1. Cable protection arrangement ECR/S& T/Sig/Policy/200 Pt.1I dated 26/6/14 2. Checklist of IPS and Data Logger for Joint Signature during AMC visit ECR/S&T/Sig/Maintenance/Pt-III Dated 21.08.2014 3. Irregularities in the works of trenching, laying of cables-System improveinent ECR/S&T/Sig/Policy/200/Pt.III Dated 24.07.2014 4. Safety drive for level crossing gate. ECR/S& T/Sig / Maintenance/Pt.III Dated 02/7/2014 5. Winter precautions for Signalling System. ECR/S&T /SIG / Maintenance/Pt-III Dated 03.11.2014