inner-banner-img

our-division


Mechanical


Mechanical

 

MECHANICAL (C&W)
 

Major Work Station under

1.      Divisional Office at Danapur.

2.      Rajendra Nagar Coaching Complex.

3.       PNBE/H-Park Coaching Depot.

4.       Danapur Coaching Depot.

5        Rajgir Coaching Depot.

6.       Ara Coaching Depot.

7.        Train passing & enroute watering at PNBE.

8.         ART & SPART at DNR

9.         ART at JAJ.



 
GENERAL INFORMATION
 

Sl. No.

Name of Officer

Designation

01

Pushkar Kumar

Sr. DME(Co-ord)

02

Manish Kumar

Sr. CDO/RNCC

03

Adarsh Kumar

DME/RNCC

04

Anil Kumar

CDO/DNR

05

Vinay Kumar

DEnHM/DNR 

06

Jayant Raj Saurav

AME/RNCC

07

Vidya Shanker Sinha

AME(Chg. Depot)/ARA

08

Sudhir Kumar Jha

AME/RGD

 
                                                                                                 CHAPTER-2

ACTIVITIES

2.1     COACHING ACTIVITIES-

(i)       Primary Maintenance of trains

              04 No. Vande Bharat Exp, 01 no Namo Bharat & 01 no. Amrit Bharat  started

Sl No

Train no

Type of Train

W.E.F

From

To

PM Depot

01

22349/50

Vande Bharat

28-06-23

PNBE

RNC

RNCC

02

22347/48

Vande Bharat

26-09-23

PNBE

HWH

RNCC

03

22345/46

Vande Bharat

18-03-24

PNBE

GTNR

RNCC

04

94804/03

Namo Bharat

25-04-25

PNBE

JYG

RNCC

05

22361/62

Amrit Bharat

31-07-25

RJPB

NDLS

RNCC

06

26301/02

Vande Bharat

17-09-25

DNR

JBN

DNR

 

There are Five coaching depots located over Danapur Division, Harding Park/Patna Jn., Rajendra Nagar Coaching Complex, Danapur, ARA and Rajgir with a total coach holding of 1656 coaches. Primary maintenance of total 29 trains in 47 rakes ( Except Vande Bharat Exp & Namo Bharat Exp) is being given in these five depots. 

The details are listed below:

 

Depot

No. of Trains

No. of Rakes

No. of coach/day

LHB

ICF

RNCC

15 + 02*

20 + 04*

00

188 + 29*

DNR

06 + 03*

08 +01*

01+ 06*

80 + 33*

RGD

03

07

02

58

ARA

04

08

00

57

PNBE

01

0

01

08

TOTAL

29 +05*

43 + 05*

04 + 6*

391 + 62*

Holding

 

1656

Physical Holding

LHB - 1133, ICF - 280

1413

 

 

Name of Depot

Coach Holding( Physical)

Break Up

ICF +LHB

Bare

Spare

RNCC

583

LHB-583

523

64

DNR

413

ICF- 204 , LHB- 209

350

40

RGD

220

ICF- 52, LHB – 168

202

24

ARA

173

LHB – 173

174

21

PNBE

24

ICF - 24

20

03

Total

1413

LHB- 1133, ICF- 280

1269

152

Note: Excluding Secondary maintained trains.

 

 

Brake UP ofBooked Holding of DNR division as on 01-05-2026

Stock

LHB

ICF

Total

Total

Holding

AC

NAC

AC

NAC

AC

NAC

LHB

ICF

RNCC

335

302

0

0

335

302

637

0

637

DNR

61

164

36

163

97

327

225

199

424

RGD

94

92

8

73

102

165

186

81

267

ARA

95

128

0

0

95

128

223

0

223

PNBE

0

0

29

76

29

76

0

105

105

Total

585

686

73

312

658

998

1271

385

1656

 

Brake UP ofPhysical Holding of DNR division as on 01-05-2026

Stock

LHB

ICF

Total

Total

Holding

AC

NAC

AC

NAC

AC

NAC

LHB

ICF

RNCC

302

281

0

0

302

281

583

0

583

DNR

60

149

48

156

108

305

209

204

413

RGD

85

83

0

52

85

135

168

52

220

ARA

73

100

0

0

73

100

173

0

173

PNBE

0

0

2

22

2

22

0

24

24

Total

520

613

50

230

570

843

1133

280

1413

 

Holding:(ii)Secondary Maintenance of trains.

              Secondary maintenance of 06 long distance/Super fast trains is being done in coaching depot at PNBE & DNR. The details are as below

 

Depot

No. of Trains

No. of coach/day

PNBE

4

19

DNR

2

25

TOTAL

6

44

(iii)Turn round attention.

             As per Railway Board’s Policy Circular No.4, item-3 total of 104 short distance Mail/Express and Passenger Trains are being given Turn Round attention. The details are as below:

 

Depot

No. of Trains

No. of coach/day

PNBE

40

450

RNCC

5

55

DNR

8

130

PPTA

9

119

MKA

1

12

JAJ

1

16

RGD

11

170

IPR

3

60

KEU

14

159

ARA

4

46

BXR

9

103

TOTAL

105

1320

(iv)Enroute watering of trains.

After Rationalisation, Patna Jn. Is the only station where watering in all the 80 nominated through trains are being done.

Depot

No. of Trains

Average No. of coach/day

PNBE

80

1110

TOTAL

80

1110

(b)Rolling – in Examination.

After Rationalization, Patna Jn. Is the only En-route examination point, where all the through and terminating trains are given Rolling-in examination. At DNR, RJPB,PPTA, KEU MKA, JAJ, IPR, ARAand RGD only terminating trains are given Rolling-in examination.

Patna Jn. is the en-route examination point in Danapur where all the through and terminating trains are given Rolling-in examination. At DNR, RJPB,PPTA, KEU MKA, JAJ, IPR, ARAand RGD only terminating trains are given Rolling-in examination.

 

Depot

No. of Trains

PNBE

Enroute train passing/ Through passing trains (As per Rake link)

86

Terminating/Originating//Passing

38

RJPB

22

DNR

08

PPTA

25

MKA

1

ARA

4

RGD

11

IPR

3

KEU

14

TOTAL

 

212

 

Depot: RNCC: MEGA

DNR: Medium

RGD: Minor

ARA : Minor

 

INFRASTUCTURE AVAILABILE.

 

RNCC

Pit-1

Length- 514.5 m with catwalk.Present Capacity- ICF - 24 coach, LHB- 21 coach with OHE

Pit-2

Length- 550 m with catwalk.Capacity - ICF - 25 coach, LHB- 23 coach with OHE

Pit-3

Length- 550 m with catwalk.Capacity - ICF -25 coach, LHB- 23 coach

Pit-4

Length- 535 m with catwalk.Capacity - ICF - 25 coach, LHB- 22 coach

Pit-5(LHB PIT covered shed)

Length- 490 m with catwalk.Capacity - ICF - 22 coach-, LHB- 20 coach woth OHE

Sick line

2 lines under covered shed of 4 coach berthing in each line

DNR

Pit-1

Length- 550 m with catwalk Capacity - ICF - 25 coach, LHB- 23 coachwoth OHE

Pit-2

Length- 550 m with catwalk (Only North Side). Capacity - ICF - 25 coach, LHB- 23 coach

Pit-3

Length- 550 m with catwalk.Capacity - ICF - 25 coach, LHB- 23 coach

Stabling

One of 24 coach length without any maintenance facilities.

Sick line

One line under covered shed for 3 coach berthing 

PNBE

Pit-1

Length- 550 m with catwalk. (Partial catwalk on only North side) .Capacity - ICF - 25 coach, LHB- 23 coach

Pit-2

Length- 337 m without cat walk. Capacity - ICF - 15 coach, LHB- 14 coach

Sick Line

Nil

MKA

Pit

Nil

Stabling

One of 18 coach length without maintenance facilities.

RGD

Pit

Length- 550 m with catwalk.Capacity - ICF - 25 coach, LHB- 23 coach

Sick line

02 line under covered shed, 04 coach berthing, presently one line in working.

ARA

Pit

One Pit of 25 coach length with catwalk.

Sick line

Under Construction

 

2.3 FREIGHT ACTIVITIES –

Flying gangs cum break down gangs have been stationed at JAJ, PNBE, MKA, ARA and DNR for attending to brake binding and minor defects at road side stations.

2.4        Requirementof Man Power with respect to Holding:

 

Year

Holding of DNR Div

Man Power Required

Sanction Strength

Men On Roll

2017-18

1186

1985

1411

1260

2018-19

1215

1972

1395

1259

2019-20

1355

1978

1431

1320

2020-21

1398

1972

1445

1320

2021-22

1396

1982

1445

1305

2022-23

1501

1986

1445

1301

2023-24

1474

2276

1412

1280

2024-25

1442

2135

1328

1262

2025-26

1525

2352

1517

1327

2.5  Staff:

 

Depot

Sanction

MOR

Shortfall w.r.t Sanction

On Roll

Supervisor

Staff

Ministerial staff

Group C

Group D

Group C

RNCC

554

515

39

74

335

94

12

DNR

301

311

-10

45

188

73

5

RGD

124

78

46

12

38

27

1

PNBE

209

159

50

26

86

43

4

MKA

32

24

8

1

10

12

1

KEU

29

20

09

2

9

10

0

JAJ

36

26

10

3

17

5

1

BXR

9

3

6

0

3

0

0

IPR

12

10

2

1

3

6

0

PPTA

33

32

01

3

19

09

1

ARA

107

87

20

14

47

25

1

Div. office

26

25

1

6

1

4

14

EnHM

45

37

8

26 ( SSE/JE-07, CHI/HI – 19)

0

1

10

Total

1517

1327

190

213(SSE/JE-194, CHI/HI – 19)

756

309

50

URL: DNR Holding as on 01-05-2026.pdf
 
 
Performance with respect to Target:-

Parameter

Target

26- 27

24-25

25-26 

26-27     ( Apr’26)

Remarks

Coach

Ineffective % AC Coaches (including Workshop)

6

5.4

6.6

7.13

Increase in Arising of Coaches

Ineffective % NAC Coaches (including Workshop)

5

3.1

4.8

4.46

Increase in Arising of Coaches

IOH/Month

50

53

47

66

 

Punctuality loss Direct cases per year

38

390

397

47

-

Punctuality loss Total cases per year

-

639

644

71

-

Enroute detachment per year (Territorial basis)

Nil

04

02

00

-

Enroute detachment per year (Ownership basis)

Nil

01

03

00

-

Secondary detachment (Territorial basis) Other railway coaches in our division.

20

102

68

06

Prim Spg- – 01, Yaw Damper bracket- 01, PTB/BC defective-01, Compressor- 02, less cooling- 01

Secondary detachment (Ownership basis)

16

64

56

03

Prim Spg- – 01, Compressor- 01, less cooling- 01

Condemnation of coaches

68

16

48

-

 

Ferrous scrap to stores

50MT

117.15 MT

194.22 MT

21.52 MT

 

Freight

Enroute Detachment (Excluding Hot Axle )

1

01

00

01

 

Poor Brake Power

NIL

00

00

00

 

Train Parting

2

00

00

00

 

Spring Breakage

0

00

00

00

 

Hot Axle

1

04

06

00

Other Rly Wagons

Wagon ineffective %

0

00

00

00

No Holding


Note:- Punctuality loss includes cases of Mech (ICF/LHB), MEMU and TL/AC cases 

 

Primary Maintained Trains of DNR Division

S.N.

Depot

Train No.

Train Name

No . Of Rakes

Arrival/ Departure

Frequency

Pit Occupancy Time

Load Detail

Train Composition

1

RNCC

94804

Namo Bharat Rapid Rail

1

A- 10.30

Exc. Saturday

11.30 – 16.30

16 = 32

VMDTC-02, VMMC-08, VMTC-04, VMNDTC-02

94803

D-18.05

2

22349

Vande Bharat Exp ( PNBE – RNC)

1

A- 22.05

Exc. Tuesday

23.00 – 05.00

8 = 16

DTC- 02, TC – 02, MC-04

22350

D-07.00

3

22348

Vande Bharat Exp ( PNBE – HWH)

1

D- 08.00

Exc. Wednesday

23.30 – 05.30

20 = 40

TSDTC-2,
TSNDTC-2,
TSMC-10,
TSNDTCCC-01,
TSTC-5

22347

A-22.40

4

22345

Vande Bharat Exp ( PNBE – GTNR)

1

D- 06.05

Exc. Friday

00.30 – 05.30

8 = 16

DTC- 02, TC – 02, MC-04

22346

A-23.45

5

22361

Amrit Bharat Exp ( RJPB- NDLS)

2

D- 19.45

Daily

12.30 – 18.30

22 = 44

LSLRDPP-2, LWSPP-11, LWSCNPP-08 , LWCBACPP-1

22362

A-11.45

6

12310

New Delhi Tejas Rajdhani Express

2

A-    05:15

Daily

08.00 – 14.00

21=42

LWLRRM –02, LWFAC – 02, LWACCW- 05, LWACCN – 11, LWCBAC -01

12309

D – 19:10

7

12394

Sampoorna Kranti Express

2

A – 07:20

Daily

10.00 – 16.00

22 = 44

LWLRRM –01, LWFAC – 01, LWACCW- 02, LWACCN – 05, LWACCNE -1, LWSCN -06,LS-3/LS-5 – 04, LWCBAC -01, LSLRD - 01

12393

D – 19:25

8

12356

Archana Express

1

A – 20.45 (Mon & Thu)

Bi –Weekly ( Tues & Sat)

22.30 – 04.30

22 = 44

LWLRRM –01, LWFAC – 01, LWACCW- 02, LWACCN – 05, LWACCNE -1, LWSCN -06, LS-3/LS-5 – 04, LWCBAC -01, LSLRD - 01

12355

D – 07.30 (Tue & Sat)

9

12396

Ziyarat Express

1

A – 23:10 (Fri)

Weekly( Wed.)

07.00 – 13.00

22 = 44

LWLRRM –02, LWFAC – 01, LWACCW- 02, LWACCN – 05, LWSCN–06, LWACCNE -1, LS-3/LS-5 – 04, LWCBAC -01

12395

D – 17:55 (Wed)

10

13281

Tinsukia Express

A – 13:45 (Tue)

Weekly( Sat.)

07.00 – 13.00

13282

D – 15:05 (Sat)

11

22360

CSMT Suvidha Express

2

A – 13:40 (Wed & Sat)

Bi –Weekly ( Sun & Wed)

22.30 – 04.30

22 = 44

LWLRRM – 01, LWFAC- 01, LWACCW- 02, LWACCN – 05, LWACCNE-01, LWSCN – 06, LWCBAC -01, LS-5 - 04, LSLRD - 01

22359

D – 13:05 (Sun & Wed)

12

13251

PNBE - ANVT Express

A – 18.35 (Tur & Thu)

Bi –Weekly ( Sun & Thu)

10.00 - 16.30

13252

D – 22.20 (Sun & Thu)

13

22354

PNBE – BAND Humsafar Exp

1

A – 10:10 (Tue)

Weekly( Thurs.)

06.30 – 12.30

21 = 42

LWLRRM – 02, LWACCN - 18, LWCBAC -01

22353

D – 20.25 (Thu)

14

13237/39

Kota Exp

3

A – 19:30

Daily

00.00 – 06.00

22 = 44

LWLRRM –01, LWFAC – 01, LWACCW- 02, LWACCN – 05, LWACCNE -1, LWSCN -06, LS-3/LS-5 – 04, LWCBAC -01, LSLRD - 01

13238/40

D – 11:45

15

13241

Banka Exp

1

A – 16:10

Except Friday

16.30 – 22.30

21 = 42

LWLRRM – 01, LWFAC – 01, LWACCW- 02, LWACCN – 05, LWACCNE-1, LWSCN – 06, LS-3/LS-5–04, LSLRD - 01

13242

D – 23:56

16

13229

RJPB Godda Exp

A- 16.05

Weekly( Fri.)

13230

D – 22.15

17

12351

Howrah Exp

2

A – 06:00

Daily

07.00 – 13.00

22 = 44

LWLRRM – 01, LWFAC – 01, LWACCW- 02, LWACCN – 07,  LWSCN – 06, LS-3/LS-5–04, LSLRD - 01

12352

D – 21:10

18

13227

RJPB-SHC Exp

1

A – 19:30

Daily

22.00 – 04.00

21 = 42

LWLRRM – 01, LWSCZAC- 01, LWSCZ – 10,LS-3/LS-5–08,LSLRD - 01

13228

D – 07:15

19

12023

Howrah Jansatabdi

2

A – 22:20

Except Sunday

23.00 – 05.00

22 = 44

LWLRRM – 01, LWSCZAC- 03, LWSCZ – 17,LSLRD - 01

12024

D – 05:30

20

12366

Ranchi Janshatabdi

A – 22:19

Daily

12365

D – 06:10

21

DNR

26302

Vande Bharat Exp ( DNR – JBN)

1

A- 11.30

Exc. Tuesday

12.30 – 04.30

8 = 16

DTC- 02, TC – 02, MC-04

26301

D- 17.10

22

13258

Jan Sadharan

2

A- 07.15

Daily

08.00 – 14.00

22 = 44

LWLRRM – 01,LS-3/LS-5- 20,LSLRD – 01

13257

D – 15.55

23

22356

PPTA – CDG Express

1

A – 18.30 (Fri & Tues)

Bi – Weekly

07.00 – 13.00

22 = 44

LWLRRM –01, LWFAC – 01, LWACCW- 02, LWACCN – 05, LWACCNE -1, LWSCN -06, LS-3/LS-5 – 04, LWCBAC -01, LSLRD - 01

22355

D – 20.35(PPTA) (Sun & Wed)

24

13235

DNR – SBG Intercity

2

A – 23.45

Except Sunday

22.00 – 04.00

21 = 42

LWLRRM - 01, LSLRD- 01, LWS-17, LWACCN - 01, LWSCZAC- 01

13236

D – 04.52

25

13212/13213

DNR-JBN-SHC Express

2

A – 15.45

Daily

16.30 – 22.30

16 = 32

LWLRRM - 01, LSLRD- 01, LWS-06, LWSCN - 07, LWACCN - 02, LWACCW- 01

13214/13211

D – 06.10

26

53231

DNR – TIA Passenger (ICF)

1

A – 00.40

Daily

02.00 – 08.00

18 = 36

GSLRD- 02,GS- 16

53232

D – 08.50

27

53204

DNR – JAJ Passenger (LHB)

1

A – 09.00

Except Sunday

10.00 - 16.00

22 = 44

LWLRRM- 01, LSLRD- 01, LWS - 20

53203

D – 17.25

28

RGD

12392

Shramjeevi Exp

3

A – 10.25

Daily

14.00 – 22.00

22 = 44

LWLRRM –01, LWFAC – 01, LWACCW- 02, LWACCN – 06, LWSCN -06, LS-3/LS-5 – 04, LWCBAC -01, LSLRD - 01

12391

D – 08.05

29

53229

RGD - FUT Passenger ( ICF)

2

A- 20.35

Daily

22.00 - 04.00

24 = 48

GS- 22, GSLRD- 02

53230

D- 07.00

30

13202

KurlaExp

4

A – 23:55

Daily

10.00 – 16.00

22 = 44

LWLRRM –01, LWFAC – 01, LWACCW- 02, LWACCN – 05, LWACCNE -1, LWSCN -06, LS-3/LS-5 – 04, LWCBAC -01, LSLRD - 01

13201

D – 23.55

31

ARA

13287

South Bihar Exp

6

A – 09.30

Daily

07.00 – 13.00 ( Incoming rake of Capital Exp)

22 = 44

LWLRRM – 01, LWFAC – 01, LWACCW- 02, LWACCN – 06, LWACCNE-01, LWSCN – 06, LS-3/LS-5 – 04, LSLRD - 01

13288

D – 18.45

32

13245

ARA- NJPCapital Exp

A – 05.45

Thu, Fri & Sat

14.00 - 20.00 ( Incoming rake of South Bihar Exp)

13246

D – 21.05

33

13247

ARA- KYQCapital Exp

A – 05.45

Sun, Mon, Tue & Wed

13248

D – 21.05

34

13225

ARA- JYG Intercity

2

A – 21.20

Daily

22.00 – 04.00

21 = 42

LWLRM – 01, LWSCZAC – 01, LWSCZ – 06 ,LS-3/LS-5 -11, LSLRD- 01, LWACCNE- 01

13226

D – 05.30

35

PNBE

53202

DNR – BXR Passenger (ICF)

1

A – 09.10

Except Sunday

10.00 – 16.00

20 = 40

GSLRD- 02,GS- 18

53201

D – 17.45

 

Seconory Maintained Trains of DNR division

S.N.

Depot

Train No.

Train Name

Arrival/Departure

Frequency

Load Details.

Train Composition

1

PNBE

22213

Shalimar DurantoExp.

A- 06.20 ( Tue, Thu & Sat)

Tri- Weekly

14 = 28

LWLRRM - 01, LWFCWAC - 01, LWACCW - 01, LWACCN - 10, LSLRD-01

22214

D – 20.45 ( Tue, Thu & Sat)

2

12741

Vasco- Da- Gama Exp.

A – 10.10 (Fri)

Weekly

20 = 40

LWLRRM – 01, LWACCW – 02, LWACCN – 02, LWSCN – 10, LWS -04, LSLRD - 01

12742

D – 14.05 (Sat)

3

22643

Ernakulum Exp. ( Via – ASN)

A – 20.00 ( Wed & Thu)

Bi -Weekly

22 = 44

LWLRRM – 01, LWACCW – 01, LWACCN – 03, LWSCN – 12,  LWCBAC – 01, , LWS-03,LSLRD - 01

22644

D – 14.00 ( Thu & Fri)

4

22669

Ernakulum Exp. ( Via – DDU)

A – 06.30 (Tue)

Weekly

22 = 44

LWLRRM - 01, LS3/LS-05 - 04, LWCBAC- 01, LWACCN - 06, LWACCW - 02, LWSCN – 07, LSLRD - 01

22670

D – 16.30 (Tue)

5

DNR

12295

SMVB – DNR Exp.(05)

A – 07.40

Daily

22 = 44

LSLRD - 01, LS-3/LS-5 - 03, LWSCN-07, LWCBAC- 01, LWACCN - 06, LWFCWAC- 01, LWACCW – 02, LSLRD- 01

12296

D – 20.15

 

Primary Maintained ( TOD)

SL.NO

TRAIN NO.

No. of Rakes

FROM-TO

Days of Operation

ARRIVAL TIME

DEPARTURE TIME

MAINTENACE

Load

Composition

1

03257/58

1

DNR - ANVT

Sun

20.45

7.30

PM- DNR

22 = 44

LWLRRM -01, LSLRD-01, LS-02, LWSCN-4, LWACCN-07, LWACCNE-7

2

03230/29

PNBE - PURI

Thu

10.45

8.45

3

03251/52

6

DNR - SMVB

Daily

23.55

15.00

PM- DNR

24 = 48

GSLRD - 02, GS - 08, WGSCN - 10, WGACCN - 02, WGACCW - 02

4

03253/54

2

PNBE-CHZ

Mon &Wed

14.15

13.30

PM- RNCC

22 = 44

LWLRRM -01, LSLRD-01, LS-02, LWSCN-4, LWACCN-07, LWACCNE-7

5

03293/94

2

PNBE - NDLS

Daily

12.25

21.00

PM- RNCC

22 = 44

LWLRRM -01, LSLRD-01, LS-02, LWSCN-4, LWACCN-07, LWACCNE-7

 

Secondary Maintained ( TOD)

SL.NO.

TRAIN NO.

FROM-TO

Days of Operation

ARRIVAL TIME

DEPARTURE TIME

Composition

1

06509/10 (LHB)

SBC- DNR

Wed

8.0

18.1

LWACCN-12, LWLRRM-2, LWSCN-7, LWACCN2-1

 

URLWork status under PH 21,41 & 42.pdf

URL:Annual Acheivement of Mech (C&W) FY 2024 - 25.pdfURL: Acheivement of Mechanical (C&W) DNR in FY 2025-26.pdf
URL: Pit Chart DNR Depot.pdf,   URL: Pit Chart RGD Depot.pdf,  URL: Pit Chart RNCC Depot.pdf, URL: Pit Chart PNBE depot.jpeg, URL: Pit Chart ARA.pdf
URL: EnHM APRIL 2026.pdf
URL: Disaster Management.pdf

URL: Tender Position of Mech- DNR .pdf

URL: Question Bank on LHB design Coaches.pdf

URL: Question Bank on Coaching Stock.pdf

URL: Question Bank on Freight Stock.pdf

  
 
Source : East Central Railway Last Reviewed : 28-05-2026