BRIEF DESCRIPTIONS OF ENGINEERING DEPTT.

ROUTE KILOMETERS:

 

Item

Electrified

Non-Electrified

Total

Route Kilometers

Single Line

24.697

294.741

319.438

Double Line

475.http://www.ecr.indianrailways.gov.in//view_section.jsp?id=0,2,266,1166,116705

0.80

475.85

Total

499.747

295.55

795.288


ROUTE KILOMETER GROUP WISE :

 

Sl.

 

Electrified

Non-Electrified

Total

1.

Group ‘B’

383.60

0.80

384.40

2.

Group ‘E’

116.147

294.741

410.888

Total Route Kilometers

499.747

295.55

795.288

 

ASSETS DETAILS:

Sl. No.

Item

Danapur Division

1

Track Kilometers

1620.552

2.

Equated Track Kilometers

2625.025

3.

Integrated Track Kilometers

.2101.38

4.

Steepest Ruling Gradient

1: 200

(JAJ-KEU )

5

Sharpest Degree of Curve

Main Line

4.00 deg. (km. 536/7-11) JAJ-PNBE

Branch Line

8.00 deg.

(Km.0/2-7 in Dildarnagar– Tarighat section)

6.

No. of Stations

213

Stations

78

Halts

119

Flag

16

CURVES:

 

Curve

Main line

Branch line

Total

Remarks

 

Upto1.0º

100

69

169

 

Upto2.0º

19

43

52

 

Upto3.0º

06

19

25

 

Upto4.0º

01

09

10

 

Above 4.0º

00

07

07

 

TOTAL

126

124

250

 

 

 

INFRASTRUCTURE:

 

BRIDGES:

 

Section

Important

Major

Minor

Total

Main line

07

108

477

592

Branch line

03

96

732

831

TOTAL

10

204

1209

1423

 

 

 

 

 

 

 

 

LEVEL CROSSING:

 

Danapur Division

 

Class

Traffic

Engg.

Total

Special Class

01

06

07

‘A’Class

09

03

12

‘B’Class

28

16

44

‘C’Class ( Manned)

33

96

129

 

‘C’Class (Unmanned)

02

63

65

 

‘D’Class

06

42

48

TOTAL

79

247

305

 

QUARTERS:

 

Non Std.

Type – I

Type – II

Type – III

Type – IV

Type – V

Total

 

308

3527

2250

347

200

29

6691

 

MODEL STATIONS:

 

- Total no. of Model Station-22

 

(Jhajha, Jamui, Kiul, Lakhisarai, Nalanda, Biharsharif, Rajgir, Bakhtiyarpur,Mokama, Barh, Patna Saheb, Rajendranagar,Patna Jn, Phulwarisharif,Danapur , Ara, Dumraon, Buxar, Nawada, Sheikhpura, Jehanabad Dildarnagar & Dumrao)

MODERN STATION:

 

-Total no. of Modern Station-12

 

(Danapur, Dumraon, Barh, Bakhtiyarpur, Lakhisarai, Kiul, Jamui, Patna Jn., Rajendranagar, Mokama, Buxar & Ara)

ADARSH STATION:

- Total no. of Adarsh Station-11

(Biharsharif, Patna Saheb , Jehanabad, Ara, Dildarnagar, Hisua,Nawada, Sheikhpura , Warsaliganj, Tehta & Dumraon)

DIVISIONAL WORK LOAD AS ON 01.12.2014:

 

 

DIVISIONAL WORK LOAD SECTION WISE:(as on 01.12.14)

 

 

S.N.

Section

Route Kilometer

Track Kilometer

ETKM

ITKM

1

Jhajha-Patna (Main Line)

179.03

492.51

838.576

670.825

2

Patna-Mughalsarai(Main Line)

204.57

562.482

958.414

766.767

3

Patna-Gaya

90.80

198.30

276.225

220.979

4

Kiul-Gaya

122.00

135.06

180.749

144.5996

5

Bakhtiyarpur-Rajgir

54.00

62.00

83.00

66.399

6

Mokama-Simaria

11.90

14.25

18.33

14.64

7

Dildarnagar-Tarighat

19.00

20.79

29.00

23.37

8

Fatuha-Islampur

43.35

46.35

82.340

65.872

9

Patna Sahib-Patna Ghat

1.36

11.06

14.2

12.2

10

Patna – Digha Ghat

8.95

11.39

13.150

10.52

11

Rajgir – Tilaiya

46.081

50.953

111.280

89.023

12

Kiul – Bhagalpur

0.80

1.60

. 2.460

1.96

13

DNR-Patliputra-PWS

13.447

13.447

17.30

13.84

 

Total

795.288

1620.552

2625.024

2101.38



MAJOR ACHIEVEMENTS OF YEAR 2014-15 (Engg deptt.) upto Nov’14

 

1.SPEED RAISING:

 

ØSectional speed of Gaya-Chakand /DN line has been raised from 75 kmph to 100 kmph in PNBE-GYA section. Thus 2.44 minutes time has been saved.

ØSpeed on Turnouts between Barauni-Rampurdumra station have been raised from 15 kmph to 30 kmph. Thus 3.00 minutes time has been saved.

2.SCRAP DISPOSAL:

 

4546.296 MT Scrap has been offered during the year, against the annual target of 3700 MT. Thus division has surpassed the annual target of 3700 MT by 22.87%.

 

3.SUNDRY EARNING:

1240.68 lakh has been earned from Sundry earning during the year, against the annual target of 1000.00 lakh. Thus division has surpassed the annual target of 1000.00 lakh by 24.07%.

4.PASSENGER AMENITY WORKS:

 

Following important passenger amenities works completed during the year:

i.Waiting Hall:

Waiting Hall at Gahmar has been improved by providing mosaic/glazed tiles.

ii.PF surface :

06 no.PF surface have been improved in the division( PPN-1,Mahuli.H-1,Jatdumri.H-1Neema.H-1,DNR-1,RDUM-1).

iii.PF extension :

PF width of Barh/DN PF has been extended in HWH end.

iv.PF shed:

03 NOs PF shed have been renovated in the division(PNBE-2,HTZ-1).

 

v.Low cost shed over benches on platforms:

Ø98 nos. Low cost shed over benches on platforms have been provided at various stations under Danapur Division. Station wise break-up is as follows:

JMU – 08 nos., BFM-- 02 nos., Basuachak H – 2 nos, TWG – 04 nos. ,ZNA-04,GMR – 07 no.,DLN – 03 nos. ,HTZ – 08 nos. , RH – 06 nos.,PHK-04 nos, DRV-04 nos, RDUM-08 nos, BWH-09no, Sheonar.H-02 nos. ,Barahpur.H-02nos, PG section-25 nos.

ViFOB:

 

Ø01 no.FOB has been constructed at Danapur.

ØThe Landing of FOB of Fatuha station at PF no. 2 & 3 was infringing the SOD for more than 20 years since raising of Platform. Recently a new landing has been constructed and the old infringing landing has been dismantled. Thus a long old infringement has been removed.

 

vi.Circulating area:

Circulating has been constructed at Danapur & Buxar.

 

5.Water supply improved:

 

a.06 no. Deep Tube well commissionedin the division (KEU-01no,DNR-05 nos.)

b.02 nos. shallow tube well at Coaching depot, RGD has been commissioned

c.02 nos.newly RCC Tank commissioned(PNBE-01,RNCC-01)

d.10 nos. chlorination Automatic plants have been commissioned at DNR. The chlorination of water has thus again been restored in DNR colonies, station and other service building

 

 

6.Other importantworks:

 

ØThe abundant old Central School at DNR has been renovated and developed as S&T Training school which has been inaugurated by the GM/ECR on 28.11.14.

ØAll facilities for persons with disabilities have been provided at Buxar & Ara station.

ØAll work under Touch & Feel scheme have been completed at BXR & DURE station.

Ø04 nos Urinals have been provided at ZNA.

ØThe work of additional loop alongwith PI at BKG has been commissioned.

Ø12 Unit type-I & 06 units type-II quarters have been constructed at PNBE.




Source : East Central Railways / Indian Railways Portal CMS Team Last Reviewed on: 13-05-2015  


  Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.