 82/RE/250/1 13.09.2002 82/RE/250/1 Vol-II Power Supply arrangements for Signalling & Telecom Installations in 25 KV AC areas .


ECR/S&T/JPO

28.12.2005

02/2005

Insulation of Push Trolleys/Dip lorries in Track Circuited Area

ECR/S&T/JPO/185

09.08.2006

ECR/S&T/JPO/185

Computerised Control Charting

ECR/S&T/JPO/185-A

15.01.2007

01/2007

Horizontal Distance to Signalling Structural

ECR/S&T/Tele Policy/135

08.02.2007

JPC No.-2/2007

Revised Policy guidelines for BSNL/Cell phones in the office/residence of non Gaz supervisory staff.

 ECR/S&T/Tele Mobile/131 12.09.2007 08/2007 JPO for enlarging the scope of CUG phones on EC Railway and regarding the payment of CUG bills.

ECR/S&T/JPO/185-A

05/12.02.2008

2/2007 Dt 11.01.2008

Joint Inspection& Maintenance of Points & Crossings and Track Circuits by SSE/SE/JE(P.WAY) & SSE/SE/JE  (SIGNAL) including periodical measurement of implantation of Signal Structure.

ECR/S&T/JPO/185-A

16.06.2008

2/2007 Dt 16.06.2008

Corrigendum & Addendum  of Joint Circular No. 2/2007

ECR/S&T/JPO/185

31.07.2009

1/2009

Testing  of Competency of ASM/SM/Dy.SS/Panel Operator

ECR/S&T/JPO/185-A

08.02.2010

2/2009

Handing & Taking over  Signalling Assets between Open Line & Construction Organisation

ECR/S&T/JPO/185-A

      08.02.2010

3/2009

Opening of Relay Room/Cabin  Basement at Stations /Cabins

ECR/S&T/JPO/185-A

      08.02.2010

4/2009

Train Operation in case of Failure of Point.

ECR/Safety/JPO/2007

    22.08.2007

Joint Procedure Order for taking remedial action  for improvement of Level Crossing

ECR/S&T/JPO/185-A

     17.07.2008

EL/2008/3

Maintenance of Power Supply  for S&T Installation at Stations/Cabin in Electrified Section

ECR/S&T/JPO/185-A

17.12.2009

5/2009

Monitoring the Compliance in deficiencies in Track as per Joint Inspection of Points & Crossings and Track Circuits by SSE/SE/JE(P.WAY) & SSE/SE/JE  (SIGNAL)

ECR/S&T/JPO/185-A

12.07.2011

02/2010-11

Deep Screening of Points & Crossings

 ECR/S&T/JPO/185-A 27.06.2012 02/2012 

Execution & Cirtification of  Civil Engineering works in composit works floted by S&T department.


 ECR/S&T/JPO 17.01.2014 02/2013 Joint Procedure Order for Maintenance of ElectricalTraction Bond in Track Circuited Area and Periodical Joint Inspection of JE/SSE(Sig) &JE/SSE (TRD)
 ECR/S&T/JPO/185-A 15.01.2014 01/2014 Joint Procedure Order for Maintenance of Opening & Maintenance of Sliding Boom at Level Crossing Gate.
 ECR/S&T/Tele Policy/135/Pt-III 28.01.2014  Joint Procedure Order  in connection with Emergency communication Set up in Section Control in Non- RE  Area.
 ECR/S&T/JPO/185-A 11.03.2014 02/2014 Joint Procedure Order  in connection with Installation , Maintenance & Monitoring of Surveillance System installed at Entrance Gate of Central Hospital Patna.
 JPO No. 1/2013 11.07.13 01/2013 JPO for provision of Broad Band Connectivity on Lap Top for Officers JAG and above.
 Purchage or Repair & Maintenance of  Lap Tops 20/25.04.2012  JPO for Purchage or Repair & Maintenance of  Lap Tops.
 GPRS on AirTel CUG  mobile phones  08.08.2008  Provision for GPRS on AirTel CUG  mobile phones in ECR
 ECR/S&T/JPO/185A
  
 24.02.2015 04/2014 JPO for opening of Relay Room/Relay Hut/Cabin Basement at Stations/Cabins
 ECR/S&T/JPO  07/05/2015 2/2015 JPO for Monsoon Precaution for Signalling System
 ECR/S&T/JPO/185A 31.10.2013  JPO for joint procedure order for proposing new replacement work
 ECR/S&T/JPO 03.09.2014 3/2014 JPO for Replacement of PSC Sleepers for proper functioning of  track circuits after derailment.
 ECR/S&T/JPO 28.03.2017 1/2017 JPO for Maintenance of Electrical  Traction  Bond in Track circuited area  and periodical joint inspection of JE/SSE(Signal) & JE/SSE (TRD)
 ECR/S&T/JPO/185A/Pt.1 21.08.17  Block Canceelation jointly by P WAY & S&T Supervisors after cpmpletion of joint Work at Point & Crossing
 ECR/S&T/JPO/185/Pt.1 07.02.2018 EL/2017 Joint Inspection of CLS Panel & Power Supply gadgets








Source : East Central Railways / Indian Railways Portal CMS Team Last Reviewed on: 08-05-2018