Electrical General Services: - (2025-26) Achivment

 ·11 Nos. Lifts have been commissioned at major Railway stations over ECR.

          ·04 Nos. Escalators have been commissioned at major Railway stations overECR.

          ·2317.2 KWp Solar panel have been commissioned at rooftop of Railway stations, service buildings and hospitals over ECR.

          ·  1.1 MW Land based solar plant have been commissioned and generation has been started in SEE Division.

·            2.48 MU has been generated by solar plants and saving of Rs, 1.37 Cr. has been gained by installation of solar plants.

·Total Energy consumption has been reduced by 1.39% wrt last year upto Feb’26. 

·For real time On Line Monitoring of critical equipment such as lifts, escalators, pumps, light fittings, IR-NIYANTRAC work have been completed in DNR division (100%) and work is in progress in other division and 80% work has been completed.

·01 Nos. Building (officer club Sonpur) has  been awarded Shunya/Shunya plus buildings by BEE in SEE Division.

·Rebate availed Rs. 1.83 cr. (from Apr’25 to Feb’26) in non-Traction on account of timely payment of energy bill during the year.

·12 Nos. station/halt (SPJ Div-2,DNR Div -6,DHN Div -1,DDU Div -1  & SEE Div-     2) have been electrified through local supply during the year.

·Re-wiring work has been completed in 416 Nos Type-I staff quarters in Dhanbad division.

·To reduce the carbon emission, 02 Nos. 500 KVA (CPCB IV Compliant) DG set have been installed in power house Barauni and Sonpur in SEE Division.

 

Green Initiative works (Electrical General Services)

     हरित पहल कार्य (विद्युत सामान्य सेवाएं)

Some Key Green Initiatives taken by the ECR to reduce its carbon footprint in IR:-

·Conversion of 100% Conventional light to LED lights.

·Replacement of conventional old motors to energy efficient motors in phase manner.

·Replacement of old equipments like:

Un-starred AC with star rated inverter AC.

Conventional Fan with BLDC fan.

         High mast Street light with LED lights & Solar Street light.

·Implementation of natural illumination using in the newly constructed building.

·70%-30% platform lighting has been implemented at major stations.

·Provision of timer in street light, high mast & pumps as well as Installation of solar plants.

        Population of 3-Ph regenerative loco is increasing day by day which helps in energy saving while breaking the load. etc

 

Solar Initiatives: (सौर पहल)

·Different capacity solar plants (3.6MWp) commissioned in ECR in stations & service building consumption.  Moreover 4.4 MWp solar plant works in progress through PPP mode. & 5.09 MW solar plant installations are in progress through capex mode at major stations for energy consumption.

 

Lift & Escalators

In ECR 71 nos of Lift and 43 nos of Escalators installed in different sattion in ECR and 06  nos escalator and 07 nos life awated for installation.

 

IR-NIYANTRAC

IR-NIYANTRAC is being implemented in major station and service building for centralized or real-time monitoring system

 

Electric General Services (Power Supply) Summer Preparedness

 

विद्युत सामान्य सेवाएं (विद्युत आपूर्ति) ग्रीष्मकालीन तैयारी

 

          (i)Passenger Amenities items

·Proper working of passenger amenities items like water coolers, air conditioners, master chiller plant, UTS/PRS etc.

·Working of ceiling fans (encl. Exhaust fans) and safety checks for suspension arrangement to be done.

          (ii)Water Supply & Pumps

·Adequate availability of water at stations/washing lines and colonies etc.

·Availability of spare pumps and their spare parts like cable, starter, single phasing detector etc.

          (iii)Sub -Station & Power Supply arrangements

·Overhead line network/UG cable network- Power overhead lines to be checked for proper sagging provision of guard and cross guard wires.

·Checks for IR value of transformer winding and BDV/Acidity test for transformer oil.

·Cable jointing kits to be used for jointing cable and proper crimping should be done to avoid twisted joints where existing.

·IR value and earth value of all critical electrical assets to be recorded.

·Power factor of each substation to be measured and improve to enhance the current carrying capacity of electrical circuit.

·Phase balancing to be achieved to minimize current in the neutral circuit.

·All protective relays should be checked for proper setting, all fuses should be of proper size. Ensure functioning of protection system in HT panel. Earthing of sub-station by plate earthing, neutral grounding by separate pit, recording of earth pit resistance.

          (iv)DG set

·Proper working of DG sets , electricity supply to stations /colonies and sensitive locations, close coordination with local electricity board authorities. Garbage/inflammable materials /paper pieces should be removed from the vicinity of diesel tanks as fire is more prone during summer season. Joints of cables to be avoided in the vicinity of DG sets /HSD tanks and if not possible the cable jointing kits should be used or criped joints may be in boxes. Protection provided in DG sets like water temperature lub oil pressure and lub oil temperature must be in working order. MCBs/Change over switch connecting cable etc should be of proper size.

·Upkeep of spare parts of DG sets. Plan for overhauling of DG set, review existing AMC should be on OEM only. Genuineness of spare parts to be ensured.

 

Improved Illumination as per Airport Standard

                     हवाई अड्डे के मानक के अनुसार बेहतर रोशनी

 

Div

Name of stations with improved Illumination

Total

SEE

Sonpur, Hajipur,  Muzaffarpur, Barauni Jn, Begusarai,

Dalsingh Sarai, Khagaria, Mansi, Naugachhiya, Karpurigram, Narayanpur Anant, Lakhminia

12

SPJ

Samastipur, Darbhanga, Sitamarhi, Jaynagar, Madhubani, Sakri, Bapudham Motihari, Betiah, Narkatiyaganj, Raxaul, Bagha, Saharsa, Baijnathpur, Banmankhi, Sugauli, Rosera, Hasanpur, Salauna, Dumra, Gara, Runni Saidpur, Harinagar

22

DNR

Patna Jn., Patliputra, Patna Sahib, Bakhtiyarpur, Fatuha, Rajendranagar Terminal, Ara, Danapur, Jamui, Jhajha, Barh, Mokama, Kiul, Luckeesarai, Karauta, Bihta, Jehanabad, Taregana, Buxar, Gulzarbagh, Harnaut, Bihiya, Biharsharif, Khusrupur, Dildarnagar, Tehta, Hardasbigha, Hathidah, Rajendra Pul, Parsa Bazar,Dadpur, Bhalui, Kanhaipur, Lemuabad, Budhdeo Chak Yadav nagar, Kharaundh, Sadikpur, Manjhauligram , Zamania, Dumraon, Neora, Rajgi

              

42

DHN

Dhanbad, Koderma, Daltenganj, N.S.C.B.Gomoh, Chandrapura, Garhwa Road,Parasnath, Hazaribagh Road, Renukut, Chopan

10

DDU

Pt. Deen Dayal Upadhyay, Gaya, Dehri On Sone,  Sasaram, Anugrahnarayan Road, Bhabhua Road, Ankorha, Kudra

8

 

                                                                                       Total- (All Mejour Station Covered)

94

     

 

Source : East Central Railway Last Reviewed : 27-05-2026