SONPUR DIVISION
Status of awarded tenders As on 08.12.2020
S. No. Name of Work & Location 24.01.2021 Tendered Cost in Rs. %age above/ below Sch. of rates applicable Agreement No. & date Agency Date of comme- ncement Time of compl- etion Progress of work Name of Officer in charge with address Remarks
1 2 3 4 5 6 7 8 9 10 11 12
Engineering Department
1 KIR-BJU Section: TTR(CS+CMSC)= 173 Sets, on existing PSC Sleeper. Total = 173 Sets. 14841454 18193590.77 Any other items of work not provided in the above items of schedule but provided in the ECRUSSOR-2012 = (+)45%, Schedule- B(NS Items)= Rebate- Nil. DRM/TC/1733
Dt. 06.02.2019
M/S Mantun Roy Construction, At- Hajipur, PO- Pipra Dewas, P.S- Barauni, Distt.- Begusarai, Bihar - 851112 18.11.2018 28.10.2020 61% Sri Dinesh Kumar ADEN/East/BJU Work in progress.
2 Katihar - Barauni Section:- 1.Casual renewal of 52 Kg rails in (i)BJU-KIR(UP) Total = 1.10 Km 2.Casual renewal of Sleepers (Primary) in (i) BJU-KIR(UP) = 5.5 Km 3.TRR/P of existing 52 Kg/90 UTS rails on PSC-6 Sleepers with new 60 Kg/90 UTS rail from Km 109.20-111.54, Total = 2.34 Km.(DN Line),4. Through Rail Renewal (Primary) of existing 52 Kg/90 UTS rails on PSC-6 Sleeper with new 60 kg/90 UTS rails in Tilrath - Garhara by pass line from Km. 0.00-1.545, Total TRR/P = 1.545 Km. 5. TTR(TWS)-3 Sets & SEJ-96 Sets. 6. CTR/S (TSR/P & TRR/S) at Km 38.01-38.404 in KUE Goods Siding no. 5, Total = 0.394 Km & TRR/S at Station SMO-0.947 Km, CRR-0.282Km & NNA-0.771 Km, Total=2.001Km and 7. Casual Renewal of fittings of Turnouts 1:12/1:8:5 (i) BJU - KIR = 94 nos. & (ii) BJU - RJO = 09 nos. Total = 103 nos. 10581351.28 11406783.92 1.All Items of Work provided in the ECR/USSOR-2012 = Schedule - A (+) 60.395% above on USSOR-2012. Schedule-B(NS Items)= Rebate = Nil. DRM/TC/1809
Dt. 29.07.2019
M/S Rajiv Kumar, At + PO- Baro, Tola- Bishanpur, PS- Phulwaria, Distt.- Begusarai, Bihar- 851118, Mob. No. 09431290918 01.07.19 25.12.2020 76% Sri Dinesh Kumar ADEN/E/BJU & Sri Shailesh Kumar ADEN/THB Work in progress.
3 BJU-KIR section:- Through Ballast Remewal deep screening required to provide 300mm clear custion in track in up line Km 3.30, 10.26, 65.86 – 71.75, 81.48 – 91.00, 93.00 – 98.50, 178.00, 179.02 and in Dn line Km. 178.00 – 179.02, 175.00 – 177.00, 100.13 – 129.30, 65.86 – 71.25 Total 54.55 Km. 13431654.93/- 13431654.93 1. All items of work provided in ECR/ USSOR-2012= (+) 15% 2. NS-1 = 15.69/-, NS-2 = 4.63/-, NS-3 = 308.71/-, NS-4 = 73.74/-, NS-5 = 17.24, NS-6 = 17.78/-, NS-7a = 49.39/- , NS-7b = 48.13/- NS-8 = 47.52/- NS-9 = 3596.79/- NS-10 = 9918.11/- NS-11a = 10632/- NS-12a = 9573.55/-Rebate= Nil. DRM/TC/1521 Dt. 05.01.17 Eleco Constn. Pvt Ltd., Sri Krishna Nagar, Begusarai. 30.11.16 30.04.2020 60% Sri Dinesh KumarADEN/E/BJU&Sri Shailesh Kumar ADEN/THB Work in progress. Extension of DOC required from agency
4 Barauni – Katihar(ex) section (UP, DN & SL) (i) CTR(P) of existing 52Kg. 90 UTS rail on PSC-5 (M +7) Sleeper by new 60 Kg. – 90 UTS rail on PSC- 6 (M+8) sleeper in UP line from Km.63.585 – 65.585, 71.39 – 73.13 & DN line from Km. 168.00 – 169. 20 Total 4.94 Kms (ii) TRR(P) of existing 52 Kg. 90 UTS rail on PSC-6 (M-7) sleeper by new 60 Kg. – 90 UTS rail in UP line from Km. 18.90 – 21.65, 63.13-65.86 & in single line from Km. 81.48 – 82.195, 86.00 – 90.00 and 98.50 -100.13 Kms. Total – 9.825 Km. 13186979/- 17027604.8 1. All items of work provided in ECR/ USSOR-2012 = (+) 25.35% NS-1 to 16 (+) 87.645 Rebate = Nil DRM/TC/1535 Dt. 08.03.17 M/S Rajiv Kumar, Railway & state Govt. contractor. At + PO- Baro 6 no. Dhala, Bisanpur, P.S- Phulwaria Distt.- Begusarai (Bihar), Pin- 851118 31.01.17 1/24/2021 99% Sri Dinesh Kumar ADEN/E/BJU&Sri Shailesh Kumar ADEN/THB Work in progress.
5 Barauni-katihar section: Supply of portion, SKV welding equipments and other allied itmes related to SKV welding under jurisdiction of Sr. DEN/II in Sonpur division by Single shot Crucible method. 36208316/- 31820264/- 1. All items of work provided in ECR/ USSOR-2012= 2. NS-1(a) = 4900/-, NS-1(b) = 5049/-, NS-2(a) = 3500/-, NS-2(b) = 3650/-, NS-3(a) = 240/-, NS-4 = 240/-, NS- 5 = 200, NS-6 = 530000/- Rebate= Nil. DRM/TC/1635 dt. 02.05.18 The India Thermit Corporation Ltd. 84/122, Fazal Ganj Kanpur U.P. 208012 25.03.2018 31.10.2020 70% Sri Dinesh Kumar ADEN/E/BJU & Sri Shailesh Kumar ADEN/THB Work in progress.
6 Barauni-Katihar Section: 1. TRR/P of existing 52Kg/90 UTS rail on PSC-5 Sleeper with new 60Kg/90UTS rail on UP Line from Km. 21.65-39.23 and DN line from Km. 43.50-46.70 TRR/P = 20.78 Km. 2. Through Rail Renewal (S) of existing 52 Kg./90/72 UTS rails on SH PSC-5 with SH 52 Kg/90UTS rail at Semapur L-1 = 0.95, Karagola Road L-1 = 1.04, Kursela L-1 = 1.09, Naugachia L-1 = 0.92, Naugachia L-4 = M 1.08, Tilrath L-1 = 1.02 & Tilrath L-5 = 0.95, Total = 7.05 Km. 14513402.49 15028168.34 1.All Items of Work provided in the ECR/USSOR-2012 = Schedule - A (+) 51.58% above on USSOR-2012. Schedule-B(NS Items)= Rebate = Nil. DRM/TC/1776
Dt. 26.04.2019
Om Shanti Enterprises, At – F2/10, P. C. Colony, Kankarbagh, Patna, Bihar-800020 21.03.19 30.09.2020 100% Sri Shailesh Kumar ADEN/THB Work physically completed final bill in process.
7 KIR(ex) – MNE section:- Repairs to cess, slop of embankment and trolley refuse of DN/UP line and Km. 57/1-2 in sand hump under ADEN/THB. 8009860/- 10172522.2 1. All items of work provided in ECR/ USSOR-2012= A-= (+) 27% Rebate= Nil. DRM/TC/1454 Dt. 13.06.16 Raksha Associates, 405 A, Gour Ganga, Sec-4, Vaishali, Bhaziabad, U.P..- 201010 01.4.16 31.03.19 45% Sri Shailesh Kumar ADEN/THB Work in progress. Extension of DOC is required from Agency.
8 KIR-BJU section (UP & DN): Track maintenance work against vacancy of trackman under SSE/P.Way/KUE in the jurisdiction of ADEN/THB 9246963 10091749.13 1. All items of work provided in ECR/ USSOR-2012= Schedjule-A-1 = 55.25% Rebate= Nil. DRM/TC/1853
Dt. 04.02.2020
Om Shanti Enterprises, At - F2/10, P.C colony, Kankarbagh, Patna 15.07.19 14.01.21 20% Sri Shailesh Kumar ADEN/THB Work is in progress
9 Supply of boulder and stone dust and loading into any type of wagon from bakudih/pakur or any other quarry of Sahebganj loop for monsoon reserve stock of Sonpur division 13748500 15995000 N.S - 1 Rs. 1390/cum & N.S -2 Rs. 419/Cum DRM/TC/1848
Dt. 20.01.2020
Gopal Mishra, At - Rajhata, Binodpur, Distt. - Katihar, Bihar 20.05.2020 31.08.2020 59% Sri Shailesh Kumar ADEN/THB Work in progress.
10 Casual renewal of fittings for channel sleepers in BJU-KIR (UP) section = 2806 Nos. 13747000 12390659.17 1. All items of work provided in ECR/ USSOR-2012= Schedjule-A-1 = 22.82%, NS Rs. 3949/Set Rebate= Nil. W/362/BJU-KIR/Channel sleeper/TC/543, dt. 07.03.19 Jai Mangla Construction, At - Bihat, Tola - Ibrahimpur, Refinary road, Begusarai
06.03.21 0% Sri Shailesh Kumar ADEN/THB Work is to be started
11 KIR-BJU section: Through ballast renewal of track including 300mm deepp screening - 31.03Kms 12607683 11717315.17 1. All items of work provided in ECR/ USSOR-2012= Schedule-A-1 = 57.51%, Rebate= Nil. 04SEE19-20-05, dt. 28.11.19 M/S R.N Choudhary, Kishanganj , NH -31, Opp. Mal Godam , Kishanganj, Bihar
27.11.20 0% Sri Shailesh Kumar ADEN/THB Work is to be started
12 Repair and strengthening of existing formation with provision of sub bank at Km. 81/1-85/8 UP line side between NNR-BRKB and KM 86/4-87/0 bet. BRKB-PSR Section under jurisdiction of ADEN/THB. 30313242.64 43474351.22 1. All items of work provided in ECR/ USSOR-2012= Schedule-A-1 = 64.565%, Rebate= Nil. DRM/TC/1799, dt. 12.07.19 Om construction, AT - Opp. Bus Stand, Barauni 20.06.19 20.11.20 73% Sri Shailesh Kumar ADEN/THB Work is in progress
13 BJU-KIR (UP & DN) line)Section:-(i) TRR(P)=17.30 Tkm(ii) TBR=6023 Tkm(iii)TFR=66.09 etc 27340393 16192766 1. All items of work provided in ECR/ USSOR-2012= Schedule-A-1 = at par Rebate= Nil. DRM/TC/1862, dt. 15.06.2020 M/s Rajiv Kumar 15.06.2020 16.01.2021 20% Sri Shailesh Kumar ADEN/THB Work is to be started
14 For Construction of Road, quarter, FOB, Booking Office and other miscellaneous work in connection with junction arrangement work within the Railway boundary at Dinkar Gram Simaria station etc. 48516847.6 45349265 Sch (A) =(-)8.25%,Sch (A-2)=(-)7.25%, & Sch(A-3)=(-)5.25% Engg./11 SEE 19-20-13/01003820019824 Dt.03.06.020 M/s Rajiv Ranjan
28.02.2021
Sri Dinesh Kumar ADEN/E/BJU Work is to be started
15 For construction of embankment for track and road in connection with junction arrangement work within the railway boundary at Dinkar Gram Simaria station etc. 63868765.02 73449079.77 Sch (A)=+15% Engg./11 SEE 19-20-14/01061500019189 Dt.15.05.20 M/s Gopal Mishra
14.11.2020
Sri Dinesh Kumar ADEN/E/BJU Work is to be started
16 BJU-KIR (UP,DN & SL) Section;- (i) CTR(P) of 52 Kg/90UTS rail on existing PSC-5 (1540 Nos/Km) sleeper with new 60 kg / 90UTS rail and PSC-6 (1660 Nos./Km) 6.42 etc.Total=23.60 Km. 32543400 42977325.5 Sch (A)=+44% DRM/TC/1645, dt. 04.06.2018 Maihar Builders Pvt ltd. 17.05.2018 25.12.20 70% Sri Shailesh Kumar ADEN/THB Work is in progress
17 BJU-KIR Section:- Supply of portion, SKV welding equipments and other allied items related to SKV welding under jurisdiction of DEN/2/SEE in Sonpur Division by Single Shot Crucible method. 28363614.5 28087649 1. All items of work provided in ECR/ USSOR-2012= 2. NS-1(a) = 4900/-, NS-1(b) = 5049/-, NS-2(a) = 3100/-, NS-2(b) = 3150/-, NS-3 = 240/-, NS-4 = 240/-, NS- 5 = 200, NS-6 = 475000/- Rebate= Nil. Engg./16 SEE 19-20-05/00854630026018 Dt.22.09.20 The India Thermit Corporation Ltd. 84/122, Fazal Ganj Kanpur U.P. 208012
21.06.21
Sri Dinesh Kumar ADEN/E/BJU,Sri Shailesh kumar ADEN/THB Work is to be started

Engineering Department
1 At Teghra: Provision of foot over bridge and Booking office, (Out of turn) 18147000 14577049 1. All items of work provided in ECR/ USSOR-2012= Schedjule-A-1 = 20.75%, A-2 = 12.125%, A-3 = 12.125% Rebate= Nil. DRM/TC/1678 dated 18.09.18 M/S Anil Kumar At + PO- Simaria, PS- Barauni, Distt.- Begusarai, Pin- 851126 28.10.18 28.02.20 100% Sri Anil Kumar ADEN/W/BJU Work completed. Final bill passed.
2 (1) Provision of drain Ghoshwar yard, PF surfacing of PF No-2, Improvement of circulating area, Provision of low cost shed, waiting hall /& boundary wall etc. (2) Repair of LC approach road, cess reapir, trolley vefuse reapir at shelterd location between LC No. 51 to BR. No. 67 & UP to Ghoshwar station, (3) Construction of boundary wall left side of track between LC No. 54 & LC No. 51. ( Approx length 1.5 km.) Construction Org. fund.
14999809
13575537 All items of work provided in ECR/ USSOR-2012 = Ann. A-1 (-) 10% on advt. value i.e (+) 3.50%, A-2 (-) 11% on advt. value i.e (+) 2.35%, A-3 – (-) 10% on advt. value i.e (+) 3.50%, At par Rebate- Nil DRM/TC/1639 dt. 21.05.18 Sri Ravi Kishore Singh, At Paharichak, Sonpur, P.O.+PS- Sonpur, Distt- Saran, Bihar- 41101 Mob. No. 8873760551 02.05.18 08.07.20 50% Md. Abdus Samad ADEN/S/MFP Work in progress & Application of DOC required from Agency.
3 At MFP- Upgradation of coaching pit line over Indian Railway (Concrete Pathway and drainage facilities.) 9966123 11874259 1. All items of work provided in ECR/ USSOR-2012= Schedjule-A-1 = (+) 29.43%, A-2 = (+) 4.63%, A-3 = (+) 8.13% Rebate= Nil. No. W/362/MFP/ Upgradation/Pathway & dranage/TC /2232 dt. 11/12-09-18 Mahnar Infratech Pvt. Ltd., Hopuse no. 275, Road no. 5, Rajput Nagar, Hajipur, Vaishali, Bihar -- 10.12.20 0 Md. Abdus Samad ADEN(S)/MFP Work in progress.
4 At Goraul- Proposed raising of PF no. 1 & 2 25979491 23983573 1. All items of work provided in ECR/ USSOR-2012= Schedjule-A-1 = (+) 22.01%, A-2 = 0%, A-3 = 0% Rebate= 0.70% DRM/TC/1713, dt. 26.12.18 Sri Nageshwar Prasad sing, At + P0- Thathan Buzurgh, Sarai, Vaishali, Bihar 844125 15.11.18 30.06.20 100% Md. Abdus Samad ADEN(S)/MFP Work Completed. Final Bill awaited.
5 At Turki: Proposed raising of PF No. 1 & 2 25969836 24460291 1. All items of work provided in ECR/ USSOR-2012= Schedjule-A-1 = (+) 20.186%, A-2 = (+) 16.736%, A-3 = (+) 16.736% Rebate= 0% DRM/TC/1739, dt. 15.02.19 Rama Shri Sai Const. Pvt. Ltd. At + P.O - Aunta, Patna 28.12.18 07.09.20 76% Md. Abdus Samad ADEN/S/MFP Work in progress & Application of DOC required from Agency.
6 Provision of 01 additional new FOB 6.0m wide at BJU 73363490 59434531 1. All items of work provided in ECR/ USSOR-2012= Schedjule-A-1 = (+) 11.55%, A-2 = (+) 1.20%, A-3 = (+) 11.55% Rebate= 0% N0. W/362/BJU/ Prov/FOB/TC/3050, dt. 28.12.18 Coxcomb Engineering India Pvt. Ltd. House No. B/1, Sector No. D/1 Kankarbagh colony, Patna 12.05.19 27.06.20 55% Sri N.K Sinha ADEN/W/BJU Work in progress & Application of DOC required from Agency.
7 Provision of one additional new FOB 6.0m wide at MFP. 67098841 76851077 1. All items of work provided in ECR/ USSOR-2012= Schedjule-A-1 = (+)27.65%, A-2 = (+) 27.65%, A-3 = (+) 32.25% Rebate= Nil. W/362/MFP/Pro.New/FOB/TC/556 dt.07.03.19 Trans India & Company, House No. – 936, Road No. 05, Kharsawan Jharkhand 01.12.19 07.06.20 20% Md. Abdus Samad ADEN/S/MFP Work in progress & Application of DOC required from Agency.
8 At Bhagwanpur: {Provision of new FOB and raising of P.F. No.01. 21854137 23320224 1. All items of work provided in ECR/ USSOR-2012= Schedjule-A-1 = (+)26.50%, A-2 = (+) 15%, A-3 = (+) 20.75% Rebate= Nil. W/362/BNR/Pro./FOB/P.F.No.01/TC/88 dt.09.01.19 Ratan Kr.Dubey 15.09.19 31.05.20 2% Md. Abdus Samad ADEN/S/MFP Work in progress & Application of DOC required from Agency.
9 Provision of FOB at GRL,KHI& TUR. 13790768 14696162 1. All items of work provided in ECR/ USSOR-2012= Schedjule-A-1 = (+)22.55%, A-2 = (+) 22.55%, A-3 = (+) 22.55% Rebate= Nil. DRM/TC/1498 dt.20.09.16 Dayal Hightech Engg. Pvt. Ltd. 05.07.16 17.06.20 80% Md. Abdus Samad ADEN/S/MFP Work in progress & Application of DOC required from Agency.
10 Construction of 60 beded new running room at BJU 18433322 17690235 1. All items of work provided in ECR/ USSOR-2012= Schedjule-A-1 = (+)8.48%, A-2 = (+) 15%, A-3 = (+) 13.85% Rebate= Nil. DRM/TC/1758, dt. 19.03.19 Subhdra Construction 10.02.19 30.10.20 85% N.C. Sinha work in progress
11 At BJU: Re-construction of washin pit No. 2 75179586 48636525 1. All items of work provided in ECR/ USSOR-2012= Schedjule-A-1 = (+) 24.20%, A-2 = (+) 19.60%, A-3 = (+) 21.92% Rebate= Nil. DRM/TC/1800 Dt. 12.07.19 Om Construction 07.08.19 30.11.20 70% Sri Anil Kumar ADEN/W/BJU Work in progress.
12 At BCA: provision of 20 beded RPF barrack 16972953 10231219 1. All items of work provided in ECR/ USSOR-2012= Schedjule-A-1 = (-) 4.77%, A-2 = (-) 4.77%, A-3 = (-) 4.77% Rebate= Nil. DRM/TC/1814 Dt. 02.08.19 Mukund Kr. Singh & Co. 22.08.19 16.12.20 65% Sri Anil Kumar ADEN/W/BJU Work in progress.
13 At BJU- SPJ sec: Provision of LHS in lieu of LC No. 25 'C' (M) bet. BCA-STJT at KM 3/12-13 15703661 14589387 1. All items of work provided in ECR/ USSOR-2012= Schedjule-A-1 = (+) 24.20%, A-2 = (+) 24.20%, A-3 = (+) 24.20% Rebate= Nil. DRM/TC/1830 Dt. 03.10.19 Vindyavashni Const
12.03.20 0% Sri Anil Kumar ADEN/W/BJU Work to be started. Extension of DOC is required from agency.
14 BJU-KIR section:- Provision of limited height subway in CI x 41.0m) span and 3.60 m height near L.C. No. 5”B” Class (M) at CRR at Km 21/15-16 15132897/- 14891786.89 1. All items of work provided in ECR/ USSOR-2012= A-1= (+) 18%, A-2 = (+) 18%, A-3 = (+) 18% & Schedule B (+) 27% Rebate= Nil. DRM/TC/1455 Dt. 15.06.16 Raksha Associates, 405 A, Gour Ganga, Sec-4, Vaishali, Bhaziabad, U.P..- 201010 10.08.16 10.08.19 60% Sri Shailesh KumarADEN/THB Work in progress.
Extension of DOC required from agency.

15 BCA-HJP Section:- Provision of LHS in lieu of LC no. 26A ‘C’ Class (UM) bet. MNO-SPP at 230/11-12, LC No. 11 ‘C’ Class (UM) bet. MOG – VPDA at Km. 211/6-7 & LC No. 20 ‘C’ Class(M) bet. MOG-SPP at Km. 224/10-11 32454547/- 30494296.49 1. All items of work provided in ECR/ USSOR-2012= A-1= (+) 35%, A-2 = (+) 5%, A-3 = At par & Schedule B (+) 11% Rebate= Nil. DRM/ TC/1484 Dt. 05.08.16 Sudhakant Enterprises Pvt. Ltd., 5/6, Punjabi Colony, Samastipur. 24.9.16 05.11.17 20% Shri K.D. PrasadADEN/L/SEE work is terminated on administrative Acount.Final Bill under Process.
16 BJU-KIR section:- Provision of limited height subway 04 nos. having (1 x 4.0m) span and 3.60m height near L.C. No. 10A between Naugachia – Katareah at Km. 539-54/0 and 4C, 4B & 44 between Karhagola road – Semapur at, Km. 17/4-5, Km. 15/5-6 & Km 14/5-6 respectively (All C class). 70248676/- 67789484.35 1. All items of work provided in ECR/ USSOR-2012 = Ann. A-1 (+) 25.35%, A-2 (+) 22.245%, A-3 (+) 22.245% & NS-1 A (+) 2.7%, Rebate = 1.08% DRM/TC/1562 Dt. 23.06.17 Raksha Associates, 405 A, Gour Ganga, Sec-4, Vaishali, Bhaziabad, U.P..- 201010 10.03.17 30.10.20 95% Sri Shailesh Kumar ADEN/THB Work in progress.
17 BJU-KIR section:- Provision of limited height subway in (1 x 4 cm) span and 3.60 m height in liu of LC no. 5C ‘C’ class (U/M) between Bakhri – Karhagola road at Km. 26/5-6. 17951624/- 18800555.2 1. All items of work provided in ECR/ USSOR-2012 = Ann. A-1 (+) 18%, A-2 (+) 18%, A-3 (+) 18% & NS-1 A (+) 2.7%, Rebate = Nil. DRM/TC/1561 Dt. 25.06.17 Raksha Associates, 405 A, Gour Ganga, Sec-4, Vaishali, Bhaziabad, U.P..- 201010 05.01.17 31.12.19 100% Sri Shailesh Kumar ADEN/THB Work completed, Final bill awaited.
18 SEE – CI section (i) Provision of LHS in lieu of L.C. No. 22’C’(UM) between BAGL-DGA, (ii) Provision of LHS in lieu of L.C. No. 24’C’(UM) between BAGL-DGA, (iii) Provision of LHS in lieu of L.C. No. 29’C’(UM) between GJH-BAGL, (iv) Provision of LHS in lieu of L.C. No. 34’C’(UM) between CI-GJH, 68672073/- 60689783/- All items of work provided in ECR/ USSOR-2012 = Ann. A-1 (+) 21.90%, A-2 (+) 21.90%, A-3 (+) 21.90% Schedule ‘B’ all item (+) 19% Rebate = Nil. DRM/TC/1606 Dt. 25.01.18 Trans India & Co., Shop no.-14, Rai Market, Sher E Punjab Chowk, Adityapur-1, Jamshadpur, Jharkhand. 21.11.17 31.12.20 70% Shri K.D. Prasad ADEN/L/SEE Work in progress.
19 BJU – KIR (i) Provision of LHS in lieu of L.C. No. 10’C’(M) between NNA-KTRH, (ii) Provision of LHS in lieu of L.C. No. 10’B’(M) between NNA-KTRH, (iii) Provision of LHS in lieu of L.C. No.5B’C’(M) 61998663/- 47346001/- All items of work provided in ECR/ USSOR-2012 = Ann. A-1 (-) 15% ie (-) 2.25%, A-2 (-) 15% ie (-) 2.25%, All NS- (+) 5% Rebate = Nil. DRM/TC/1622 dt. 21.03.18 Sri Rajiv Ranjan Singh, At- Veer Kunwar Singh Nagar, Katria, Ara, Distt Bhojpur, Bihar- 802301 01.02.18 30.06.20 80% Sri Shailesh Kumar ADEN/THB Work in progress. Application of DOC required from Agency.
20 BJU – KIR (i) Provision of LHS in lieu of L.C. No. 5H’C’(M) between BKHR-KUE, (ii) Provision of LHS in lieu of L.C. No. 13’C’(M) between KHQ - NNA (iii) Provision of LHS in lieu of L.C. No.5D’C’(UM) Between BKHR - CRR 64680268/- 52635093/- All items of work provided in ECR/ USSOR-2012 = Ann. A-At par with nil rebate i.e (+) 15%, A-2 At par with nil rebate i.e (+) 15%, A-3 At par with nil rebate i.e (+) 15%, All NS- At par with nil rebate DRM/TC/1630 dt. 04.04.18 Sri Narendra Kumar At- Veer Kunwar Singh Nagar, Katira (Ara) Distt- Bhojpur, Bihar- 802301 01.02.18 30.06.20 70% Sri Shailesh Kumar ADEN/THB Work in progress. Application of DOC required from Agency.
21 Sonpur – Chhapra Kachehri Section : (i) Provision of limited height subway in lieu of LC No. 10 “D” Spl. class bet Nayagoan – Sitalpur at Km. 284/1-0. (ii) Provision of limited height subway in lieu of LC No. 3 ‘A’ class between Sonpur – Permandpur at Km. 275/0-1. 49990300/- 42139230/- 1. All items of work provided in ECR/ USSOR-2012= Schedjule-A-1 = (+) 18.45%, A-2 = 15.00%, NS-1 = 15.00% Rebate= Nil DRM/TC/1718 Dt. 07.01.19 Trans India & Company, House No. – 936, Road No. 05, Kharsawan Jharkhand 27.10.18 31.03.20 100% Sri K. D. Prasad ADEN/Line/SEE Work Completed. Final Bill under Process.
22 SEE-CI(ex) Section- (1) Provision of LHS in lieu of LC No. 31’C’ ) Provision of LHS in lieu of LC No. 31’C’(M) b/w GJH at km. 314/2-3. (2) ) Provision of LHS in lieu of LC No. 35’C’ (M) class b/w GJH-CI at km. 317/4-5. (3) Provision of LHS in lieu of LC No. 36’C’ (M) class b/w GJH-CI at km. 318/3-4. (4) Provision of LHS in lieu of LC No. 37’C’ (M) class b/w GJH-CI at km. 318/13-14. (5) Provision of LHS in lieu of LC No. 38’C’ (M) class b/w GJH-CI at km. 319/9-10. 88108183/- 79383132/- 1. All items of work provided in ECR/ USSOR-2012= Schedjule-A-1 = (+)21.27%, A-2 = 21.27%, A-3 = 21.27% NS-1 = 5.45% Rebate= Nil DRM/TC/1786 Dt. 20.05.19 M/S Brij Nandan Singh, At- Triveni-A, Flat no.- 01D, Shristi Nagar, Asansol, West Bengal 25.12.18 07.09.20 60% Sri K. D. Prasad ADEN/Line/SEE Work in progress. Extension of DOC is required from agency.

24 SEE-CI(ex) Section- (1) Provision of LHS in lieu of LC No. 17’C’ (M) between DGA-BAGL Km. 297/14-15 (2) Provision of limited height subway in bet. Of LC no. 21’C’ (M) class bet. DGA-BAGL at Km. 30/11-12 (3) Provision of limited eight subway in bet. Of LC no. 23’C’ (M) b/w DGA-BAGL Km. 303/4-5 (4) Provision of limited height subway in b/w of LC no. 25’C’(M) b/w BAGL at Km. 305/7-8 (5) Provision of limited height subway in b/w of LC no. 27’C’ (M) class b/w BAGL-GJH at Km. 310/9-10 90750694/- `79360024/- 1. All items of work provided in ECR/ USSOR-2012= Schedjule-A-1 = (+) 21.27%, A-2 = 21.27%, A-3 = 21.27% NS-1 = 5.45% Rebate= Nil DRM/TC/1780 Dt. 14.05.19 M/S Brij Nandan Singh, At- Triveni-A, Flat no.- 01D, Shristi Nagar, Asansol, West Bengal 16.01.19 07.09.20 65% Sri K. D. Prasad ADEN/Line/SEE Work in progress. Extension of DOC is required from agency.

25 SEE-CI(ex) Section- (1) Provision of LHS in lieu of LC No. 6’C’ (M) At PMU Km. 278/11-12 (2) Provision of limited height subway in bet. Of LC no. 8’C’ (M) class bet. PMU-NYO at Km. 280/5-6 (3) Provision of limited eight subway in bet. Of LC no. 12’C’ (M) b/w at STLR Km. 290/11-12 (4) Provision of limited height subway in b/w of LC no. 14’C’(M) at STLR at Km. 292/11-12 84603911/- 63533595/- 1. All items of work provided in ECR/ USSOR-2012= Schedjule-A-1 = (+) 21.27%, A-2 = 21.27%, A-3 = 21.27% NS-1 = 5.45% Rebate= Nil DRM/TC/1781 Dt. 14.05.19 M/S Brij Nandan Singh, At- Triveni-A, Flat no.- 01D, Shristi Nagar, Asansol, West Bengal -- 07.09.20 50% Sri K. D. Prasad ADEN/Line/SEE Work in progress. Extension of DOC is required from agency.

26 At Hajipur- Re-development of station with provision of other passenger amenities 59051109/- 55553187/- 64282085.26 1. All items of work provided in ECR/ USSOR-2012= Schedjule-A-1 = (+) 8.39%, A-2 = 3.80%, A-3 = 8.96% NS-1 = 5426/- NS-2 = 9651/- NS-3= 930/- NS-4 = 5950/- NS-5 = 118/- Rebate= 0.25% DRM/TC/1738 dt.15.02.19 Rohan construction Pvt. Ltd. C/O- Rajnish Tripathi Opp. Chiran Mill, Hawai Adda Road, Parrevwa, Ward No. 01, Raxaul, West Champaran, Bihar- 845305 10.12.18 31.12.20 75% Sri K. D. Prasad ADEN/L/SEE Work is in progress.
27 At Hajipur: Construction of boundrywall, yard drain and PPWI/Store cum Gang hut under SSE(W)/HJP Jurisdiction. Construction fund 10598320/- 10266720/- Rev. to 12763531.03 1. All items of work provided in ECR/ USSOR-2012= Schedjule-A-1 = 20%, A-2 = 20%, A-3 = (-)76% 2 Rebate= Nil. DRM/TC/1646 dt. 04.06.18 Shravani Engineers Pvt. Ltd., B-45, Deva Road, Him City Part-1, Ganeshpur, Rehmanpur, Lucknow, U.P.- 226028 10.05.18 30.03.20 85% Shri K.D. Prasad ADEN/L/SEE Work in progress. Application of DOC required from Agency.
28 At HJP: (1) Construction of 66 units Type II & Type III quarters by replacement of 50 units Type I, 16 units Type II & 2 unit Type III quarters on age cum condition basis under CWP (2) Const. of 02 unit Type II quarter on replacement account. 66729942/- 80781655.82 Rev to 96819159.69 All items of work provided in ECR/USSOR-2012- (+) 21% NS-1 @370/- P/Sqm DRM/TC/1261 dt. 16.09.14 New Nalanda Tubewell Boring & Engg. Works, Bhaisasur, Ranchi Road, Biharsarif, Nalanda 17.10.14 31.07.20 95% Shri K.D. Prasad ADEN/L/SEE Work is in progress.
29 BCA(ex)- HJP(ex) Section: Provision of P.P. shelter on Pf no. 2 at SPP, MOG, DES, AYRN & MNO Station. (Total 10 Bays). In connection with SEE div. 2 bay shelter on PF no. 2 (11 station) and PF no. 01 (4 Station) total 30 bays. 18281484/- 18992684/- Revised to 21061556.94 1. All items of work provided in ECR/ USSOR-2012= A-1= (+) 23.63%, A-2 = (+) 5.63%, A-3 = (+) 12.63% Rebate= 1.63%. DRM/TC/1488 Dt. 16.18.16 Mahnar Infratech Pvt. Ltd. House no.- 275, Road No.-5, Rajput Nagar, Hajpur, Distt.- Vaishali. 07.07.16 30.11.20 95% Shri K.D. Prasad ADEN/L/SEE Work in progress.
Engineering Department
1 GHZ- Replacement of damaged & leaky steel tank by RCC tank(50000 gallons capacity) each in colony under CWP(Two nos ) 10670796 12643851.17 1. All items of work provided in ECR/USSOR-2012= (+) 18.40%Rebate= Nil. NS-1 = 5800/- NS-2 = 6700/- NS-3 = 5800/- NS-4 = 49/- DRM/TC/1356 Dt. 07.09.15 Sri Rajesh Kumar, Amgola, Nakawali Gali, Distt.- Muzaffarpur. 17.02.15 30.09.19 40% Sri Dinesh Kumar DEN/E/BJU Work in progress. Extension of DOC required from agency
3 At KGG: Provision of 2nd entry & Development of circulating area with facade, landscaping, ramp, VIP & Physically challenged parking. 19829451/- 15253184.36 1. All items of work provided in ECR/ USSOR-2012= A-1= (+) 16%, A-2 = (-) 4%, A-3 = (-) 2% Rebate= Nil. DRM/TC/1425 Dt. 30.03.16 M/S Swata construction At + Po- Bihat, Tola – Khemkaranpur, Distt- Begusarai. 07.02.16 15.07.18 100% Sri Dinesh Kumar DEN/E/BJU Work completed. Final bill passed.

At.Khagaria -Provision of one Additional New FOB 24774062 29449907.64 1. All items of work provided in ECR/ USSOR-2012= A-1= (+) 5.20%, A-2 = (+)15%, A-3 = (+) 7.12% Rebate= Nil. DRM/TC/1825 Dt. 04.09.19 M/S Anil Kumar Simaria 31.07.19 01.01.21 80% Sri Dinesh KumarADEN/E/BJU Work in Progress
5 At KTRH – New freight terminal. 134268964/- 82566914.29 1. All items of work provided in ECR/ USSOR-2012 = Ann. A-1 (+) 20.75%, A-2 (+) 32.25%, A-3 (+) 15% & A-4 (+) 15%, Reb = Nil DRM/TC/1539 Dt. 07.04.17 M/S Surendra Singh, Sarvoday Nagar, Begusarai, Distt.- Begusarai. 10.05.17 30.06.20 40% Sri Shailesh Kumar ADEN/THB Work in progress.
6 (i) UMNR: Provision of two bay PP shelter on each platform, station approach road and development of circulating are also. (ii) At Sahebpur Kamal: Provision of one no. High level passenger platform up to standard length provision of four bay PP shelter on platform no. 02 with all required passenger amenities. Construction Org. fund. 24904054/- Rev.- 29089445.66 All items of work provided in ECR/ USSOR-2012 = Ann. A-1 (-) 7.712%, A-2 (-) 11.725%, A-3 (-) 11.725% Rebate = Nil. DRM/TC/1584 Dt. 22.08.17 Jai Manganla Construction, At + PO- Bihat, Distt.- Begusarai, Bihar, Pin- 851135 12.05.17 24.08.20 65% Sri Dinesh KumarADEN/E/BJU Work in progress.
7 Miscellaneous work line construction of three bay PP shelter, repair of rain cut/cess reapir, water booth/water supply pipe line, Mosaic tile on PF surface, development of circulating area. In DN side, brick soling on PF, LC improvement and construction of yard drain and cross drain as left over work in newly constructed Gauchhari-Narayanpur (DN) line. Construction Org. fund. 16162340.35 rev.-19712511.95 All items of work provided in ECR/ USSOR-2012 = Ann. A-1 (-) 11.07% with 0-81% rebate = (-) 11.79% on advt. value i.e (+) 1.44%,, A-2 (-) 7.02% with 0.81% rebate = (-) 7.77% on advt. value i.e (+) 6.06%,, A-3 (-) 9% with 0.81% rebate = (-) 9.74% on advt. value i.e (+) 3.80%,, Schedule ‘B’ NS-1 = Rs. 8100/- with 0.81% rebate = Rs. 8034.39 Rebate = Nil. DRM/TC/1665 dated 27.07.18 Raksha Associates, 405 A, Gour Ganga, Sec-4, Vaishali, Ghaziabad, U.P..- 201010 27.08.18 27.06.20 40% Sri Shailesh Kumar ADEN/THB Work in progress.
8 At Garhara- Sick line covered shed with EOT crane facilities. 63639896/- 3700345108/- 1. All items of work provided in ECR/ USSOR-2012= Schedjule-A-1 = (-) 6%, A-2 = (-) 5%, A-3 = (-) 5% NS-1 = Rs.106.25 NS-2 = 350/- NS-3= 125/- Rebate= Nil. DRM/TC/1724 dt.28.01.19 M/S R.K. Singh House No.-B/1, sector D/1, Kankarbagh Colony, Patna, Distt-Patna, Bihar 26.12.19 31.05.21 2% Sri Dinesh Kumar ADEN/East/BJU Work is in progress.
9 Provision of additional new FOB of 3.66 Mtrs wide at MNE & NNA 47212546/- 39913405/- 1. All items of work provided in ECR/ USSOR-2012= Schedjule-A-1 = (+) 9.25%, A-2 = (+) 9.25%, A-3 = (+) 20.75% Rebate= Nil. DRM/TC/1736 dt.14.02.19 Sri Narendra Kumar At- Veer Kunwar Singh Nagar, Katira (Ara) Distt- Bhojpur, Bihar- 802301 18.11.18 28.02.21 65% Sri Shailesh Kumar ADEN/THB Work is in progress.
10 At Thanabihpur- Proposed raising of PF No. 1 &2/3. 27700231/- 21532098/- Rev.- 27126635.55 1. All items of work provided in ECR/ USSOR-2012= Schedjule-A-1 = (+)8.96%, A-2 = (+) 4.65%, A-3 = (+) 15% Rebate= Nil. DRM/TC/1775 dt.25.04.19 M/S Swata construction At + Po- Bihat, Tola – Khemkaranpur, Distt- Begusarai. 17.06.19 31.12.20 35% Sri Shailesh Kumar ADEN/THB Work is in progress.
11 BJU-KIR:Replacement of damaged gang hut (Total - 42 units type - II units t 12 location) 29522836.75 30955037.53 1. All items of work provided in ECR/ USSOR-2012= Schedjule-A-1 = (+)35.18%, A-2 = (+) 10.62%, A-3 = (+) 16.35% Rebate= Nil. DRM/TC/1768 dt.08.04.19 Sri Chandra Chur Pd. Singh, Begusarai, Bihar 16.02.19 06.07.20 75% Sri Dinesh KumarADEN/E/BJU Work is in progress.
12 At NNA: Provition of 30 bedded barrack for RPF along with other amenities 24685126/- 14139255.7 1. All items of work provided in ECR/ USSOR-2012= Schedjule-A-1 = (-)5.7%, A-2 = (-) 2.25%, A-3 = (-) 12.60%, NS - (-)13.52% Rebate= Nil. DRM/TC/1856 dt.17.02.20 M/s Anil Kumar, Bhagalpur 03.11.19 03.07.20 10% Sri Shailesh Kumar ADEN/THB Work to start.
13 Metalizing of floor Members of open web girder & Plate girder of Br. No. 6UP & DN, 10UP, 13Up & DN, 15DN, 16DN, 19DN, 20UP & DN, 36UP & DN, 2 UP, 6UP & DN, 7UP & DN, 28UP & DN, 33UP & DN, 44UP & DN, 62UP&DN under SSE/BR/SEE under SEE div. (25 Nos.) 22445708.92 25496264/- NS-1 = 940/-, NS-2 = 228/-, NS-3 = 40/-, NS-4 = 26/-, NS-5 = 121/-, Rebate - Nil DRM/TC/1820 dt.07.08.19 Jyoti Forge and Fabrication Pvt. Ltd, Guwahati Assam 15.03.19 31.12.20 12% XEN/Br./Line/HJP Work is in progress.
14 Metalizing of floor Members of open web girder & Plate girder of Br. No. 10(15x61mm owg), 14(1x12.20), 15(4x12.20), 21(5x12.20), 22(4x12.20), 23(2x12.20) & 38(4x12.20) under SSE/Br./SEE in SEE Divn. 20653897.68 22462509/- NS-1 = 895/-, NS-2 = 216.50, NS-3 = 43.50, NS-4 = 25.50, NS-5 = 121/-, Rebate - Nil DRM/TC/1819 dt.07.08.19 Jyoti Forge and Fabrication Pvt. Ltd, Guwahati Assam 01.02.19 31.12.20 22% XEN/Br./Line/HJP Work is in progress.
15 At BGS: Provision Of one additional new foot over bridge. 22820543.37 24376508.65 Rev.-25925970.25 1. All items of work provided in ECR/ USSOR-2012= Schedjule-A-1 = (+)23.625%, A-2 = (+) 15%, A-3 = (+) 23.625% Rebate= Nil. DRM/TC/1789 dt.29.05.19 M/s Roy Construction, Begusarai 27.05.19 30.03.21 85% Sri Dinesh KumarADEN/E/BJU Work is in progress.
16 At KGG-Provision of additional new FOB. 27829343/- 26081091/- 1. All items of work provided in ECR/ USSOR-2012= Schedjule-A-1 = (+)28.80%, A-2 = (+) 28.80%, A-3 = (+) 28.80% Rebate= Nil. DRM/TC/1725 dt.028.01.19 Coxcomb Engineering India Pvt. Ltd. House No. B/1, Sector-D/1 Kankarbagh colony. P.O. Lohiya Nagar, Distt.- Patna, Bihar-800020 -- 03.09.19 0 Sri Shailesh Kumar ADEN/THB Contract terminated.
17 At SEE: Re-development of circulating area in north side of station improvement and renovation of existing waiting hall, waiting room, retiring room and toilets in connection to Re-development of station. 19536802/- 18257629/- 19811506.55 All items of work provided in ECR/ USSOR-2012= A-1= (+)8.18, A-2=2.64%, A-3= + 7.51%, Schedule “B” NS-1 - 110/-, NS-2 - 9/-, Rebate= Nil DRM/TC/1764 dt.26.03.19 Vaishnavi construction, At + PO - Sonpur, Dist. - Saran, Bihar - 841101 10.12.18 31.03.21 25% Sri Manikant ADEN/Land/SEE Work is in progress.
18 At SEE: Construction of new station building including home platform in connection with Re-development of station. 67308455/- 63991379/- All items of work provided in ECR/ USSOR-2012= A-1= (+)10.48, A-2=3.79%, A-3= + 8.62%, Schedule “B” NS-1 - 110/-, NS-2 - 9/-, Rebate= Nil DRM/TC/1751 dt.05.03.19 Rohan construction Pvt. Ltd. C/O- Rajnish Tripathi Opp. Chiran Mill, Hawai Adda Road, Parrevwa, Ward No. 01, Raxaul, West Champaran, Bihar- 845305 16.12.18 31.03.21 40% Sri Manikant ADEN/Land/SEE Work is in progress.
19 At SEE: Improvement of PF surface on PF No.3 & 4, Provision of stainless steel benches on platforms and 01 No. Elevator in connection to re-development of Sonpur station 18636418/- 16963964/- All items of work provided in ECR/ USSOR-2012= A-1= (+)4.75, A-2=2.52%, A-3= +7.24%, Rebate= Nil DRM/TC/1763 dt.26.03.19 Vaishnavi construction, At + PO - Sonpur, Dist. - Saran, Bihar - 841101 16.12.18 30.06.20 85% Sri Manikant ADEN/Land/SEE Work is in progress.
20 At SEE:- Prov. Of 01 Nos RCC over head tank of 50000 gallan capacity with tube well and connected pipe lines. 12563942/- 13026055/-16284345.77 1. All items of work provided in ECR/ USSOR-2012= (+) 19%2. NS-1 = 7000/-, NS-2 = 6000/-, NS-3 = 50/-, NS-4 = 5600/-, NS-5a =1800/-, b. 1800/-, c. 1800/-, d. 1800/-, e. 1800/-, NS-6a = 5100/- b. 4500/- c. 4100/- d. 2000/- e. 1800/- f. 1800/- g. 2000/- h. 2000/- NS-7 = 180/- NS-8 =1800/- NS-9a= 1500/- b. 1500/-, NS-10 = 1500/-Rebate= Nil. DRM/TC/1371 Dt. 14.12.15 Aditya Arav Dev Const. Co. Pvt. Ltd. , Sri Laxman Singh, Mahuda More, Ram Nagar Garh, Distt- Dhanbad. 11.10.15 30.09.18 95% Sri Manikant ADEN/Land/SEE Work in progress. Extension of DOC required from agency
21 At Hajipur: Construction of 02 nos RCC over head tank (capacity – 10000 Gallon of each tank) at Konhara Ghat and Ramashish Chowk Construction Org. fund. 31628311/- 35583530/- All items of work provided in ECR/ USSOR-2012 = Ann. A-1 (+) 39%, A-2 (+) 25.0%, A-3 (+) 25.0% All NS- (+) 5.0%, Rebate = 3.95% DRM/TC/1634 Dt. 27.04.18 Construction & Construction, At- Opp. BSP Bhawan, Asiyana- Digha Road, Distt.- Patna- Bihar – 900025 02.02.18 31.10.20 70% Sri Manikant ADEN/Land/SEE Work in progress.
22 At SEE – Provision of one additional new 6.0 m wide foot over bridge. 58620118/- 58891317.03 All items of work provided in ECR/ USSOR-2012 = Ann. A-1 (+) 21.90%, A-2 (+) 9.25%, A-3 (+) 15%, Rebate = 3.95% DRM/TC/1792 Dt. 14.06.19 Coxcomb Engineering India Pvt. Ltd, Kankarbagh, Patna 27.11.19 31.12.20 35% Sri Manikant ADEN/Land/SEE Work is in progress.
23 At SEE-Construction of crane shed at Sonpur Yard. 23040079 28228590 All items of work provided in ECR/ USSOR-2012 = Ann. A-1 (+) 25%, A-2 (+) 15%, A-3 (+) 15%,B=(+)7% LOA No.04SEE19-20-07/0118706307651 Dt.06.10.19 M/s Jogender Prasad Singh,Saran
05.09.20
Sri Manikant ADEN/Land/SEE LOA Issued.
24 At SEE:- Provision of 30 bedded G+1 barrack for RPF in South entry side of station in connection with development of circulating area (2) Proposed construction of store and office accomodation of SSE Work Sonpur & ADEN/Land/SEE. 22635912 20185450 All items of work provided in ECR/ USSOR-2012 = Ann. A-1 (-)9.50%, A-2 (-)5.90%, A-3 (-)9.50%,Rebate= 2.03%. LOA No.16SEE19-20-600937330020446 Dt.16.06.20 M/s OM Shanti Enterprises.Patna
13.05.21
Sri Manikant ADEN/Land/SEE LOA Issued.

Engineering Department










1 At MFP Jn: Proposed repairs to colony approach road surface, raising and repair of existing drain with provision of sump & pump house including raising of surrounding area of quarters by earth filling in Brahampura Railway colony 18292762 18734335.00 All items of work provided in ECR/USSOR-2012 A-1(+)2.50%,A-II-(+)2% & A-III(+) 2.5% DRM/TC/1499, dt. 22.09.16 Maheshwar Kshtreshwari Const. 03.01.17 03.03.2020 35.00% Md.Abdus shamad Work in Progress.
2 At MFP: Repair of Zonal training hostel, kitchen, dining hall, bathroom, water closet, flooring wall & roof etc. 13489320 11202650 Revised to Rs. 1,56,85,480/- All items of work provided in ECR /USSOR-2012 A-1(-) 5.60%, A-II-(+)5% & A-III At Par DRM/TC/1647, dt. 08.06.18 Ashit Ghosh 24.01.18 15.02.2020 90.00% Md. Abdus Shamad Work in Progress.
4 Improvement of drainaged system, sanitary system, park benches, septic tank and boundary wall from station to mal Godown gate and circulating area 11731134 12031134 Revised to Rs.1,39,75,409/- All items of work provided in ECR /USSOR-2012 A-1(+)26.5%, A-II-(+)25.35% & A-III 25.35% W/362/MFP/Imp. Work/TC/2333 dt. AMI builtech Pvt. Ltd. 30.10.18 26.12.2020 60% Md. Abdus Shamad Work in Progress.
5 At NRPA: Repairing of boundary wall, road drain and goods shed under jurisdiction of ADEN/South/MFP 11181436 11100930 All items of work provided in ECR/USSOR-2012 A-1(+)14.17%,A-II-(+)14.17% & A-III (+)14.17%r W/362/NRPA/Repairing/TC/2360 dt.01.10.18 M/S/ Sonali Const. 27.10.18 30.06.2020 100% Md. Abdus Shamad Work completed.
6 At MFP: (i) Repairs to damaged boundary wall and road at GRP barrack (ii) Repairs to damaged colony road and colony approach road to Loco colony & (iii) Improvement and repairs of Lichi Bagan Rly. Colony. 11982738 11623255 Finalized at Rs. 71,69,443/- All items of work provided in ECR/USSOR-2012 A-1(+)11.55%,A-II-(+)11.55% & A-III (+)11.55% W/362/MFP/repair Work/PP Shelter/TC/2540 M/S CRG Nirmala Enterprises. 21.12.18 15.05.2020 61.68% Md. Abdus Shamad Work completed.
8 Repairs of leaky roof of station Building and residential building under jurisdiction of ADEN/S/MFP. 17698205 12034748 Finalized at Rs. 1,57,56,242/- All items of work provided in ECR /USSOR-2012 A-1(-) 32%, A-II-(-) 32% W/362/HJP-MFP-SPJ/Repairs/Leaky Roof/TC /2123 dt. 29/30.08.18 OM shanti Enterprises. 12.02.2019 20.05.2020 100% Md. Abdus Shamad Work Finalised
9 Improvement of yard drain at Dholi & Karpoorigram. 13866729 1,52,30,017.28 All items of work provided in ECR /USSOR-2012 A-1(+) 26.477%, A-II-(+) 25.327% & A-III (+)26.477% above DRM/TC/1847 dt. 17.01.2020 Bhushan Construction Work started 15.02.20 15% Md. Abdus Shamad Work started
10 Water treatment & Re-Cycling plant in Coaching depot at MFP& BJU. 23719697 24165841.49 All items of work provided in ECR /USSOR-2012 A-1(+) 33.40%, A-II-(+) 34.55% & A-III (+)25.35% ,above SEE DIV-Engg/08SEE19-20-02 M/S AXIOM INDIA,Bilaspur Work started 08.12.2020 25% Md. Abdus Shamad Work started













Engineering Department
1 Repairs to badly damaged wooden doors, windows and wire gauge shutters of staff/officers quarters in SSE/W/SEE jurisdiction 10052816 11939000 All items of work provided in ECR/ USSOR-2012 = Ann. A-1 (+) 24%, A-2 (+) 21%, A-3 (+) 18% Rebate- Nil DRM/TC/1816, dt. 05.08.19 Sri Nageshwar Prasad sing, At + P0- Thathan Buzurgh, Sarai, Vaishali, Bihar 844125 01.06.19 29.02.20 25% Sri Manikant Kumar ADEN/Land/SEE Work stopped.
2 At Sonpur : Repairs and improvements of toilets, flooring, doors and windows, kitchen, dining hall, saluting dias, parking stand and vehicle shed of RPF barrack in Hariharnath and Barbatta colony under SSE/Works/Sonpur jurisdiction. 12723728 12608282 1. All items of work provided in ECR/ USSOR-2012= Schedjule-A-1 = (+)25.35%, A-2 = (+25.35%, A-3 = (+)15% Rebate= Nil. DRM/TC/1715, dt. 27.12.2018 R.M Group of Co., At – SDO Road, Andar Kila, Hajipur, Bihar 21.08.18 31.05.20 60% Sri Manikant Kumar ADEN/Land/SEE Work stopped.
3 At Hajipur: Maintenance of all parks at New GM Building & Old GM Building campus for 36 months. 18997643 19928625 All items of work provided in the ECR USSOR-2012. Schedule-A (+) 20.75% DRM/TC/1796, dt. 08.07.19 The Agri Horticultural Society of India 1, Alipore Road, Kolkata, West Bengal-700027 28.03.19 27.03.22 40% Sri Manikant Kumar ADEN/Land/SEE Work in Progress.
4 Repairs to damaged beams, sunshades and ceiling of DRM office including swirling, drainage arrangements and improvements to campus and parking stand at Sonpur 12764711 14615548.67 All items of work provided in ECR/ USSOR-2012 = Ann. A-1 (+) 31.67%, A-2 (+) 31.67%, A-3 (+) 31.67% Rebate- Nil DRM/TC/1855, dt. 17.02.20 M/S R.M Group of Company 20.10.19 07.09.20 30% Sri Manikant Kumar ADEN/Land/SEE Work in Progress.
5 Repairs to officer's club and swimming pool at Sonpur (2) Proposed repairs to badly leaking AC Sheet roofing, damaged flooring doors and windows, provision of kitchen and separate toilets and separate toilets of dharohar kala mandir. 19729144 18116116.1 All items of work provided in ECR/ USSOR-2012 = Ann. A-1 (-)9.50 %, A-2 (-) 4.90 %, A-3 (-) 4.90 % Schedule 'B' = At par. Rebate Nill DRM/TC/1863,dt. 15.06.2020 M/S OM Shanti Enterprises 27.02.20 25.02.21 60% Sri Vikash Dutta ADEN/Spl/SEE Work in Progress.
6 At Hajipur: Improvement of outer campus of GM building at Hajipur (HQ) 12138927 11970028.41 All items of work provided in ECR/ USSOR-2012 = Ann. A-1 (+)0.51 %, A-2 (-) 15 %, A-3 (-) 51 % , Rebate Nill 11SEE19-20-10, dt. 27.02.2020 M/S National Carriers and Contt. 10.06.20 25.11.20 10% Sri Manikant Kumar ADEN/Land/SEE Work in Progress.
7 Improvement of Officer's chamber and departmental offices of GM building at Hajipur (HQ) 11747311 10521717.08 All items of work provided in ECR/ USSOR-2012 = Ann. A-1 (-)12 %, A-2 (-) 14 %, A-3 (-) 9 % , Schedule 'B' At par, Rebate Nill 12SEE19-20-03, dt. 30.03.2020 Sri Shailendar Kr. Singh 02.06.20 29.12.20 30% Sri Manikant Kumar ADEN/Land/SEE Work in Progress.
8 At Hajipur: Repairs to Garrage, Fencing and barbed wires fancing top of boundary wall at Konharaghat Railway colony. 12192102 12008005.21 All items of work provided in ECR/ USSOR-2012 = Ann. A-1 At par %, A-2 At par %, Rebate 1.51% 11SEE19-20-11, dt. 06.03.2020 M/S National Carriers and Contt. 30.06.20 05.12.20 15% Sri Manikant Kumar ADEN/Land/SEE Work in Progress.
9 At Sonpur- widening of existing approach Roads to 2nd entry and DRM Offices including entry arch, grills and walkway from bhawari and Rahar Diyara chowk at Sonpur 17538384 17257770.34 All items of work provided in ECR/ USSOR-2012 = Ann. A-1 At par %, A-2 At par %, Rebate 1.51% 12SEE19-20-08, dt. 30.03.2020 M/s Ashutosh Infraprojects Pvt. Ltd. 20.06.20 29.09.20 30% Sri Manikant Kumar ADEN/Land/SEE Work stopped.
10 At BJU: Extension of Sick line Shed,Boundary wall and road in washing pit. 27,521,646 25501187 All items of work provided in ECR/USSOR-2012 A-1(+)12.41%,A-II-(+)16.06% & A-III (+)3.25% DRM/TC/1744 dt.26.02.19 Rajiv Ranjan 19.02.19 31.10.2020 60% Sri Anil Kumar ADEN/W/BJU Work in Progress.
11 At BJU:Repairs to approach road of LC no. 6 to running room (South side of station) and RPF barrack No. 2 to DRM camp office/officer rest house including taxi/cycle stand and improvement of part of circulating area 13,094,500 10041611 All items of work provided in ECR/USSOR-2012 A-1(-)12.05%,A-II-(-)10.55% & A-III (-) 10.44% DRM/TC/1821, dt. 13.08.19 Sri Raushan Ray 10.07.19 30.09.20 100% Sri Anil Kumar ADEN/W/BJU Final bill awaited
12 At BJU: Resurfacing of badly damaged PF surface at PF No. 6 & 7 including Saloon siding by Kota stone 16,637,063 12559319 All items of work provided in ECR/USSOR-2012 A-1(-) 13.19%,A-II-(-) 13.19% & A-III (-)13.19% DRM/TC/1813, dt. 02.08.19 Mukund Kr. Singh & Co. 26.06.19 31.07.20 70% Sri Anil Kumar ADEN/W/BJU Work in progress
13 At BJU: repairs to damaged roof of PP shelter of PF No. 04 & 05 14,245,822 12157624.96 All items of work provided in ECR/USSOR-2012 A-1(-) 2.25%,A-II (-) 4.55% & A-III (-)6.36% DRM/TC/1854, dt. 12.02.20 M/S Roy Construction, At- Hajipur, P.O.- Pipra Dewas, P.S.- Barauni, Distt- Begusarai (Bihar) 16.01.20 15.06.20 100% Sri Anil Kumar ADEN/W/BJU Work completed. Final bill passed.
Engineering Department
1 HJP-MFP-SPJ Section : CTR/P of existing rail with 60 Kg. 90 UTS new rail Total = 36.745 Kms. Total TRR/P = 3.950 Kms. 24199800/- 28743137/- Revised to 32411205 NS item + 29 % of SOR item + 5 % DRM/TC/1187 dt. 11.1.13 M/S Eleco Const. Pvt. Ltd. Krishna Nagar Begusarai 25.12.12 31.06.16 100% Md. Abdus Samad ADEN/S/MFP Work physically completed.
2 CTR(P) of existing rail (72/90UTS) on PSC sleeper with new 60Kg 90UTS rail & PSC-6 sleeper 1660 nos per KM in single line from KM 0.00-1.80, 26.88-31.89 & 32.89-40.40 in HJP-MFP section. Total= 14.32 Km 13821200 18240944 NS items as per appd rate DRM/TC/1282 dt. 17.11.14 Eleco Constn. Pvt Ltd., Sri Krishna Nagar, Begusarai. 10.10.14 31.12.16 100% Md. Abdus Samad ADEN/S/MFP Final bill passed on 11.10.18.
3 SEE Divl.:- Manning of unmanned level crossing 14 nos. between MNE Jn. KTRH station under Sr. DEN-II Jurisdiction. 27492805/- 25910619.24 1. All items of work provided in ECR/ USSOR-2012= A-1= (+)7.2,A-2=18%, A-3= + 9% Schedule “B”= 18% Rebate= 1.80%. DRM/TC/1376 dt. 29.12.15 Raksha Associates, 405 A, Gour Ganga, Sec-4, Vaishali, Bhaziabad, U.P..- 201010 09.10.15 28.10.16 100% Sri Dinesh Kumar DEN/E/BJU& Sri Shailesh Kumar ADEN/THB Final bill passed on 18.07.18.
4 SEE Div.:- Manning of unmanned level crossing 09 Nos between HJP(ex) BCA station via MFP under DEN-III Jurisdiction 58069500/- 18554460 1. All items of work provided in ECR/ USSOR-2012= A-1= (+) 18%, A-2 = (+) 18%, A-3 = (+) 18% & Schedule B (+) 29% Rebate= Nil. DRM/TC/ 1467 dt. 11.07.16 M/S Genius Const. Laxmipur, Ander Dhala, Siwan, Distt.- Siwan. 06.07.16 31.01.19 90% Md. Abdus Samad DEN/S/MFP & Sri Sanjay Kumar ADEN/W/BJU Work physically completed. Final bill awaited
5 Making PQRS siding, cess repair & Incidental temporary work in Bachhawara – Hajipur (Single line) Section & Sonpur – Chhapra Kacheri (UP) Section in connection with CTR(P) work in Bachhawara – Hajipur (Single line) and CTR(P) & TRR(P) work. 23747562/- 30151508/-/42153059/- 1. All items of work provided in ECR/ USSOR-2012 Ann. A = (+) 29.73% (+) 15% Rebate= 2.13%. (+) 46.01% DRM/TC/1528 dt. 25.01.17 Mahnar Infratech Pvt. Ltd. House no.- 275, Road No.-5, Rajput Nagar, Hajpur, Distt.- Vaishali. 13.12.16 08.05.19 100% Sri Sogarath Paswan ADEN/L/SEE Final bill passed on 29.04.2020
6 SEE Div.:- SEE – CI Up line section (1) CTRP of existing 02 Kg. – 20 UTS rail on PSO- 5 M 7 sleeper density by new 60Kg. -90 UTS rail with PSC – 6 1660 nos/ Km. S/6 6 per density at Km. 271.59 – 302.00 305.586- 311 . 468, 215.0 316.472, Total 36.232 Km. With 60 Kg. – 90 UTS rail on PSC- 6-2 TRR P of existing 52 Kg. – 90 UTS rail on PSC – 6m 72 sleeper density by new 60 Kg. 90 UTS rail on existing PSC- 6 6 1540 Nos/ Km sleeper at Km. 302.00 – 305.586, 311. 468-315.00, 316.472- 319.91 Total 10.558. 23747562/- 27974520/- 1. All items of work provided in ECR/ USSOR-2012= (+) 20.75% 2. NS-1 = 11.48/-, NS-2 = 44.88/-, NS-3 = 25.47/-, NS-4a = 71.23/-, NS-4b= 61.23, NS-5 = 47.67, NS-6 = 42.95/-, NS-7 = 49.70/-, NS-8 = 41.75/- NS-9 = 237.50/- NS-10 = 57.23/- NS-11 = 94.43/-, NS-12 = 27.47/-, NS-13 = 29.47/-, NS-14 = 9000/-, NS-15 = 447.50/-, NS-16 =56.10/-, NS-17 = 31.50/-, NS-18 = 30.75/-, NS-19 = 643/-, NS-20 = 4433.33/-, NS-21 = 10.20/-, NS-22 = 38.25/- & NS-23 = 8/- Rebate= Nil. DRM/TC/1537 Dt. 29.03.17 Eleco Constn. Pvt Ltd., Sri Krishna Nagar, Begusarai. 14.11.16 31.01.20 50% Sri Sogarath Paswan ADEN/L/SEE Work in progress. Extension of DOC required from agency
7 Hajipur – Samastipur(ex) – Barauni section: Maning of unmanned level crossing 05 nos. in EC railway under Sonpur division 18 nos. only. 13078801/- 14322595/- 1. All items of work provided in ECR/ USSOR-2012 = Ann. A (+) 25.936%, Rebate = Nil. DRM/TC/1546 dt. 28.04.17 Sri Aditya Kumar, At + PO- Pokharaira, Distt.- Samastilpur, Bihar. 04.03.17 31.10.20 60% Md. Abdus Samad ADEN/S/MFP Work in progress. Extension of DOC required from agency
8 BCA-HJP : CTR(P) of existing 52 kg. 90 UTS rail on PSC -5 M-7 sleeper by new 60 kg 90 UTS rail on PSC-6-1660/km sleeper from km. 146.26-266.26 (Total-70 Km.) 45882934/- 48177081/- At par DRM/TC/1533 dt. 20.02.17 Eleco Constn. Pvt Ltd., Sri Krishna Nagar, Begusarai. 29.12.16 10.04.19 90% Sri Sogarath Paswan ADEN/L/SEE Work in progress.
9 Between BJU- SPJ (ex) – MFP – HJP (ex) Section: Electrical fitting barriers with date logger & Integrated power supply system at block section Interlocked gates (20 nos) (provision of building for Battery, Relay, DG set etc) S&T fund. 17669324/- All items of work provided in ECR/ USSOR-2012 = Ann. A-1 (+) 27.0%, A-2 (+) 24.0%, A-3 (+) 18.0% Rebate = Nil. DRM/TC/1590 Dt. 03.10.17 Sri Navin Kumar Singh, At- Gyan Lok Marg. Brahampura, Muzaffarpur, Bihar, 842003 07.03.18 22.08.20 80% Sri Sanjay Kumar ADEN/W/BJU&Md. Abdus Samad ADEN/S/MFP Work in progress.
10 Transportation of New P.Way material in connection with CTR(P) and TRR(P) of Sonpur Chhapra Kachehri (Up line) section. 10315215/- 12480378/- All items of work provided in ECR/ USSOR-2012 = Ann. A- (+) 20.99%, Rebate = Nil. DRM/TC/1618 dt. 27.02.18 Manshi Services 19A/8, Seal lane Kolkata, West Bengal Pin 700015 19.12.17 30.11.20 65% Sri Sogarath Paswan ADEN/L/SEE Work in progress.
11 Hajipur-Chhapra kachehri (UO& DN) section:- (i) TBR (Deep screening required to provde 300 mm clear cushion in track in UP main line, km. 266.26-267.565 & in DN line from km. 295.13-319.91 Total- 24.78 km. 78510425/- 10044988/- 1. All items of work provided in ECR/ USSOR-2012= 2. NS-1 = 32.50/-, NS-2 = 8.30/-, NS-3 = 30/-, NS-4 = 26/-, NS-5 = 24.60, NS-6 = 601/-, NS-7 = 17.75/-, NS-8 = 55/- NS-9 = 37/- NS-10 = 185/- NS-11 = 30000/-, NS-12 = 19500/-, NS-13(a) = 28/-, NS-13(b) = 20/, NS-14 = 13500/-, NS-15 = 600/- Rebate= Nil. DRM/TC/1619 dt. 16.03.18 M/S Rakesh Construction, At Milki Araith, Ara, P.S- Anaith, Distt-Bhojpur, Bihar-802301 19.02.18 30.08.19 100% Sri Sogarath Paswan ADEN/L/SEE Final bill passed on 20.08.19
12 Samastipur(EX)- Muzaffarpur-Hajipur(EX)- Total=83.72 kms Assisting Ballast cleaning machine (BCM) for deep screening work and manual deep screening of track (A) In DN line between km. 36/13-41; 47/6-48/8-9, 54/11-55/14,60/11-61/12, 67/10-78/6 & 80/7-86/7 Total=25.20 kms. (B) In UP line between km. 39.9-40.08, 40.33-92.96 Total=58.52 kms. 14441601/- 19695575/- 1. All items of work provided in ECR/ USSOR-2012= (+) 33.50% 2. NS-1 = 22/-, NS-2 = 5/-, NS-3 = 22.50/-, NS-4 = 26/-, NS- 5 = 535, NS-6 = 23/-, NS-7 = 215/-, NS-8 = 71/- NS-9 = 24/- NS-10 = 25 /- NS-11 = 4000/-, NS-12 = 11000/-, NS-13a = 95/-, NS-13b = 70/-, NS-14 = 55/-, NS-15 = 27.50/-, NS-16a =2000/-, NS-17a = 15000/- Rebate= Nil. DRM/TC/1626 dt. 22.03.18 M/S Deo Nandan Singh & Sons, At- Bihat, Zero Mile, PO- Barauni Urvarak Nagar, Barauni, Distt- Begusarai rod, Bihar 851115 16.01.18 08.07.19 20% Sri Surendra Kumar ADEN/S/MFP Final bill passed contact closed on administrative goound
13 Repairs to road surface, fencing, gate lodge etc. of LC in the section of ADEN(W)/BJU 10803489/- 12104097/- 1. All items of work provided in ECR/ USSOR-2012= Schedjule-A-1 = 25.925%, A-2 = 25.33%, A-3 = 25.33% NS- 1 = 2625/-, NS-2 = 33/- Rebate= Nil. DRM/TC/1684 dated 12.10.18 M/S Bhushan Construction, At- Barauni-2, Ojha Tola, Begusarai 06.08.18 30.10.19 100% Sri Sanjay Kumar ADEN/W/BJU Final bill passed on 06.04.2020
14 Improvement of gate lodge, trolley refuge, road surface, fencing winch shed, water closet etc. of LC under jurisdiction of ADEN(S)/Muzaffarpur. 11316680/- 12866515/- 1. All items of work provided in ECR/ USSOR-2012= Schedjule-A-1=30.82%, A-2=30.82%, A-3=30.82% NS- 1=2550/- Rebate= Nil. DRM/TC/1685 dated 12.10.18 M/S Bhushan Construction, At- Barauni-2, Ojha Tola, Begusarai 22.11.18 29.01.20 90% Md. Abdus Samad ADEN(S)/MFP Physically work completed. Final bill awaited.
15 Between Bachhwara(ex) – Chhapra Gramin(ex)- Repairing of damaged road surface of LC and reparing of gate lodge, fencing, hand pump etc. 9889489/- 11831378/- 1. All items of work provided in ECR/USSOR-2012= Schedjule-A-1 = (+) 38%, A-2 = 33.40%, A-3 = 15% Rebate= Nil DRM/TC/1723 dt. 17.01.19 Sri Ravi Kishor Singh, At- :Paharichak, Sonpur, Po- Ps- Sonpur 21.12.18 30.05.20 70% Sri Sogarath Paswan ADEN/L/SEE Work in progress.
16 Sonpur Division : Manning of Unmanned level crossing No. 2C between Mansi – Badlaghat, 9HC between Naugachia – Katariah, 9AC between Katareah- Kursela and 19C between Baragopal – Dighwara. 11249918/- 10295984/- 1. All items of work provided in ECR/ USSOR-2012= Schedjule-A-1 = (+) 41.45%, A-2 = 31.10%, A-3 = 41.45% NS-1 = 220213/- NS-2 = 90/- NS-3= 15000/- NS-4 = 2000/- NS-5 = 3400/- NS-6 = 1800/- NS-7 = 50/- NS-8 = 350/- NS-9 = 9500/- NS-10 = 750/- NS-11 = 175/- NS-12 = 4000/- NS-13 = 60/- NS-14 = 600/- NS-15 = 600/- NS-16 = 7000/- NS-17 = 30/-Rebate= Nil DRM/TC/1689 dt.24.10.18 Om Shanti Enterprises, F-2/10, PC Colony, Kankarbagh, Patna, Distt. – Patna, Bihar. 19.09.18 06.02.19 100% Sri Sogarath Paswan ADEN/Line/SEE Sri Shailesh Kumar ADEN/THB Work completed. Final bill passed.
17 SPP-HJP (Single line section ) cess reapair works under SSE/Work/SPP. 11307030/- 10117530/- 1. All items of work provided in ECR/ USSOR-2012= Schedule-A-1 = (+) 38%, A-2 = 33%, A-3 = 15% Rebate= Nil DRM/TC/1746 dt. 01.03.19 Sri Subash Kr. Yadav At. 34 sanjay Nagar Road Post office GPO Patna Pin code 800001 12.03.19 30.10.20 61% Sri Sogarath Paswan ADEN/Line/SEE Work in progress.
18 Imrovement of Level crossing approach road connecting LC No 14/C to 15/C through circolating area of KHQ Rly stn 13655933 11770058 Revised 11820393/- 1. All items of work provided in ECR/ USSOR-2012= Schedule-A-1 = (+) 9.25%, A-2 = 9.25%, Rebate= Nil DRM/TC/1791 dt. 12.06.19 Ma Bhakdrakali Enterprises At-Kushahara, Nandpur, Siwan 21.04.19 31.07.20 55% Sri Shailesh Kumar ADEN/THB Work in progress.
19 Hajipur(ex)-Chhapra kachhari (DN line): TRR(P) of existing 52kg /90UTS rail on PSC-6 sleeper with new 60kg/90UTS rail Dn line from Km 272.50-285.00, 290-00-299.00, 303.00-310.00, 314.00-319.78 Total 34.88 Km. 11249918/- 16522767 1. All items of work provided in ECR/ USSOR-2012= Schedjule-A-1 = (-) 50%, NS-1 = 11/- NS-2 =105/- NS-3= 25/- NS-4 = 65/- NS-5a =60/-,5b=105, NS-6 = 18/- NS-7 = 55/- NS-8 = 55/- NS-9a = 165, 9b=117/,- NS-10 = 100/- NS-11 = 9910/- NS-12 = 18000- NS-13 = 90/- NS-14 = 925/- NS-15a = 380/- NS-15b= = 400/- NS-15c = 150/-, NS 16=7500/-NS17=20/-, NS18=R150/ DRM/TC/1850 dt. 17.01.20 M/s Rajiv Kumar Baro Bishanpur Tola, Fulwaria , Distt- Begusarai 16.12.19 15.12.20 30% Sri Sogarath Paswan ADEN/Line/SEE Sri Shailesh Kumar ADEN/THB Work in progress
20 Between BCA (ex)Hjp(ex) Section Repair to LC road between BCA(ex) HJP(ex) under SSE/W/SPP 17241759 18093501 1. All items of work provided in ECR/ USSOR-2012 With upto date correction as per schedule-A ,Annexure USSOR-2010-1-Ver -2012 DRM/TC/1834 dt. 17.10.19 M/S Mukund kumar Singh& Co. At +PO Ramdiri,Nakti Tola ,Distt- Begusarai 01.11.19 18.07.20 65% Sri Sogarath Paswan ADEN/Line/SEE Work in progress

Engg.Department










1 Repair to damaged drain in KGG, BGS,& GHZ Yard. 11991590 14965504.32 All items of work provided in ECR/USSOR-2012 A-(+)30% and Rebate=4% DRM/TC/1469 dt. 14.07.16 Sri Arbind kumar Singh, Sonpur, Distt-Saran(Bihar) 02.12.17 27.08.20 40% Sri Dinesh Kumar AEN/E/BJU Work in progress
2 At KGG: Re-Construction of damaged drain into RCC from Rajendra Chowk to Bakhri Bus stand under jurisdiction SSE/W/KGG. 11974983 11793210.56 All items of work provided in ECR/USSOR-2012 A-1 (+)13.84%,A-II-(+)9.25% & A-III(+)14.89% DRM/TC/1750 dt. 05.03.19 Sonali Const., AT-Narayanagar Dularpaur, Distt-Begusarai. 28.02.19 30.11.20 55% Sri Shailesh Kumar ADEN/THB Work in progress
3 (i) At Semapur: Repairs to damaged wharf surface and apporach road (ii) At Naugachia: Repairs to damaged wharf surface and approch road. 13622702 23910222.97 All items of work provided in ECR/USSOR-2012 A-1 (+)3.5% DRM/TC/1759 dt. 19.03.19 M/s G.K Const., AT-Bihat, Distt-Begusarai. 07.07.19 28.02.21 35% Sri Shailesh Kumar ADEN/THB Work in progress