Old Website
Government of India
Ministry of Railways
East Central Railway
search
OCR Search
Accessibility Controls
×
Resize Text
Reset
Dark Contrast
Light Contrast
Invert
Saturation
Text Size Increase
Text Size Decrease
Highlight Links
Unhighlight Links
Hide Images
show Images
Default Cursor
Increased Cursor Size
home
Ministry
about-us
our-team
our-organisation
our-performance
our-division
History
Heritage
Citizen Charter of ECR
our-department
Offerings
schemes-and-services
vacancies
tenders
tenders-related
Documents
reports
act-and-policies
publications
press-release
Media
Photos
Videos
Connect
directory
rti
Calendar
vendor-information
grievances
Home
ministry
our-department
Previous
Next
Signal & Telecom
> Policy
> Signal Policy
> 2024
Bookmark
|
Mail this page
|
Print this page
2024
2024
21.
S&T Policy-16/2024 Dt. 21.08.2024 ECR JPO (
e-file -283225) for availability of VHF sets for Train crew.
20.
CE/P&D/ECR Letter no-W-1/162/09/Misc Dt.13.08.2024 Joint Inspection of Station yard by SSE/P-Way,SSE/Sig & TI
19.
ECR-HQ0SnT(GEN)/70/2020 (CN: 38556) Dt 02.08.2024 JPO No. 02/2024 for adopting procedures for rectification of Auto Signal failures between two stations in Automatic Territory.
18. Signal Policy-15/2024 Dt. 30.07.2024 Thickness of Signal Number Plate.
17.E
CR/S&T/DRG/Corres./2024, Dt.22.07.2024 Typical VDU layout for RDSO 2.0
16.
Signal Policy-14/2024 Dt. 25.06.2024
Common minimum deficiencies defects observed during the statuary inspection of New Line
15.
Signal Policy- 13/2024 Dt. 03.06.2024
Enhancing Reliability of train detection for less used track
portion and against miscreant’s activities
14.
Signal policy-12/2024 Dt. 03.06.2024 Application format for PCSTE's approval for Non-Interlocking of Stations.
(Application format in word document)
13. S&T Policy-11/2024 Dt. 30.05.2024 Attending of deficiencies observed during the joint inspection of
Points and crossing
(JPO no.-01/2024).
12.
Signal Policy 10/2024 Dt. 14.05.2024 Structured testing of EIPIRRI system before commissioning.
11.
S&T Policy 09/2024 Dt. 21.05.2024 JPO no.ECR/HQ/JPO/e-file no.261966 regarding procedure for undertaking earth work digging work trenching work in the vicinity of signalling, telecom and electrical cables.
10.
ECR/S&T/DRG/Corres./2023 Dt. 29.04.2024 Policy guidelines for numbering System of Relay Hut in Automatic block Section.
09.
Signal Policy 08/2024 Dt. 25.04.2024 S&T Preparedness while working of BCM.
08.
Signal Policy 07/2024 Dt. 02.04.2024 Auto Reset mechanism for Dual MSDAC configration
07.
ECR/S&T/DRG/Corres./2021 Dt.19.03.2024 Modification in RDSO Point Circuit of RDSO type EI circuit.
06.
Signal Policy 06/2024 Dt. 15.03.24
Policy Regarding AMC of Data logger (Other than Efftronics make)
05.
Signal Policy 05/2024 Dt. 12.03.2024
Format for DC Track circuit History Card
04.
Signal Policy 04/2024 Dt. 12.03.2024
Policy regarding AMC of Efftronics make Datalogger in ECR
03.
Signal Policy 03/2024 Dt. 21.02.2024 Standard Template for Signal Number Plate in ECR
02.
Signal Policy 02/2024 Dt. 30.01.2024
Amendment in IPS Block Diagram 4L/RE and 6L/RE and LC gate Non
RE area
01.
Signal Policy 01/2024 Dt. 29.01.2024
Provision of 1000 Ohm,10W resistance across Relay Coil to reduce High Contact resistance
Source :
East Central Railway
Last Reviewed :
27-05-2026