-Tender./02 /Open/ DNR /2020-21 dt.22.04.20. | Patna-DDU section – (i)TRR(P) total =23.60 Kms. on DN Line from Km.549.2 to 550.2=1.00Km., 572 to 573=1.00Km., 574 to 575=1.00Km., 595.45 to 602=6.55Km., 603.5 to 605.85=2.35Km., 683.1 to 686.1 =3.0Km., 686.4 to 687.7=1.3Km. , 690.1 to 695=4.90Km.& UP Line from Km.571.5 to 574=2.5 Km. (ii)TSR(P) total=11.335 on DN Line from Km.545.15 to 547.88=2.73Km. , 551 to 555=4.0Km., 571.095 to 571.5= 0.405Km. , 574.16 to 574.46=0.3Km., 575 to 577.6= 2.6Km. , 613.5 to 614.8=1.3 Km. under Sr.DEN/3/DNR section. | Open | 22.04.20 | Single | 29.05.20 | 1 | M/s Rakesh Construction | Nil | Yes | DNR DIVN Engg W7etender02open dnr 20-21-1/ 00932230024221dt. 19.08.2020. | M/s Rakesh Construction | 3,17,88,378/- | 18.05.21 | W-7/E-Tender./05 /Open/ DNR /2020-21 dt. 16.06.20. | Improvement of approach road and goods wharf of DD1 at FUT goods shed. . | Open | 17.06.20 | Single | 08.07.20 | 8 | 1.M/s Rama Shri Sai Constn. 2.Deo Kumar 3.Nimbark Engg.Pvt.Ltd. 4.Wellman Constn.Pvt.Ltd. 5.Manoj Kumar Sinha 6.Telesto Infrastructure Pvt.Ltd. 7.CRG Nirmala Enterprises 8.Ashiyana Constn. | Nil | Yes | DNR DIVN Engg W7etender05open dnr 20-21-1/ 00833350024098dt. 19.08.2020. | M/s Rama Shri Sai Constn. | 1,39,81,655.54 | 16.02.21 | W-7/E-Tender./04 /Open/ DNR /2020-21 dt. 16.06.20. | Patna-DDU section – CTR(P) of UP main line at Km.549.4 to 551.0 =1.6Km., 555 to 556.3=1.3Km. , 565 to 566=1.0Km.,570 to 571.095 =1.095Km., 574.46 to 575.0 =0.540Km., 610.10 to 611.34= 1.240Km., 614.8 to 620.0=5.20Km., 638.0 to 641.7=3.70Km. & Km.662.29 to 664.0=1.710Km. (Total 17.385 Kms.) and DN main Line at Km.555 to 556.20=1.2Km., 560 to 568.65=8.65Km., 568.95 to 571=2.05Km., 571 to 572=1.0, 573 to 574=1.0Km., 662 to 663.05 =1.05Km. & Km.663.05 to 667.0=3.95Km.(Total 18.90Km.-2.785Km.) = 16.115 Kms. (Total 33.5 Kms.)under ADEN/Line/DNR in the section of Sr.DEN/3/Danapur. | Open | 05.06.20 | Single | 29.06.20 | 1 | Nand Kishore Prasad
| Nil | Yes | DNR DIVN Engg W7etender04open dnr 20-21-5/ 01051100024301dt. 20.08.2020. | Nand Kishore Prasad | 6,87,95,842.38 | 19.08.21 | | | | | | | | | | sd/- Sr.Divnl.Engineer(Co-ordn.), E.C.Railway,Danapur. | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
East Central Railway | CivilEngineering Deptt.Danapur Division. | Details of contracts concluded during the month of Rs. Above 01 Crore (from 01/07/2020 to 31/07/2020). | | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | Tender No. | Item Nature of work | Mode of tender Inquty | Date of publication of NIT | Types of bidding (single two-Bid system) | Last date of receipt of tender | Nos. of tender received | Nos.& names of parties qualified after technial evaluation | Nos.& names of parties not qualified after technial evaluation | Whether contract awrded to lowest tenderer Evaluated of | Contract No. & date | Name of Contractor | Value of Contract | Scheduled date of completion of supplies | W-7/E-Tender./02 /Open/ DNR /2020-21 dt.22.04.20. | JMU- Improvement of Goods wharf and approach road and provision of water and shed facility at JMU goods shed. | Open | 22.04.20 | Single | 29.05.20 | 11 | 1.M/s Amit Kumar Singh L2 2.Rajniti Pd.Singh 3.Maheshwari Pd.Singh 4.Nandi Pd.Singh 5.RR Enterprises 6.Kumar Constn. 7.M/s Raj Constn. 8.Rama Shri Sai Constn.Pvt.Ltd. 9.Hari Sharnam Constn. 10.Shivani Infrafech Pvt.Ltd. 11.S.H.Associates
| Nil | No L2 | DNR DIVN Engg W7etender02open dnr 20-21-7/ 00925210021779dt. 09.07.2020. | M/s Amit Kumar Singh
| 1,93,24,670.77 | 08.05.21 | W-7/E-Tender./03 /Open/ DNR /2020-21 dt. 28.04.20. | JAJ-PNBE: TRR(P) DN line at Km.428.525 to 428.67= 0.145Km., 479.6 to 483.135 = 3.535Km., and from UP line at Km.386.2 to 391=4.8Km., 413.067 to 416.696 = 3.629Km., 434.56 to 435.5=0.94Km. & 455 to 456.31 = 1.31Km. (Total 14.359 Kms.) and other allied/misc work under Sr.DEN/2/ Danapur. | Open | 28.04.20 | Single | 29.05.20 | 3 | 1.M/s RDP Construction 2.Manohar Pd.Singh 3.Maheshwari Pd.Singh | Nil | Yes | DNR DIVN Engg W7etender03open dnr 20-21-1/ 00830770021809dt. 09.07.2020. | M/s RDP Construction | 1,35,36,716.66 | 08.07.21 | W-7/E-Tender./03 /Open/ DNR /2020-21 dt. 28.04.20. | Replacement of corroded steel channel sleeper with new steel channel sleeper in Br. no. 152 UP & DN, 787 UP & DN, 789 UP & DN, 708 UP and 717 UP & DN (TBTR 1517 nos.) Under Sr.DEN/2/DNR. | Open | 28.04.20 | Single | 29.05.20 | 2 | 1.M/s Jai Mangla Constn. 2.Rawatson Engineers Pvt.Ltd. | Nil | Yes | DNR DIVN Engg W7etender03open dnr 20-21-2/ 00914180021817dt. 09.07.2020. | M/s Jai Mangla Construction | 2,71,33,546.83 | 08.07.21 | W-7/E-Tender./18 /Open/ DNR /2019-20 dt.03.01.20. | Reinforced cement concrete jacketing in Br.No.378 (12 spans), Br.No.348 (11 spans), Br.No.320 (05 spans), Br.No.326 (04 spans), Br.No.318 (03 spans) & VBr.No.321 (05 spans) with grade M-30 on Main line in Patna-Mughalsarai section under Sr.DEN/3/Danapur. | Open | 03.01.20 | Single | 27.01.20 | 2 | 1.M/s Sharp Enterpies 2.Sunil Kumar
| Nil | Yes | DNR DIVN Engg W7etender18open dnr 19-20-14/ 0892140021905dt. 10.07.2020. | M/s Sharp Enterprises | 5,87,24,284.30 | 09.06.21 | W-7/E-Tender./18 /Open/ DNR /2019-20 dt.03.01.20. | (1) Through Ballast Renewal of turnouts 92 nos = 9.20 Km (2)Throgh Ballast Renewal in Km UP line 593.7 - 601.7 = 8.0 Km, DN Line 610.0 - 613.5 = 3.5 Km, BXR COMMOM LOOP = 0.75 Km, BWH UP LOOP= 0.75 Km, ZNA DN LOOP = 0.725 Km, DHA UP LOOP = 0.735 Km, ZNA UP LOOP= 0.7Km, CSA UP LOOP= 0.65 Km, PWS DN LOOP= 0.75 km, DNR DN LOOP= 0.75 km, DNR DN LOOPLINE NO.3 = 0.75 km, KUA UP LOOP = 0.75 km, KUA DN LOOP = 0.75 km, BTA UP LOOP= 0.75 km Total TBR =20.31 Km and (3)TRR/P =2.3 Km (UP Line 658.0 - 660.3 = 2.3 Km) under Sr.DEN/3/DNR section.. | Open | 03.01.20 | Single | 27.01.20 | 1 | Rakesh Construction
| Nil | Yes | DNR DIVN Engg W7etender18open dnr 19-20-16/ 0932230022275dt. 17.07.2020. | Rakesh Construction | 2,26,00,811.73 | 16.07.21 | | | | | | | | | | sd/- Sr.Divnl.Engineer(Co-ordn.), E.C.Railway,Danapur. | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
East Central Railway | CivilEngineering Deptt.Danapur Division. | Details of contracts concluded during the month of Rs. Above 01 Crore (from 01/06/2020 to 30/06/2020). | | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | Tender No. | Item Nature of work | Mode of tender Inquty | Date of publication of NIT | Types of bidding (single two-Bid system) | Last date of receipt of tender | Nos. of tender received | Nos.& names of parties qualified after technial evaluation | Nos.& names of parties not qualified after technial evaluation | Whether contract awrded to lowest tenderer Evaluated of | Contract No. & date | Name of Contractor | Value of Contract | Scheduled date of completion of supplies | W-7/E-Tender./02 /Open/ DNR /2020-21 dt.22.04.20. | JAJ-PNBE:Deep screening of Track (by BCM or manual) in UP line Km. from 483.1 to 498.14 =15.04 Km., 498.14 to 512.1=13.96Km., DN line Km.from 453.60 to 457.7=4.1 Km., 462.5 to 464.50=2Km., 465.12 to 469.5=4.38Km., 470 to 472=2Km., 472.6 to 474.6= 2Km.474.9 to 477.4= 2.5Km., 393 to 398.8=5.8km., 402.5 to 406=3.5km., and JAJ ART line= 0.4Km., JAJ-ARME line= 0.3 Km. JAJ UP OC siding =0.08Km., JAJ DN OC siding =0.1Km., JAJ DN Gathering line =0.42Km., JAJ Engine line= 0.6Km., JAJ Memu shed line 1 & 2 =1.4Km., and JAJ-NPO SID. Line No.123= 0.3Km. (Total Km. =58.88), TSR(P) from DN Km. 419.0 to 421.06= 2.06Km. & UP Km. 423.5 to 432.561=9.061Km., 433.565 to 434.56=0.995Km. & 422.8 to 423.5= 0.7Km.(Total 12.816 Kms.) and TFR Km.from UP line 506 to 512.14=6.14Km., 435.5 to 454=18.5Km. & DN line 460 to 483.2=23.2Km.( Total 47.84 Kms.) and other ancillary/allied work under Sr.DEN/2/DNR section. ). | Open | 22.04.20 | Single | 29.05.20 | 2 | 1.M/s Harisharnam Constn. 2.RDP Constn.
| Nil | Yes | DNR DIVN Engg W7etender02open dnr 20-21-11/ 00926270021159 dt. 29.06.2020. | M/s Harisharnam Constn.
| 4,24,94,292.51 | 28.06.21 | | | | | | | | | | sd/- Sr.Divnl.Engineer(Co-ordn.), E.C.Railway,Danapur. | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
East Central Railway | CivilEngineering Deptt.Danapur Division. | Details of contracts concluded during the month of Rs. Above 01 Crore (from 01/05/2020 to 31/05/2020). | | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | Tender No. | Item Nature of work | Mode of tender Inquty | Date of publication of NIT | Types of bidding (single two-Bid system) | Last date of receipt of tender | Nos. of tender received | Nos.& names of parties qualified after technial evaluation | Nos.& names of parties not qualified after technial evaluation | Whether contract awrded to lowest tenderer Evaluated of | Contract No. & date | Name of Contractor | Value of Contract | Scheduled date of completion of supplies | W-7/E-Tender./18 /Open/ DNR /2019-20 dt.03.01.20. | Provision of Freight Terminal at Dumaraon station in Danapur Division (Balance quantity). | Open | 03.01.20 | Single | 27.01.20 | 2 | 1.M/s Lalmani Traders 2. Shree Kishna Constn.& Contractor LLP
| Nil | Yes | DNR DIVN Engg W7etender18open dnr 19-20-13/ 01098000019018 dt. 12.05.2020. | .M/s Lalmani Traders
| 1,23,53,067.52 | 11.11.20 | W-7/E-Tender./18 / Open/DNR/2019-20 dt. 03.01.20. | Improvement of Septic tank, Soil pipe , sanitary fittings in toilets etc. in service buildings and staff quarters of railway colony under ADEN/HQ/DNR of DNR Division. | Open | 03.01.20 | Single | 27.01.20 | 1 | M/s R.R Enterprises
| Nil | Yes | DNR DIVN Engg W7etender18open dnr 19-20-01/ 00876250019352. dt.20.05.2020. | M/s R.R Enterprises
| 1,73,06,145.55 | 19.10.20 | W-7/E-Tender./21 / Open/DNR/ 2019-20 dt. 14.02.20. | .Repairs to bank in RGD-TiA section for maintaining the LWR ballast profile between Km.20/0 to 23/0 and 26/0 to 29/0 under ADEN/NWD. | Open | 14.02.20 | Single | 11.03.20 | 3 | 1.M/s Rama Shri Sai Constn.Pvt. Ltd. 2. TIO Multi Traders 3. Deo Kumar
| Nil | Yes | DNR DIVN Engg W7etenderopen dnr 19-20-01/ 00833350019444 dt. 22.05.2020. | M/s Rama Shri Sai Constn.Pvt. Ltd.
| 1,15,81,184.27 | 21.05.21 | W-7/E-tender ./21 /Open/ DNR/ 2019-20 dt. 14.02.20. | Warsaliganj- Improvement of Goods wharf and approach road for goods P.F at Warsaliganj in K.G.section under ADEN/NWD. | Open | 14.02.20 | Single | 11.03.20 | 5 | 1.M/s Sunil Kumar 2.Rama Shree Sai Constn.Pvt.Ltd. 3.Sarp Enterprises 4. Vijaya Venture 5.Raj Kishore Singh | Nil | Yes | DNR DIVN Engg W7etender21open dnr 19-20-08/ 00940660019445 dt. 22.05.2020. | M/s Sunil Kumar | 1,21,34,805.71 | 21.09.20 | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | sd/- Sr.Divnl.Engineer(Co-ordn.), E.C.Railway,Danapur. | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | East Central Railway | CivilEngineering Deptt.Danapur Division. | Details of contracts concluded during the month of Rs. Above 01 Crore (from 01/04/2020 to 30/04/2020). | | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | Tender No. | Item Nature of work | Mode of tender Inquty | Date of publication of NIT | Types of bidding (single two-Bid system) | Last date of receipt of tender | Nos. of tender received | Nos.& names of parties qualified after technial evaluation | Nos.& names of parties not qualified after technial evaluation | Whether contract awrded to lowest tenderer Evaluated of | Contract No. & date | Name of Contractor | Value of Contract | Scheduled date of completion of supplies | NIL. | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | sd/- Sr.Divnl.Engineer(Co-ordn.), E.C.Railway,Danapur. | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
East Central Railway | CivilEngineering Deptt.Danapur Division. | Details of contracts concluded during the month of Rs. Above 01 Crore (from 01/03/2020 to 31/03/2020). | | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | Tender No. | Item Nature of work | Mode of tender Inquty | Date of publication of NIT | Types of bidding (single two-Bid system) | Last date of receipt of tender | Nos. of tender received | Nos.& names of parties qualified after technial evaluation | Nos.& names of parties not qualified after technial evaluation | Whether contract awrded to lowest tenderer Evaluated of | Contract No. & date | Name of Contractor | Value of Contract | Scheduled date of completion of supplies | W-7/E-Tender./17 / Open/DNR/2019-20 dt.28.11.19 | PNBE-JAJ section: Complete Track Renewal(CTR/P) from DN line Km. 422.8 to 426.3=3.5 Km., 431.694 to 433=1.306Km., 435,.03 to 436.922= 1.892Km., 441.5 to 443=1.5Km., 455.28 to 459.29=4.62Km., 510.62 to 512=1.4Km., and from UP line Km.421.6 to 422.25=0.65Km. with PQRS and other allied/misc works in Patna –Jhajha section under Sr.DEN/2/DNR(Total 14.868Kms.). | Open | 29.11.19 | Single | 24.12.19 | 2 | 1.M/s Suman Enterprise 2.M/s Harisharnam Constn. | Nil | Yes | DNR DIVN Engg W7etender17open dnr 19-20-3/ 00900260016966 dt. 06.03.2020. | M/s Suman Enterprise | 2,36,96,786.11 | 05.03.21 | W-7/E-Tender./18 / Open/DNR/2019-20 dt. 03.01.20. | Boundary wall/fencing to prevent encroachment on Railway land under ADEN/W/PNBE. | Open | 03.01.20 | Single | 03.01.20 | 2 | 1.M/s Rama Shri Sai Constn.Pvt. Ltd.
2.Deo Kumar
| Nil | Yes | DNR DIVN Engg W7etender18open dnr 19-20-06/ 00833350017213 dt. 12.03.2020. | M/s Rama Shri Sai Constn.Pvt. Ltd. | 1,57,78,966.06 | 11.09.20 | W-7/E-Tender./18 / Open/DNR/2019-20 dt. 03.01.20. | Special repairs to staff qrs. at PNBE & RJPB under ADEN/W/ PNBE. | Open | 03.01.20 | Single | 03.01.20 | 5 | 1.M/s A.S.Builders 2.Shivani Infra Tech.Pvt.Ltd. 3.Rama Shri Sai Constn.Pvt.Ltd. 4.Manish Kumar 5.Deo Kumar | Nil | Yes | DNR DIVN Engg W7etender18open dnr 19-20-05/ 01076650017219 dt. 12.03.2020. | M/s A.S.Builders | 2,27,72,032.91 | 11.10.20 | W-7/E-Tender./18 / Open/DNR/2019-20 dt. 03.01.20. | Construction of Toe wall/Curtain wall for protection of sub-structure of Br.No. 107 in Bakhtiyarpur-Rajgir section of Danapur Division. | Open | 03.01.20 | Single | 03.01.20 | 5 | 1.M/s Rama Shri Sai Constn.Pvt. Ltd. 2.Nandi Pd.Singh 3.Chandrasheker Singh & Co. 4.Deo Kumar 5.Kumar Constn. | Nil | Yes | DNR DIVN Engg W7etender18open dnr 19-20-09/ 00833350017221 dt. 12.03.2020. | M/s Rama Shri Sai Constn.Pvt. Ltd. | 2,96,16,714.79 | 11.02.21 | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | sd/- Sr.Divnl.Engineer(Co-ordn.), E.C.Railway,Danapur. | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
East Central Railway
| CivilEngineering Deptt.Danapur Division. | Details of contracts concluded during the month of Rs. Above 01 Crore (from 01/02/2020 to 29/02/2020). | | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | Tender No. | Item Nature of work | Mode of tender Inquty | Date of publication of NIT | Types of bidding (single two-Bid system) | Last date of receipt of tender | Nos. of tender received | Nos.& names of parties qualified after technial evaluation | Nos.& names of parties not qualified after technial evaluation | Whether contract awrded to lowest tenderer Evaluated of | Contract No. & date | Name of Contractor | Value of Contract | Scheduled date of completion of supplies | W-7/E-Tender./17 / Open/DNR/2019-20 dt.28.11.19 | Replacement of pipe line and sanitary fitting in staff quarters under SSE/W/JAJ & KEU under ADEN/KEU and SSE/W/MKA under ADEN/MKA. | Open | 29.11.19 | Single | 24.12.19 | 3 | 1.Nandi Pd.Singh. 2.Maheshwari Pd.Singh 3.Sea Rock Structure Industries Pvt.Ltd. | Nil | Yes | DNR DIVN Engg W7etender17open dnr 19-20-5/ 00884470015007 dt. 04.02.2020. | Nandi Prasad Singh | 1,51,04,415.08 | 03.08.20 | W-7/E-Tender./14 / Open/DNR/2019-20 dt.16.09.19 | Providion of 1 no. escalator at Barh, 02 nos.at Fatuha stn., 2 nos. at Patna Sahib, 2 nos. at RJPB, 04 nos. at Patna Jn., 2 nos. at DNR stn. & 2 nos. at ARA (Total 15 nos.) of Danapur Division under DEN/HQ/DNR. | Open | 17.09.19 | Single | 15.10.19 | 2 | 1.M/s CRG Nirmal Enterprises 2.Halcons | Nil | Yes | DNR DIVN Engg W7etender14open dnr 19-20-01/ 01536400015170 dt. 06.02.2020. | M/s Shivani Infratech Pvt.Ltd. | 5,79,90,094.96 | 05.10.20 | W-7/E-Tender./17/ Open/DNR/2019-20 dt.28.11.19 | Danapur Division - Replacement of leaky roofs in colonies . | Open | 02.12.19 | Single | 24.12.19 | 7 | 1.M/s Rajiv Ranjan Singh 2.Maheshwari Water Proofing & Developers 3.Abhay Narayan Verma 4.Sea Rock Structure Industries Pvt.Ltd. 5.Nimbark Engg.Pvt.Ltd. 6.Malhi Constn. 7.A.S.Builders. | Nil | Yes | DNR DIVN Engg W7etender16open dnr 19-20-10/ 00954010015283 dt. 07.02.2020. | M/s Rajiv Ranjan Singh | 1,54,16,672.57 | 06.08.20 | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | sd/- Sr.Divnl.Engineer(Co-ordn.), E.C.Railway,Danapur. | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
East Central Railway | CivilEngineering Deptt.Danapur Division. | Details of contracts concluded during the month of Rs. Above 01 Crore (from 01/01/2020 to 31/01/2020). | | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | Tender No. | Item Nature of work | Mode of tender Inquty | Date of publication of NIT | Types of bidding (single two-Bid system) | Last date of receipt of tender | Nos. of tender received | Nos.& names of parties qualified after technial evaluation | Nos.& names of parties not qualified after technial evaluation | Whether contract awrded to lowest tenderer Evaluated of | Contract No. & date | Name of Contractor | Value of Contract | Scheduled date of completion of supplies | W-7/E-Tender./16 / Open/DNR/2019-20 dt.31.10.19 | Provision of boundary wall at Patna, Patna Saheeb (02Kms.) & between RJPB-GZH (UP & DN) at Km.536.0-538.0(4 Km) | Open | 01.11.19 | Single | 25.11.19 | 3 | 1.M/s AS Builders 2.Sunil Kumar 3.Rama Shri Sai Constn. Pvt.Ltd. | Nil | Yes | DNR DIVN Engg W7etender16open dnr 19-20-5/ 01076650013265 dt. 08.01.2020. | M/s AS Builders | 4,37,59,248.23 | 07.07.20 | W-7/E-Tender./16 / Open/DNR/2019-20 dt.31.10.19 | Provision of P.F surfacing an improvement of approach road of BKP-RGD & FUT-IPR section of Danapur Division. | Open | 01.11.19 | Single | 25.11.19 | 3 | 1.M/s Shivani Infratech Pvt.Ltd. 2.Nand Kishore Prasad 3.Manoj Kumar Sinha | Nil | Yes | DNR DIVN Engg W7etender16open dnr 19-20-9/ 01367330013273 dt. 08.01.2020. | M/s Shivani Infratech Pvt.Ltd. | 1,73,83,764.93 | 07.09.20 | W-7/E-Tender./16 / Open/DNR/2019-20 dt.31.10.19 | Improvement of Divnl. Traning school for mechanical (C&W) staff at RNCC Depot of DNR Din. | Open | 01.11.19 | Single | 25.11.19 | 2 | 1.Bhola Prasad 2.Rama Shri Sai Constn. Pvt.Ltd. | Nil | Yes | DNR DIVN Engg W7etender16open dnr 19-20-4/ 00843910013651 dt. 14.01.2020. | Bhola Prasad | 1,05,30,637.33 | 13.07.20 | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | sd/-
Sr.Divnl.Engineer(Co-ordn.), E.C.Railway,Danapur.
| | | | | | | | | | | . | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| |
CivilEngineering Deptt.Danapur Division. | Details of contracts concluded during the month of Rs. Above 01 Crore (from 01/12/2019 to 31/12/2019). | | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | Tender No. | Item Nature of work | Mode of tender Inquty | Date of publication of NIT | Types of bidding (single two-Bid system) | Last date of receipt of tender | Nos. of tender received | Nos.& names of parties qualified after technial evaluation | Nos.& names of parties not qualified after technial evaluation | Whether contract awrded to lowest tenderer Evaluated of | Contract No. & date | Name of Contractor | Value of Contract | Scheduled date of completion of supplies | W-7/E-Tender./15 / Open/DNR/2019-20 dt. 16.10.19 | Provision of 04 nos. 2bay P.F.shed an 2nd class waiting hall at PF No.1 at Patliputra station under SSE/W/ Patliputra. | Open | 16.10.19 | Single | 11.11.19 | 10 | 1.M/s Bhola Prasad 2. S.H.Associate 3. Lakshay Constn. 4. Vijay Ventures 5.M/s Vijay Constn. 6. Baba Baidhyanath Const 7.Koilwan Constn. 8.Ashiyana Constn. 9.Brajesh Kumar 10.Arya Ebnterprises
| Nil | Yes | DNR DIVN Engg W7etender15open dnr 19-20-3/ 00843910011108 dt. 04.12.19. | 1.M/s Bhola Prasad
| 1,04,71,799.01 | 03.08.20 | W-7/E-Tender./15 / Open/DNR/2019-20 dt. 16.10.19 | Improvement of Officer's Rest House and Club at Danapur | Open | 16.10.19 | Single | 11.11.19 | 3 | 1. Rajiv Kuimar 2. Bhola Prasad 3. M/s Vijay Constn. | Nil | Yes | DNR DIVN Engg W7etender15open dnr 19-20-4/ 00818740012305 dt. 23.12.19. | Rajiv Kumar | 1,32,37,676.50 | 22.05.20 | W-7/E-Tender./16 / Open/DNR/2019-20 dt. 31.10.19 | Provision of Lifts 08 nos. (02 DNR, 02PPTA, 02 RJPB & 02 MKA) in Danapur Division. | Open | 31.10.19 | Single | 25.11.19 | 2 | 1.A.S.Builders 2. M/s Roy Constn. | Nil | Yes | DNR DIVN Engg W7etender16open dnr 19-20-6/ 01076650012417 dt. 24.12.19. | A.S.Builders | 2,98,34,761.62 | 23.10.20 | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | sd/- Sr.Divnl.Engineer(Co-ordn.), E.C.Railway,Danapur. | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| |
CivilEngineering Deptt.Danapur Division. | Details of contracts concluded during the month of Rs. Above 01 Crore (from 01/11/2019 to 30/11/2019). | | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | Tender No. | Item Nature of work | Mode of tender Inquty | Date of publication of NIT | Types of bidding (single two-Bid system) | Last date of receipt of tender | Nos. of tender received | Nos.& names of parties qualified after technial evaluation | Nos.& names of parties not qualified after technial evaluation | Whether contract awrded to lowest tenderer Evaluated of | Contract No. & date | Name of Contractor | Value of Contract | Scheduled date of completion of supplies | W-7/E-Tender./14 / Open/DNR/2019-20 dt.16.09.19 | Improvement of drain in Neora, Lanka, Medical, East Colony and Officer’s Colony of Railway quarters at Danapur. | Open | 17.09.19 | Single | 15.10.19 | 5 | 1.M/s Sunil Kumar 2.AS Builders 3.Constn. & Constn. 4.R.K.Singh 5.Nageshwar Prasad | Nil | Yes | DNR DIVN Engg W7etender14open dnr 19-20-2/ 00940660010339 dt. 22.11.19. | M/s Sunil Kumar | 6,64,67,737.11 | 21.11.20 | W-7/E-Tender./09 / Open/DNR/2019-20 dt. 16.07.19. | Patna-DDU:-Provision of boundary wall to prevent encroachment of along the track in PNBE-DDU section(10Km). | Open | 17.07.19 | Single | 13.08.19 | 3 | 1.M/s A.S. Builders 2.Narendra Kumar 3.Sunil Kumar | Nil | Yes | DNR DIVN Engg W7etender09open dnr 19-20-5/ 0106650010475 dt. 25.11.19. | M/s A.S. Builders | 7,55,50,129.00 | 24.11.20 | | | | | | | | | sd/- Sr.Divnl.Engineer(Co-ordn.), E.C.Railway,Danapur.
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
Sr.Divnl.Engineer(Co-ordn.), E.C.Railway,Danapur. | | | | | | | | | | | |

East Central Railway | CivilEngineering Deptt.Danapur Division. | Details of contracts concluded during the month of Rs. Above 01 Crore (from 01/10/2019 to 31/10/2019). | | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | Tender No. | Item Nature of work | Mode of tender Inquty | Date of publication of NIT | Types of bidding (single two-Bid system) | Last date of receipt of tender | Nos. of tender received | Nos.& names of parties qualified after technial evaluation | Nos.& names of parties not qualified after technial evaluation | Whether contract awrded to lowest tenderer Evaluated of | Contract No. & date | Name of Contractor | Value of Contract | Scheduled date of completion of supplies | W-7/E-Tender./07 / Open/DNR/2019-20 dt. 23.05.19 | Construction of 04 unit type II, 02 unit Type III, 01 unit type IV quarter at Rajgir, 04 unit type II, 02 unit type III quarter at Biharshariff under Sr.DEN/1/DNR section.. | Open | 24.05.19 | Single | 18.06.19 | 1 | M/s Rama Shri Sai Construction. | Nil | Yes | DNR DIVN Engg W7etender07open dnr 19-20-4/ 00833350007490 dt. 03.10.19. | M/s Rama Shri Sai Construction. | 1,32,93,754.87 | 02.04.20 | W-7/E-Tender./11 / Open/DNR/2019-20 dt. 06.08.19. | JAJ & KEU: Construction of 30 beds new running room at JAJ and 30 bed running room at Kiul station under ADEN/KEU | Open | 08.08.19 | Single | 02.09.19 | 3 | 1.M/s Brajesh Kumar 2.Nandi Prasad Singh 3. R.R.Enterprises | Nil | Yes | DNR DIVN Engg W7etender11open dnr 19-20-9/ 01043190008230 dt. 17.10.19. | M/s Brajesh Kumar | 1,77,57,871.20 | 16.08.20 | | | | | | | | | sd/- Sr.Divnl.Engineer(Co-ordn.), E.C.Railway,Danapur.
| |

East Central Railway | CivilEngineering Deptt.Danapur Division. | Details of contracts concluded during the month of Rs. Above 01 Crore (from 01/09/2019 to 30/09/2019). | | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | Tender No. | Item Nature of work | Mode of tender Inquty | Date of publication of NIT | Types of bidding (single two-Bid system) | Last date of receipt of tender | Nos. of tender received | Nos.& names of parties qualified after technial evaluation | Nos.& names of parties not qualified after technial evaluation | Whether contract awrded to lowest tenderer Evaluated of | Contract No. & date | Name of Contractor | Value of Contract | Scheduled date of completion of supplies | W-7/E-Tender./05 / Open/DNR/2019-20 dt. 07.05.19 | Construction of 01 High level platform (24 coaches length) at Danapur Station.. | Open | 07.05.19 | Single | 03.06.19 | 1 | M/s Nevilal Rohita Contrators Pvt.Ltd. | Nil | Yes | DNR DIVN Engg W7etender05open dnr 19-20-1/ 01268770005860 dt. 02.09.19 | M/s Nevilal Rohita Contrators Pvt.Ltd. | 2,42,55,391.79 | 01.07.20 | | | | | | | | | sd/- Sr.Divnl.Engineer(Co-ordn.), E.C.Railway,Danapur.
| |

East Central Railway | CivilEngineering Deptt.Danapur Division. | Details of contracts concluded during the month of Rs. Above 01 Crore (from 01/08/2019 to 31/08/2019). | | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | Tender No. | Item Nature of work | Mode of tender Inquty | Date of publication of NIT | Types of bidding (single two-Bid system) | Last date of receipt of tender | Nos. of tender received | Nos.& names of parties qualified after technial evaluation | Nos.& names of parties not qualified after technial evaluation | Whether contract awrded to lowest tenderer Evaluated of | Contract No. & date | Name of Contractor | Value of Contract | Scheduled date of completion of supplies | W-7/E-Tender./04 / Open/DNR/2019-20 dt. 06.05.19 | Supplying and stacking of 74000 cum of machine crushed track ballast 50mm size from recognized quarry conforming to RDSO’s specification for track ballast in stack measurement and loading the same into any type of Railway Wagon at Jhajha Ballast siding and ancillary work of development of Jhajha Ballast siding under Danapur Division | Open | 04.05.19 | Two Bid system | 30.05.19 | 2 | 1.M/s Jyoti Constn. And Engg. Pvt. Ltd. 2.Gladiolus Constn.Pvt.Ltd. | Gladiolus Constn. Pvt.Ltd. | Yes | DNR DIVN Engg W7etender04open dnr 19-20-1/ 10114650004429 dt. 03.08.19 | M/s Jyoti Constn. And Engg. Pvt. Ltd. | 17,48,03,431.33 | 02.08.21 | W-7/E-Tender./07 / Open/DNR/2019-20 dt. 23.05.19 | House keeping and maintenance of Officers Rest House Complex subordinate rest house & club complex at RJPB, MHX, PNBE ,DNR & Dighaghat under ADEN/W/PNBE. | Open | 23.05.19 | Single | 18.06.19 | 3 | 1.M/s Prim Services 2.Gladiolus Constn.Pvt.Ltd. 3.Singh Services | Singh Services | 2nd Lowest tenderer. | DNR DIVN Engg W7etender07/open dnr 19-20-1 10113170005079 dt. 16.08.19 | M/s Prim Services | 4,49,29,225.84 | 15.08.21 | W-7/E-Tender./08 / Open/DNR/2019-20 dt.21.06.19 | Deep screening of Track (by BCM or manual) and TFR along with other anciallary works in FUT-IPR Section under ADEN/RGD. | Open | 21.06.19 | Single | 17.07.19 | 1 | M/s Hari Sharnam Constn. | Nil | Yes | DNR DIVN Engg/ W-7Etender08/dnr- Sr.DEN-05/ 00926270005667 dt. 30.08.19 | M/s Hari Sharnam Constn. | 2,77,89,847.91 | 27.05.20 | W-7/E-Tender./08 / Open/DNR/2019-20 dt.21.06.19 | Interlocking of level crossing No.47, 52, 59, 60, 61 & 65 (06 Nos.) under Sr. DEN/2/DNR section in Danapur Division. | Open | 21.06.19 | Single | 17.07.19 | 1 | M/s Vijay Kumar | Nil | Yes | DNR DIVN Engg/ W-7Etender08/Open dnr 19-20-3/ 10037160005787 dt. 30.08.19 | M/s Vijay Kumar | 1,12,44,210.44 | 29.08.20 | | | | | | | | | sd/- Sr.Divnl.Engineer(Co-ordn.), E.C.Railway,Danapur. | |

East Central Railway | CivilEngineering Deptt.Danapur Division. | Details of contracts concluded during the month of Rs. Above 01 Crore (from 01/07/2019 to 31/07/2019). | | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | Tender No. | Item Nature of work | Mode of tender Inquty | Date of publication of NIT | Types of bidding (single two-Bid system) | Last date of receipt of tender | Nos. of tender received | Nos.& names of parties qualified after technial evaluation | Nos.& names of parties not qualified after technial evaluation | Whether contract awrded to lowest tenderer Evaluated of | Contract No. & date | Name of Contractor | Value of Contract | Scheduled date of completion of supplies | W-7/E-Tender./02 / Open/DNR/2019-20 dt. 08.04.19 | Improvement of P.F.surface at P.F No. 10 by providing granite, renovation of other passenger amenities in Karbigahiya side at Patna Jn. under ADEN/Works/Patna.. | Open | 9.04.19 | Single | 01.05.19 | 13 | 1.M/s Miku and Miky Infratech 2.Rama Shri Sai Constn. Pvt.Ltd. 3. Halcons 4.Amit Kr.Singh 5.Vaishnavi Constn. 6.Navilal Rohita Constn. Pvt.Ltd. 7.Ashiyana Constn. 8.Sudesh Kr.Singh & Constn. Pvt.Ltd. 9.Anek Constn. 10.S.H.Associates 11.Ganesh Kumar 12. Niranjan Kumar 13.A.S.Builders | Nil | Yes | DNR DIVN Engg W7etender02/open dnr 19-20-2 01297860003008 dt. 04.07.19 | M/s Miku and Miky Infratech | 1,25,68,669.12 | 03.11.19 | W-7/E-Tender./55 / Open/DNR/2018-19 dt. 14.03.19 | Provision of Cover shed on P.F No.1, 2-3 atPatliputra station under ADEN/Works/PNBE. | Open | 14.03.19 | Single | 05.04.19 | 5 | 1.M/s The Lattice Interiors 2.Sunil Kumar 3.Trans India & Co. 4. Rajniti Pd.Singh 5.A.S.Builders. | Nil | Yes | DNR DIVN Engg W7etender55/open dnr 18-19-1 01362560003354 dt. 12.07.19 | M/s The Lattice Interiors | 4,15,36497.93 | 11.01.20 | W-7/E-Tender./05 / Open/DNR/2019-20 dt. 07.05.19 | Maintenance & repair work of Patliputra Rail Parisar and other miscellaneous /left over works for three (03)years under ADEN/W/ Patna. | Open | 07.05.19 | Single | 03.06.19 | 2 | 1. Ganesh Kumar 2. A.S.Builders. | Nil | Yes | DNR DIVN Engg W7etender05/open dnr 19-20-4 10114770003385 dt. 12.07.19 | M/s Ganesh Kumar | 5,49,08,876.31 | 11.07.22 | W-7/E-Tender./02 / Open/DNR/2019-20 dt. 08.04.19 | Electrification of Dildarnagar- Tarighat section of Danapur Division (18.67 RKm & 20 TKm.). | Open | 09.04.19 | Single | 01.05.19 | 2 | 1. Jannat Builders Pvt.Ltd. 2.Nand Kishore Prasad | Nil | Yes | DNR DIVN Engg W7etender02/open dnr 19-20-1 01172450004160 dt. 30.07.19 | Jannat Builders Pvt.Ltd. | 2,13,99,702.52 | 29.03.20 | W-7/E-Tender./07 / Open/DNR/2019-20 dt. 23.05.19. | Construction of type IV Quarter 05 unit at PNBE under ADEN/Works/PNBE. | Open | 23.05.19 | Single | 18.06.19 | 3 | 1.Rama Shri Sai Constn.Pvt.Ltd. 2.Mikyand Miky Infratech Pvt.Ltd. 3.R.K.Singh | Nil | Yes | DNR DIVN Engg W7etender07/open dnr 19-20-2 01297860004205 dt. 30.07.19 | M/s Miku and Miky Infratech | 1,65,05,506.57 | 29.01.20 | | | | | | | | | | | | | | | | | | | | | | | Sd/- Sr.Divnl.Engineer(Co-ordn.), E.C.Railway,Danapur. | |
East Central Railway | CivilEngineering Deptt.Danapur Division. | Details of contracts concluded during the month of Rs. Above 01 Crore (from 01/06/2019 to 30/06/2019). | | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | Tender No. | Item Nature of work | Mode of tender Inquty | Date of publication of NIT | Types of bidding (single two-Bid system) | Last date of receipt of tender | Nos. of tender received | Nos.& names of parties qualified after technial evaluation | Nos.& names of parties not qualified after technial evaluation | Whether contract awrded to lowest tenderer Evaluated of | Contract No. & date | Name of Contractor | Value of Contract | Scheduled date of completion of supplies | NI L | | | | | | | | | | | | | | | | | | | | | | | sd/- Sr.Divnl.Engineer(Co-ordn.), East Central Railway, Danapur.
| | | | | | | | | | | | |
|
|
| | |