·Traction Rolling stock :- (2056-26) ·Electric Loco Holding increased from 1002 to 1041. So, holding increased by 3.89% and availability of loco online increased by 4.50% wrt last year. Electric Loco Outage also increased by 2.40% excess of Railway Board’s target. ·39 nos. new 3-phase electric locos were added in the ECR system without any increment of M/Staff. ·All Maintenance Staff of Diesel Loco Sheds are trained for maintaining electric locos in Diesel Loco Sheds, and 345 electric locos are maintaining in diesel loco sheds in which 189 are 3-phase, and 156 are conventional electric locos. ·New rest rooms opened at DKGS (14 beds), Lalitgram (6 beds), SRGR (12 beds), Triveniganj (4 beds) for the rest of the crew, from where now long-distance trains are plying. ·357 locos provided with On Board Kavach during 2025-26, ready to operate in line where sections are ready with Kavach facility. ·Failure of Electric locomotive in terms of FRPCPY has been decreased by 17.30% in FY 2025-26 wrt last year. ( In ICMS, the total reported Failures in ECR during 2024-25 were 2063, nos. where as during 2025-26 only 1817 nos. failures were reported.) |

Accessibility Controls